Rail Coach Factory - Punjab

34415831 supply of axle mounted disc brakeaxle mounted disc brake, axle mounted disc brake system for slr coaches ( brake calliper ratio for slr = 2.48 ) , as per drawing: rdso / 2011 / cg 04 rev.01 ( without brake disc and emergency brake cable box npz 1 s or passenger emergency pilot valve ) and dy.cme / d2s letter no. md46131 dated 11 / 06 / 2015, packing instruction: packing as per standard packing => limited...

Rail Coach Factory - Punjab

34358228 supply of supply, installation & commissioning of amdbs for various types of lhb coachessupply, installation & commissioning of amdbs for various types of lhb coaches, supply of axle mounted disc brake system for ac & nac coaches as per drawing / spec. no. : rdso / 2011 / cg 04 rev.01 with amendment 1 ( without brake disc and emergency brake cable box npz 1 s or passenger emergency pilot valve ) and dy.cme / d2s letter no. md46131 dt. 11 / 06 / 2015, packing instruction : packing as per standard packing , supply of axle mounted disc brake system for ac & nac coaches as per drawing / spec. no. : rdso / 2011 / cg 04 rev.01 with amendment 1 ( without brake disc and emergency brake cable box npz 1 s or passenger emergency pilot valve ) and dy.cme / d2s letter no. md46131 dt. 11 / 06 / 2015. packing instruction : packing as per standard packing , installation & commissioning of axle mounted disc brake system for ac & nac coaches, ( , supply of axle mounted disc brake system for slr coaches ( brake calliper ratio for slr = 2.48 ) as per drawing / spec. no. : rdso / 2011 / cg 04 rev.01 ( without brake disc and emergency brake cable box npz 1 s or passenger emergency pilot valve ) and dy.cme / d2s letter no. md46131 dated 11 / 06 / 2015, packing instruction : packing as per standard packing , supply of axle mounted disc brake system for lhb slr coaches ( , installation & commissioning of axle mounted disc brake system for lhb slr coaches; ( , supply of axle mounted disc brake system for parcel van coaches ( caliper unit without hand brake with caliper ratio 2.48 and brake control panel without hand brake equipment same as in lhb ac / nac coaches ) , as per drawing / spec. no. : rdso / 2011 / cg 04 rev.01 with amendment 1 ( without brake disc and emergency brake cable box npz 1 s or passenger emergency pilot valve ) and dy.cme / d2s letter no. md46131 dt. 11 / 06 / 2015 & dy.cme / d1s letter no. md46131 dt. 01 / 10 / 2019, packing instruction : packing as per standard packing , supply of axle mounted disc brake system for parcel van coaches, ( calliper unit without hand brake with calliper ratio 2.48 and brake control panel without hand brake equipment same as in lhb ac / non accoaches ) and ( , installation & commissioning of axle mounted disc brake system for parcel van coaches ( calliper unit without hand brake with calliper ratio 2.48 and brake control panel without hand brake equipment same as in lhb ac / non accoaches ) and ( ...

Rail Coach Factory - Punjab

34278261 supply of axle mounted disc brake system with wsp for double decker coachaxle mounted disc brake system with wsp for double decker coach, axle mounted disc brake system with wsp for double decker coach as per drawing / spec. no. : rdso / 2011 / cg 04 ( rev 1 with amendment 1 ) ( without brake disc and emergency brake cable box npz 1 s or passanger emergency pilot valve ) and dy.cme / d2s letter no. md46131 dtd. 11 / 06 / 2015., packing instruction : packing as per standard packing => limited...

Department Of Defence - Punjab

33596035 bids are invited for 8 port switch , nvr , bullet camera 4mp , hard disk , cable , box , rack , hdmi , installation , domecamera 2mp , camera total quantity : 481...

Department of Higher Education - Punjab

33534951 bids are invited for poe switch 24 port with in power cord , non poe switch 48 port with in power cord , wi fi controller , indoor access point 2x2 , indoor access point 3x3 , cat 6 utp patch cord 1 meter , cat 6 utp cable box 305 meter , sfp 10gcompatible , cassing caping , installation mountingconfiguration documentation of switches and acesspoints ,laying of utp or pvc pipe or duct total quantity : 318...

Punjab State Transmission Corporation Limited - Punjab

30803721 tender for erection of 11 kv panels upto 5 nos, shifting of breakers to the site of erection, leveling and connect the bus bar. making cable joint, mounting, cable box with t/f and 11 kv incommer pannel....

Rail Coach Factory - Punjab

30321418 supply of axle mounted disc brake system for power car cocahesaxle mounted disc brake system for power car cocahes,axle mounted disc brake system for power car cocahes, as per drawing: rdso/2011/cg 04 rev.01 with amendment 1 (without brake disc and emergency brake cable box npz 1 s or passenger emergency pilot valve) and dy.cme/d2s letter no. md46131 dt. 11/06/2015, packing instruction: packing as per standard packing...

Rail Coach Factory - Punjab

30293556 supply of installation and commissioning of axle mounted disc brake system and emergency brake cable box in lhb coaches...

Rail Coach Factory - Punjab

29298602 supply of supply, installation & commissioning of items for various types of lhb coachessupply, installation & commissioning of items for various types of lhb coaches,supply of item axle mounted disc brake system for ac & nac coaches, as perdrawing/spec. no. : rdso/2011/cg 04 rev.01 with amendment 1 (without brake disc andemergency brake cable box npz 1 s or passenger emergency pilot valve) anddy.cme/d2s letter no. md46131 dt. 11/06/2015, packing instruction: packing as per standardpacking , supply of item axle mounted disc brake system for ac & nac coaches as perdrawing/spec. no. : rdso/2011/cg 04 rev.01 with amendment 1 (without brake disc andemergency brake cable box npz 1 s or passenger emergency pilot valve) anddy.cme/d2s letter no. md46131 dt. 11/06/2015., packing instruction: packing as per standardpackingpage 1 of 8 run date/time: 22/09/2021 16:13:24stores/tkj/rcftender document , installation & commissioning of item axle mounted disc brake system forac & nac coaches , supply of item axle mounted disc brake system for slr coaches (brakecalliper ratio for slr = 2.48), as per drawing/spec. no. : rdso/2011/cg 04 rev.01 (withoutbrake disc and emergency brake cable box npz 1 s or passenger emergency pilotvalve) and dy.cme/d2s letter no. md46131 dated 11/06/2015, packing instruction: packing asper standard packing. , supply of item axle mounted disc brake system for lhb slr coaches(brake calliper ratio for slr = 2.48), as per drawing/spec. no. : rdso/2011/cg 04 rev.01(without brake disc and emergency brake cable box npz 1 s or passengeremergency pilot valve) and dy.cme/d2s letter no. md46131 dated 11/06/2015, packinginstruction: packing as per standard packing. , installation & commissioning of item axle mounted disc brake system forlhb slr coaches (brake calliper ratio for slr = 2.48), , supply of item axle mounted disc brake system for parcel van coaches :(caliper unit without hand brake with caliper ratio 2.48 and brake control panelwithout hand brake equipment same as in lhb ac/nac coaches), as per drawing/spec. no. :rdso/2011/cg 04 rev.01 with amendment 1 (without brake disc and emergency brake cablebox npz 1 s or passenger emergency pilot valve) and dy.cme/d2s letter no. md46131dt. 11/06/2015 & dy.cme/d1s letter no. md46131 dt. 01/10/2019, packing instruction: packing asper standard packing.page 2 of 8 run date/time: 22/09/2021 16:13:24stores/tkj/rcftender document , supply of item axle mounted disc brake system for parcel van coaches ;(calliper unit without hand brake with calliper ratio 2.48 and brake control panelwithout hand brake equipment same as in lhb ac/ non ac coaches) as per drawing/spec. no.: rdso/2011/cg 04 rev.01 with amendment 1 (without brake disc and emergency brakecable box npz 1 s or passenger emergency pilot valve) and dy.cme/d2s letter no.md46131 dt. 11/06/2015 & dy.cme/d1s letter no. md46131 dt. 01/10/2019, packing instruction:packing as per standard packing. , installation & commissioning of item axle mounted disc brake system forparcel van coaches : (calliper unit without hand brake with calliper ratio 2.48 andbrake control panel without hand brake equipment same as in lhb ac/non accoaches) and ( , supply of item axle mounted disc brake system for lhb ra coaches (brakecalliper ratio for ra = 2.17) as per drawing/spec. no. : rdso/2011/cg 04 rev.01 (without brakedisc and emergency brake cable box npz 1 s or passenger emergency pilot valve)and dy.cme/d2s letter no. md46131 dated 11/06/2015, packing instruction : packing as perstandard packing....

MINISTRY OF HUMAN RESOURCE DEVELOPMENT - Punjab

28987676 bids are invited for boq total quantity : 1 cctv surveillance at iim amritsar hostel ( blessing city ) 1 poe switch 8 ports 3 nos 2 rack 9u 500mm with accessories ( including cable manager=1, pdu 5 socket 5 amp=1, mounting hardware ( set of 10 cage nuts ) =3 & top mounted fan=2 2 nos 3 patch panel unloaded 2 nos 4 i / o jack for pp 12 nos 5 5 mp ip camera ( pole mounted ) 12 nos 6 camera enclosure box 12 nos 7 16 channel nvr with 4k support and 2 hdd slot 1 nos 8 keyboard and mouse kit 1 nos 9 hdmi cable 4k 5 meter 1 nos 10 6 tb hdd 1 nos 11 cat6 utp cable box ( 305 meter ) 2 box 12 cat6 utp patch cord 1 meter 12 nos 13 rj 45 connector 1 box of 100 1 box 14 pvc duct 30 / 25 130 meter 15 1.5” pvc flexible 20 meter 16 hdpe pipe...

Rail Coach Factory - Punjab

28012282 supply of axle mounted disc brake system for lhb ra coachesaxle mounted disc brake system for lhb ra coaches, axle mounted disc brake system for lhb ra coaches ( brake calliper ratio for ra = 2.17 ) , as per drawing : rdso / 2011 / cg 04 rev.01 ( without brake disc and emergency brake cable box npz 1 s or passenger emergency pilot valve ) and dy.cme / d2s letter no. md46131 dated 11 / 06 / 2015, packing instruction: packing as per standard packing...

Rail Coach Factory - Punjab

27242188 supply of axle mounted disc brake system for various types of lhb coachessupply of item axle mounted disc brake system for ac & nac coaches as perdrawing/spec no. : rdso/2011/cg 04 rev.01 with amendment 1 (without brake disc andemergency brake cable box npz 1 s or passenger emergency pilot valve) anddy.cme/d2s letter no. md46131 dt. 11/06/2015., packing instruction: packing as per standardpacking , installation and commisioning of item axle mounted disc brake systemfor ac & nac coaches ( , supply of item axle mounted disc brake system for parcel van coaches(caliper unit without hand brake with caliper ratio 2.48 and brake control panelwithout hand brake equipment same as in lhb ac/ non ac coaches) as per drawing/spec. no.: rdso/2011/cg 04 rev.01 with amendment 1 (without brake disc and emergency brakecable box npz 1 s or passenger emergency pilot valve) and dy.cme/d2s letter no.md46131 dtd. 11/06/2015 & dy.cme/d1s letter no. md46131 dtd. 01/10/2019, packing instruction:packing as per standard packing , installation & commissioning of item axle mounted disc brake system forparcel van coaches (caliper unit without hand brake with caliper ratio 2.48 andbrake control panel without hand brake equipment same as in lhb ac/ non accoaches) and ( , supply of axle mounted disc brake system for parcel van coaches(caliper unit without hand brake with caliper ratio 2.48 and brake control panelwithout hand brake equipment same as in lhb ac/nac coaches), as per drawing/spec. no. :rdso/2011/cg 04 rev.01 with amendment 1 (without brake disc and emergency brake cablebox npz 1 s or passenger emergency pilot valve) and dy.cme/d2s letter no. md46131dtd. 11/06/2015 & dy.cme/d1s letter no. md46131 dtd. 01/10/2019, packing instruction: packing asper standard packing...

Rail Coach Factory - Punjab

25277350 supply of axle mounted disc brake system for various types of lhb coaches, axle mounted disc brake system for ac & nac coaches, as per drawing: rdso/2011/cg 04 rev.01 with amendment 1 (without brake disc and emergency brake cable box npz 1 s or passenger emergency pilot valve) and dy.cme/d2s letter no. md46131 dt. 11/06/2015, packing instruction: packing as per standard packing, axle mounted disc brake system for slr/ra coaches, as per drawing: rdso/2011/cg 04 rev.01 (without brake disc and emergency brake cable box npz 1 s or passenger emergency pilot valve) and dy.cme/d2s letter no. md46131 dated 11/06/2015, packing instruction: packing as per standard packing, axle mounted disc brake system for parcel van coaches ; (caliper unit without hand brake with caliper ratio 2.48 and brake control panel without hand brake equipment same as in lhb ac/nac coaches), as per drawing: rdso/2011/cg 04 rev.01 with amendment 1 (without brake disc and emergency brake cable box npz 1 s or passenger emergency pilot valve) and dy.cme/d2s letter no. md46131 dt. 11/06/2015 & dy.cme/d1s letter no. md46131 dt. 01/10/2019, packing instruction: packing as per standard packing, supply of axle mounted disc brake system for alstom lhb design ac & nac coaches as per drawing: rdso/2011/cg 04 rev.01 with amendment 1 (without brake disc and emergency brake cable box npz 1 s or passenger emergency pilot valve) and dy.cme/d2s letter no. md46131 dt. 11/06/2015, packing instruction: packing as per standard packing, installation and commissioning of axle mounted disc brake system for alstom lhb design ac & nac coaches (scope of work as per doc. no. ab 02/abs ver. 0.0 dt.22/04/19. as per drawing: rdso/2011/cg 04 rev.01 with amendment 1 (without brake disc and emergency brake cable box npz 1 s or passenger emergency pilot valve) and dy.cme/d2s letter no. md46131 dt. 11/06/2015,...

Rail Coach Factory - Punjab

24727733 supply of axle mounted disc brake system for alstom lhb design parcel van coaches, axle mounted disc brake system for alstom lhb design parcel van coaches (caliper unit without hand brake with caliper ratio 2.48 and brake control panel without hand brake equipment same as in lhb ac/nac coaches), as per drawing: rdso/2011/cg 04 rev.01 with amendment 1 (without brake disc and emergency brake cable box npz 1 s or passenger emergency pilot valve) and dy.cme/d2s letter no. md46131 dt. 11/06/2015 & dy.cme/d1s letter no. md46131 dt. 01/10/2019, packing instruction: packing as per standard packing, supply of axle mounted disc brake system for alstom lhb design parcel van coaches (calliper unit without hand brake with calliper ratio 2.48 and brake control panel without hand brake equipment same as in lhb ac/ non ac coaches) and (scope of work as per doc. no. ab 02/ abs 01 ver.0.0 dt. 29.01.2020)., as per drawing: rdso/2011/cg 04 rev.01 with amendment 1 (without brake disc and emergency brake cable box npz 1 s or passenger emergency pilot valve) and dy.cme/d2s letter no. md46131 dt. 11/06/2015 & dy.cme/d1s letter no. md46131 dt. 01/10/2019, packing instruction: packing as per standard packing, installation and commissioning of axle mounted disc brake system for alstom lhb design parcel van coaches (calliper unit without hand brake with calliper ratio 2.48 and brake control panel without hand brake equipment same as in lhb ac/ non ac coaches) and (scope of work as per doc. no. ab 02/ abs 01 ver.0.0 dt. 29.01.2020)., as per drawing: rdso/2011/cg 04 rev.01 with amendment 1 (without brake disc and emergency brake cable box npz 1 s or passenger emergency pilot valve) and dy.cme/d2s letter no. md46131 dt. 11/06/2015 & dy.cme/d1s letter no. md46131 dt. 01/10/2019, packing instruction: packing as per standard packing...

Rail Coach Factory - Punjab

24492261 supply of supply, installation & commissioning of axle mounted disc brake system for lhb design slr/ra coaches, supply of axle mounted disc brake system for alstom lhb design slr/ra coaches.as per drawing/spec. rdso/2011/cg 04 rev.01 (without brake disc and emergency brake cable box npz 1 s or passenger emergency pilot valve) and dy.cme/d2s letter no. md46131 dated 11/06/2015, installation & commissioning of axle mounted disc brake system for alstom lhb design slr/ra coaches.(scope of work as per doc. no. ab 06/abs ver. 0.0 . rate of installation & commissioning are to be quoted separately) as per drawing/spec. rdso/2011/cg 04 rev.01 (without brake disc and emergency brake cable box npz 1 s or passenger emergency pilot valve) and dy.cme/d2s letter no. md46131 dated 11/06/2015...

Rail Coach Factory - Punjab

24426389 supply of axle mounted disc brake system for alstom lhb design parcel van coaches, axle mounted disc brake system for alstom lhb design parcel van coaches (caliper unit without hand brake with caliper ratio 2.48 and brake control panel without hand brake equipment same as in lhb ac/nac coaches), as per drawing: rdso/2011/cg 04 rev.01 with amendment 1 (without brake disc and emergency brake cable box npz 1 s or passenger emergency pilot valve) and dy.cme/d2s letter no. md46131 dt. 11/06/2015 & dy.cme/d1s letter no. md46131 dt. 01/10/2019, packing instruction: packing as per standard packing, installation & commissioning of axle mounted disc brake system for alstom lhb design parcel van coaches (calliper unit without hand brake with calliper ratio 2.48 and brake control panel without hand brake equipment same as in lhb ac/ non ac coaches) and (scope of work as per doc. no. ab 02/ abs 01 ver.0.0 dt. 29.01.2020)., as per drawing: rdso/2011/cg 04 rev.01 with amendment 1 (without brake disc and emergency brake cable box npz 1 s or passenger emergency pilot valve) and dy.cme/d2s letter no. md46131 dt. 11/06/2015 & dy.cme/d1s letter no. md46131 dt. 01/10/2019, packing instruction: packing as per standard packing...

Rail Coach Factory - Punjab

23721696 supply of supply of axle mounted disc brake system for alstom lhb group 1, supply of axle mounted disc brake system for alstom lhb design parcel van coaches ( calliper unit without hand brake with calliper ratio 2.48 and brake control panel without hand brake equipment same as in lhb ac / non ac coaches ) as per drawing / spec. rdso / 2011 / cg 04 rev.01 with amendment 1 ( without brake disc and emergency brake cable box npz 1 s or passenger emergency pilot valve ) and dy.cme / d2s letter no. md46131 dt. 11 / 06 / 2015 & dy.cme / d1s letter no. md46131 dt. 01 / 10 / 2019, installation & commissioning of axle mounted disc brake system for alstom lhb design parcel van coaches ( caliper unit without hand brake with caliper ratio 2.48 and brake control panel without hand brake equipment same as in lhb ac / non ac coaches ) and scope of work as per doc. no. ab 02 / abs 01 ver.0.0 dt. 29.01.2020 as per drawing / spec. rdso / 2011 / cg 04 rev.01 with amendment 1 ( without brake disc and emergency brake cable box npz 1 s or passenger emergency pilot valve ) and dy.cme / d2s letter no. md46131 dt. 11 / 06 / 2015 & dy.cme / d1s letter no. md46131 dt. 01 / 10 / 2019...

Rail Coach Factory - Punjab

23721491 supply of group 1, supply of axle mounted disc brake system for alstom lhb design parcel van coaches (calliper unit without hand brake with calliper ratio 2.48 and brake control panel without hand brake equipment same as in lhb ac/ non ac coaches) as per drawing/spec. rdso/2011/cg 04 rev.01 with amendment 1 (without brake disc and emergency brake cable box npz 1 s or passenger emergency pilot valve) and dy.cme/d2s letter no. md46131 dt. 11/06/2015 & dy.cme/d1s letter no. md46131 dt. 01/10/2019, installation & commissioning of axle mounted disc brake system for alstom lhb design parcel van coaches (caliper unit without hand brake with caliper ratio 2.48 and brake control panel without hand brake equipment same as in lhb ac/ non ac coaches) and scope of work as per doc. no. ab 02/abs 01 ver.0.0 dt. 29.01.2020 as per drawing/spec. rdso/2011/cg 04 rev.01 with amendment 1 (without brake disc and emergency brake cable box npz 1 s or passenger emergency pilot valve) and dy.cme/d2s letter no. md46131 dt. 11/06/2015 & dy.cme/d1s letter no. md46131 dt. 01/10/2019...

Military Engineer Services - Punjab

23043286 repair of external electrification & connected items incl necessary networking & redesigning existing unbalalnce load distribution system, test equipment at af stn barnala under ge ( af ) halwara dismantling of old u / s relay & supply, installation, testing and commissioning of automaticmultifunctional real time power analyser with micro programmer scrolling dispaly device to record each electrical parameter as per site connected with 3 phase external ct operated with three phase supply voltage ( 300 480 ) volts unit ( 45 hz 55 hz ) etc as required to shut down the exsisting switching mccb ( make: partner cat no piacos / l&t / abb ) u / s current transformer of any type of ratio and replacement with new supply, installation, testing and commissioning of 3 phase metering , protection ct inside the existing low tension switchgear / breaker / swicting contactors must saturate sufficiently high to allow a relatively accurate measurement of the fault current by the protection whose operating threshold can be very high. with built in high accuracy limit factor ( alf ) ratio between the nominal overcurrent and the rated current. so that exsisting switchgear relay must be able to withstand high overcurrents also featured with real accuracy factor ratio between the overcurrent , nominal error and the rated current .with following specifications insulation level voltage 12 / 28 kv ratio 300 / 5 5 1 a core 1 5a for metering core 2 5 a for protection core 3 class ps, kpv >= 150 volts imag at vk / 2<= 30 ma , rct at 75c<= 2 ohms short time rating 15 ka for 1 second , make kappa / abb / schnider / rishabh / elmeasure n 2 dismantaling of old damaged burnt cable and bus bars and re arranging it proper by replacement with new ict suitable for 3 phase supply delta connected auto transformer which can step up & step down for synchronization electric sources of supply with bi directional command .also provided with sensor synchronised with the power supply for providing a circulating path for the zero sequence currents.with ratio 200 / 5 make kappa / abb / schnider / partner 3 disconnecting the electrical connection and painting to existing lt panel suitable for capacity up to 500 kva with two coats of red stove enameled paint, removing of old paint by scratching and applying one coat of red oxide before the paint complete all as directed by engr in charge & reconnecting all connections with new lugs , proper insulation and covering each cable box 4 dismentaling of old damaged burnt panel & , installation, testing and comissioning of weather and vermin proof indoor type lt panel factory made, front & back openable, double door type, fabricated out of 2 mm thick crca ( cold rolled closed annealed cell ) sheet compartmentalized design not less than 1.8m x 1.6m x 0.75m including mild steel channel frame of ismc 75 at the base of panel only for grouting purpose, and grouted in m 20 grade concrete using 20 mm graded stone aggregate, duly epoxy powder coated, complete with heat shrink insulated copper bus bar of 1200 amps rating 4 nos, including all connections with copper strips. pillar box shall be provided with danger notice plate with skull & bone sign, pvc gasket and sealed, making all incoming and out going electrical cable connection with new lugs, glands to be provided at cable entries, including angle iron support 50x50x6 mm with 50 cm height from ground level at the base of panel complete all as specified and as directed nincoming: ( a ) mccb, tpn 415 volts, 50hz, 800 amps, 36 ka, thermal magnetic release, ics =100% icu, front face isolataion with positive break indication with single break contacts with spreader and phase barrier 04 each n ( b ) multifunction meter as per site n ( e ) ct coils of suitable ratio 01 set. noutgoing: ( a ) lt miniature circuit breaker with new mccb 250 amps. 50 ka 4 pole, 415 volts, 50 hz for rated current at ambient temperature 50°c and conforming to is 13947 ( part 3, 1993 ) and iec : 60947 ( part 1 & 2 ) and other technical features as per ssr part i 19.100.13 with manual operated draw out type icu=ics ( 1 sec ) with microprocessor release 6l ( over load, short circuit, instantaneous and earth fault protection ) , pre trip alarm and individual fault indication led with fully rated neutral with inbuilt protection. the over load release shall be adjustable type. 5 dismantaling of old u / s and supply, installation, testing and commessioning of accurate power factor correction cum protection device 3 phase 4 wire 08 steps protection against power factor of the electrical system close to unity protection at power failure to close the capacitor bank and should not and due to sudden variation in the load the power factor shoots above unity auto shut down panel or switching off extra capacitors in delta mode factor condition. be re energized till it discharges to a safe value of 50 volts or less, relay should be instantaneous type with low voltage setting spikes / surge protection to trip the capacitor bank at overloading due to over voltage or harmonic current. over current relay tripping protection of the bank against system disturbances and faults protection of the bank against faults occurring within the bank including protection of the bank against faults occurring within the bank timer for re energisation after 5 minutes: protection to block the re switching of capacitor bank in less than 5 minutes. including with following specifications 3 phase 4 wire 3 current transformers resin cast 15 va burden 1100 volts insulation function limit the inrush current, improve the thd / pf at light load or high line, improved stability with a type 2 compensation network phase unbalance, auto phase reversal tripping suitable for exsisting apfc panels , phase missing under voltage and over voltage monitor and control, neutral open protection. also special zero crossing switching operation protection system digital display of line phase voltages and line current including frequency phase un balance ( 1 to 20% ) ( adjustable ) power consumption 15va / 3w setting accuracy voltage ± 4v, minimum setting current 0.5a, maximum setting currrent =5a ( above 5a external ct setting max.1000 / 5 in steps of 5 ) , setting accuracy current ± 5% of full scale ±1digit, trip time delay1 to 250secs settable for unbalance, overvoltage, undervoltage ( line to line & line to neutral ) , undercurrent & overcurrent, trip time accuracy± 1% of set delay ±2sec., trip setting, phase failure 3 sec max. factory set., phase reversal auto tripping, phase un balance1 to 20% ( adjustable ) , under voltage and over voltage 5v to 60v ac ( adjustable individually ) , recovery time2 sec min power on delay10 sec max., service life ( under no load ) 10lakh operations minimum , electrical life, ( under full load ) 10 lakh operations minimum protection system should be provided with each fault digital display, compensation of each phase, measure power factor , total watts, total var, total kwh, total kvarh, programmable thd protection, programmable discharge time make partner cat no piapfcpr / siemens / l&t / bch / abb 6 dismantling of old metering and replacement with new supply, installation, testing and commissioning digital display energy monitoring device without sms alerts with following specificification. completely installation using advanced, low cost, and reliable wireless communlcation technologies ( zigbee, & gprs ) . no rewiring costs, and easy to install with minimal time for commissioning.cloud hosted infrastructure: no need to host data servers, can be accessed by any internet enabled device including cell phones and tablets. minute to minute tracking of power consumption and costs involved ( as per electricity board tariff ) email alerts on critical situations sudden peaks, drop in pf, motor loading / under loading etc. compare and analyze past and current data over multiple time intervals ( daily, weekly, monthly ) tracking of power generation from grid, gensets and renewable, track roi on green infrastructure, and real cost of backup generation. tracking consumption pattern during peak hours, off peak hours and night hours as per electricity board guidelines. bench marking consuming devices against their knows production output comprehensive analytics, customized charting, automated reporting and a mis platform for the senior management team. n ( a ) modem specifications ( gprs / edge modem ) n ( a ) max power input: <1w. n ( b ) rf output power levels. n ( c ) max : 33dbm ( + / ) 2db. n ( d ) receiver sensitivity:<106dbm. n ( e ) avg power consumption ( sending data every 1 minute ) : <1w n ( f ) voltage range: 70v to 300v. n ( g ) normal operation temperature: 20 c to +55 c. n ( h ) bands: quad band. n ( i ) ports: rs485, rs232. n ( b ) ce certified gprs / edge modem. n ( a ) duel band gsm / gprs 900 / 1800 mhz ( b ) 3v3 & 5v interface for direct communication with mcu kit. n ( c ) configurable baud rate. n ( d ) sma connector with gsm antenna. n ( e ) sim card holder. n ( f ) built in network status led. n ( g ) inbuilt powerful tcp / ip protocol stack for internet data transfer over gprs. n ( h ) gprs mobile station class b. n ( i ) compliant to gsm phase 2 / 2+. n class 4 ( 2 w @ 900 mhz ) n class 1 ( 1w@ 1800mhz ) n n n n n n n 7 ( j ) control via at commands ( gsm07, 07, 07, 05 and simco menhanced at commands ) ( c ) micro controller ( a ) type msp430 5f4194. ( b ) hardware multiplier supporting 32 bit operations. n ( c ) seria on board programming no external programming voltage needed n ( d ) three channel internal dma. n ( e ) basic timer with real time clock feature. n ( f ) 12 bit analog to digital converter ( adc ) . n ( g ) up to four universal serial communication interfaces. n ( h ) unified clock system. n ( i ) flexible power management system. n ( j ) 16 bit risc architecture. n ( k ) wake up from standby mode in 3.5 us ( typical ) n ( l ) ultralow power consumption. n ( d ) spi flash. n ( a ) type winbond w25q16dv:16m bit / 2m byte ( 2, 097, 152 ) . n ( b ) programmable page 256 byte per page. n ( c ) type standard spi: clk / cs, di, do / wp / hold. n ( e ) specifications for data. n ( a ) gprs class 10: max, 85.6 kbps ( downlink ) . n ( b ) pbcch support. n ( c ) coding schemes cs 1, 2, 3, 4. n ( d ) csd upto 14.4 kbps. n ( e ) ussd. n ( f ) non transparent mode. n ( g ) ppp stack. n ( f ) interface. n ( a ) interface to external sim3v / 1.8v. n 8 ( b ) analog audio interface. n ( c ) rtc backup. n ( d ) spi interface ( option ) . n ( e ) serial interface. n ( f ) antenna pad. n ( g ) 12c. n ( h ) gpio. n ( i ) pwm. n ( j ) adc n ( g ) speecial firm ware. n ( a ) fota. n ( b ) mms. n ( c ) java ( cooperate with iasolution ) n ( d ) embeded at. n ( h ) frequency of meter reading is 1 minute. n ( j ) latency is 5 minutes, ( latency is the amount of time it takes to read data from meter and send it to server, it can be measured on onsite ) parameters reporting intervals: the web based application software and service graphical reports on following intervals:. n ( a ) 1 minute / 15 minutes / 30 minutes / hourly. n ( b ) hourly. n ( c ) daily. n ( d ) weekly n ( e ) monthly. n ( f ) yearly. n ( k ) location report. nthe user should be able to view the report of a single location well as a group of sub location over the specified period. he should be able to view the report in form of a graph, and tabular form. n ( l ) export reports in excel / csv format. n ( m ) online display of graphical charts for various electrical parameters. n 9 ( n ) define group of iemus meters based on locations. n ( o ) define the reports on cumulative kwh, and running hours, etc. n ( p ) define reports on the basic of quality of power supply like voltage imbalance, current imbalance, voltage fluctuations etc alarms and alerts: nthe web based application software and services should generate alarms and send alerts over sms messages to mobile users and emails for the conditions, such as. n ( q ) voltage in any phase goes above 260 volts with value of voltage. n ( r ) voltage in any phase goes below 180 volts with valve of voltage. n ( s ) power factor of any phase is less than 0.85 with value of power factor. n ( t ) any deviation from benchmark value of active power, apparent power and reactive power, 21.incoming power supply not available. n ( u ) ability to suppress the alerts during specified time period in a day. n ( v ) the system should be accessible anywhere through web but with a secured password protection and no software or hardware required to be installed for viewing the data on web. n ( w ) the software and server should be maintained by the firm, without cost implication, and there should not be any requirement of deploying it hardware and software. n ( x ) the web application shall be hosted on tier iii certified data center make partner caquivalent make as approved by ge minimum iso 9001:2015 certified. n 10 dismentaling of old damaged burnt fuse kit kat assembly and replace with supply instalation testing and commissioning of surge voltage arrester consisting of base element with remote indicator contact and ground connectors, for mounting on ns 35 / 7.5, nominal voltage: 230 v ac, 3 + 1 circuit protection with floating remote indication contact multi channel type 2 arresters optical, mechanical status indication for the individual arresters type 2 consistent plug in surge arresters mechanical coding of all slots disconnect device on each individual plug , ambient temperature ( operation ) 40 °c ... 80 °c ambient temperature ( storage / transport ) 40 °c ... 80 °c altitude = 2000 m ( amsl ( above mean sea level ) ) permissible humidity ( operation ) 5 % ... 95 % shock ( operation ) 25g ( half sine / 11 ms / 3x ±x, ±y, ±z ) vibration ( operation ) 5g ( 10 ... 500 hz / 2.5 h / x, y, z ) general iec test classification ii t2 en type t2 iec power supply system tn s tt mode of protection l n l pe n pe mounting type din rail: 35 mm color jet black ral 9005 housing material pa 6.6 pbt degree of pollution 2 flammability rating according to ul 94 v 0 type din rail module, two section, divisible number of positions 4 surge protection fault message optical, remote indicator contact protective circuit nominal voltage un 240 / 415 v ac ( tn s ) 240 / 415 v ac ( tt ) nominal frequency fn 50 hz ( 60 hz ) maximum continuous operating voltage uc ( l n ) 275 v ac maximum continuous operating voltage uc ( l pe ) 275 v ac maximum continuous voltage uc ( n pe ) 260 v ac rated load current il 80 a residual current ipe = 5 μa standby power consumption pc = 360 mva nominal discharge current in ( 8 / 20 ) μs 20 ka maximum discharge current imax ( 8 / 20 ) μs 40 ka current interrupt rating ifi ( n pe ) 100 a short circuit current rating isccr 25 ka voltage protection level up ( l n ) = 1.35 kv data protective circuit voltage protection level up ( l pe ) = 1.6 kv voltage protection level up ( n pe ) = 1.5 kv residual voltage ures ( l n ) = 1.35 kv ( at in ) = 1.1 kv ( at 10 ka ) = 1 kv ( at 5 ka ) = 0.9 kv ( at 3 ka ) residual voltage ures ( l pe ) = 1.6 kv ( at in ) = 1.2 kv ( at 10 ka ) = 1 kv ( at 5 ka ) = 0.9 kv ( at 3 ka ) residual voltage ures ( n pe ) = 0.4 kv ( at in ) = 0.25 kv ( at 10 ka ) = 0.15 kv ( at 5 ka ) = 0.1 kv ( at 3 ka ) tov behavior at ut ( l n ) 335 v ac ( 5 s / withstand mode ) 440 v ac ( 120 min / safe failure mode ) tov behavior at ut ( n pe ) 1200 v ac ( 200 ms / withstand mode ) response time ta ( l n ) = 25 ns response time ta ( l pe ) = 100 ns response time ta ( n pe ) = 100 ns max. backup fuse with v type through wiring 80 a ( gg ) max. backup fuse with branch wiring 125 a ( gg ) indicator / remote signaling switching function pdt contact operating voltage 5 v ac ... 250 v ac 30 v dc operating current 5 ma ac ... 750 ma ac 1 a dc connection method plug in / screw connection via combicon screw thread m2 tightening torque 0.25 nm stripping length 7 mm conductor cross section flexible 0.14 mm² ... 1.5 mm² conductor cross section solid 0.14 mm² ... 1.5 mm² conductor cross section awg 28 ... 16 connection data connection method screw connection. make citel / abb / schneider / phonix n...

Rail Coach Factory - Punjab

22895892 supply of axle mounted disc brake system for alstom lhb design parcel van coaches, axle mounted disc brake system for alstom lhb design parcel van coaches (caliper unit without hand brake with caliper ratio 2.48 and brake control panel without hand brake equipment same as in lhb ac/nac coaches)as per drawing/spec. rdso/2011/cg 04 rev.01 with amendment 1 (without brake disc and emergency brake cable box npz 1 s or passenger emergency pilot valve) and dy.cme/d2s letter no. md46131 dt. 11/06/2015 & dy.cme/d1s letter no. md46131 dt. 01/10/2019...

Rail Coach Factory - Punjab

22774507 supply of supply and apply of emergency brake cable box npz 1 s, supply of emergency brake cable box npz 1 s ( passanger emergency pilot valve and covering ) as per drawing / spec. supply of emergency brake cable box npz 1 s to knorr bremses drg.no. 2c59637 & part no. ii 18996 and covering to drg. no lh36102 alt c or sab wabcos ( m / s faiveley ) drg.no. 02 525 0947 & part no. 525 0012 00 and covering to drg. no le36126 alt c and fixing as per doc.no ab 02 / peas ver.00 22.04.19., apply of emergency brake cable box npz 1 s ( passanger emergency pilot valve and covering ) as per drawing / spec. supply of emergency brake cable box npz 1 s to knorr bremses drg.no. 2c59637 & part no. ii 18996 and covering to drg. no lh36102 alt c or sab wabcos ( m / s faiveley ) drg.no. 02 525 0947 & part no. 525 0012 00 and covering to drg. no le36126 alt c and fixing as per doc.no ab 02 / peas ver.00 22.04.19....

Rail Coach Factory - Punjab

22732370 supply of supply and apply of emergency brake cable box npz 1 s, supply of emergency brake cable box npz 1 s ( passanger emergency pilot valve and covering ) as per drawing / spec. supply of emergency brake cable box npz 1 s to knorr bremses drg.no. 2c59637 & part no. ii 18996 and covering to drg. no lh36102 alt c or sab wabcos ( m / s faiveley ) drg.no. 02 525 0947 & part no. 525 0012 00 and covering to drg. no le36126 alt c and fixing as per doc.no ab 02 / peas ver.00 22.04.19., apply of emergency brake cable box npz 1 s ( passanger emergency pilot valve and covering ) as per drawing / spec. supply of emergency brake cable box npz 1 s to knorr bremses drg.no. 2c59637 & part no. ii 18996 and covering to drg. no lh36102 alt c or sab wabcos ( m / s faiveley ) drg.no. 02 525 0947 & part no. 525 0012 00 and covering to drg. no le36126 alt c and fixing as per doc.no ab 02 / peas ver.00 22.04.19....

Rail Coach Factory - Punjab

22667607 supply of axle mounted disc brake system for alstom lhb design parcel van coaches, axle mounted disc brake system for alstom lhb design parcel van coaches (caliper unit without hand brake with caliper ratio 2.48 and brake control panel without hand brake equipment same as in lhb ac/nac coaches)as per drawing/spec. rdso/2011/cg 04 rev.01 with amendment 1 (without brake disc and emergency brake cable box npz 1 s or passenger emergency pilot valve) and dy.cme/d2s letter no. md46131 dt. 11/06/2015 & dy.cme/d1s letter no. md46131 dt. 01/10/2019...

Punjab State Transmission Corporation Limited - Punjab

21409671 tender for regarding purchase of material for 2*361 mvar 111kv capacitor bank 11kv post insulator clamp, acsr condt. 48hh1m2, pg clamp 48 mm2, 11kv single core size 300 mm outdoor, 11 kv cable box single core size 300 mm indoor...

Rail Coach Factory - Punjab

19268182 tender for emergency brake cable box npz 1 s or passanger emergency pilot valve and coveringitem list : (1) emergency brake cable box npz 1 s or passanger emergency pilot valveand covering as per knorr bremses drg. no. 2c59637 & part no. ii 18996 and coveringto drg. no. lh36102 alt.c or sab wabcos (m/s. faiveley) drg. no. 02 525 0947 & part no. 5250012 00 and covering to drg. no le36126 alt.c...

Rail Coach Factory - Punjab

18757166 tender for axle mounted disc brake system for alstom lhb design power car cocahesitem list : (1) axle mounted disc brake system for alstom lhb design power carcocahes as per rdso/2011/cg 04 rev.01 with amendment 1 (without brake disc andemergency brake cable box npz 1 s or passenger emergency pilot valve) anddy.cme/d2s letter no. md46131 dated 11/06/2015dy. punjab 82.00 set...

Indian Railway - Punjab

17715645 tender for axle mounted disc brake system for alstom lhb design power carcocahes as per rdso/2011/cg 04 rev.01 with amendment 01 (without brake disc andemergency brake cable box npz 1 s or passenger emergency pilot valve) anddy.cme/d2s letter no. md46131 dated 11/06/2015...

Diesel Locomotive Works - Punjab

16892436 tender for cable box with terminal pad assembly for auxiliary alternator. col i ofdrawing no. detc/us 7 1 015 alta....

Diesel Locomotive Works - Punjab

16796649 tender for cable box with terminal pad assembly for auxiliary alternator. col i ofdrawing no. detc/us 7 1 015 alta....

Rail Coach Factory - Punjab

16792976 tender for axle mounted disc brake system for alstom lhb design ldslr (lhb designsecond class cum luggage and brake van with compartment for pwds with underslung power pack 500kva) coaches.as per rdso/2011/cg 04 rev.01 (without brake discand emergency brake cable box npz 1 s or passenger emergency pilot valve ) anddy. cme/d2s letter no. md46131 dated 11/06/2015 & dy. cme/d1s letter no. md46131 dated08/11/2017...

Diesel Locomotive Works - Punjab

16783327 tender for cable box with terminal pad assembly for auxiliary alternator. col i ofdrawing no. detc/us 7 1 015 alta....

Rail Coach Factory - Punjab

13507658 supply of axle mounted disc brake system with wsp for lhb design double decker coachas per rdso/2011/cg 04 without brake disc and emergency brake cable box npz 1 s or passanger emergency pilot valve and dy.cme/d2s letter no. md46131 dt. 11/06/2015....

Rail Coach Factory - Punjab

13070929 supply of axle mounted disc brake system with steel brake disc ep assist system for alstom lhb design power car coaches for operation at 200 kmphas per mdts 23265 rev.01 without emergency brake cable box or passenger emergency pilot valvequantity:  13.00...

Rail Coach Factory - Punjab

13070928 supply of axle mounted disc brake system with steel brake disc ep assist system for alstom lhb design ac coaches for operation at 200 kmph.as per mdts 23265 rev.01 without emergency brake cable box or passenger emergency pilot valvequantity:  62.00...

Rail Coach Factory - Punjab

13069583 supply of emergency brake cable box npz 1 s or passanger emergency pilot valve and without coveringas per knorr bremses drg.no. 2c59637 part no. ii 18996 or sab wabcos m/s faiveley drg.no. 02 525 0947 part no. 525 0012 00....

Rail Coach Factory - Punjab

12325473 supply of axle mounted disc brake system for alstom lhb design power car cocahes for developmentas per rdso/2011/cg 04 rev.01 without brake disc and emergency brake cable box npz 1 s or passenger emergency pilot valve and dy.cme/d2s letter no. md46131 dt. 11/06/2015quantity:  10.00...

Rail Coach Factory - Punjab

12325472 supply of axle mounted disc brake system for alstom lhb design ac nac coaches for developmentas per rdso/2011/cg 04 rev.01 without brake disc and emergency brake cable box npz 1 s or passenger emergency pilot valve and dy.cme/d2s letter no. md46131 dt. 11/06/2015quantity:  20.00...