FAZILKA COOPERATIVE SUGAR MILLS LTD - Punjab

40721029 tender for work of pan incharge for season 2023 24 to supervise all jobs at pan station. to maintain vacuum and pressure (exhaust and vapour) at pan station. to conduct the dosing of chemicals in pans and syrup tanks. to maintain the colour of syrup/ sugar. to monitor the stock of syrup, melt and molasses in the storage tanks to monitor the preparation of seed in seed crystallizer to monitor the dosing of seed slurry to monitor the preparation of massecuite according to their standard parameter to monitor and maintain the stock of massecuite in crystallizer (including vacuum crystallizer) to maintain optimum crushing and produce good quality sugar with minimum losses....

FAZILKA COOPERATIVE SUGAR MILLS LTD - Punjab

40334544 tender for work of pan incharge for season 2023 24, to supervise all jobs at pan station. to maintain vacuum and pressure (exhaust and vapour) at pan station. to conduct the dosing of chemicals in pans and syrup tanks. to maintain the colour of syrup/ sugar. to monitor the stock of syrup, melt and molasses in the storage tanks to monitor the preparation of seed in seed crystallizer to monitor the dosing of seed slurry to monitor the preparation of massecuite according to their standard parameter to monitor and maintain the stock of massecuite in crystallizer (including vacuum crystallizer) to maintain optimum crushing and produce good quality sugar with minimum losses....

Department of Cooperation - Punjab

40249450 tender for fabrication and erection job work 2 replacement of syrup sulphitor top portion & recovery tower as per drg. scope of jobs: i. dismantling of existing top portion & recovery tower ii. fabrication of top portion & recovery tower with increased dia as per drg. iii. erection of recovery tower at shifted place as per drg. iv. fabrication and erection of baffle plates v.fabrication and erection so to supply cone inside the syrup sulphitor. 3 dismantling, fabrication & erection of semi kestner poly baffle box ( as per drg. ) scope of work: a. cutting, grinding ofss plate b. fitting of ss plates in box c. erection of poly baffle box 4 dismantling, shifting & erection ofms purlin at approx. 30 mtr height to make suitable for fitting of acc sheets size 3’ x 10’ 5 dismantling and shifting ofvertical crystallizer drive fromcsm zira& fitting of the drive at csm bhogpur in vertical crystallizer 6 fabrication & erection of juice sulphiter shaft bush fitting and folding channels fitting with shell 7 dismantling, fabrication & erection of juice sulphiter spurger to be made from ss plate with drilling as per drg....

Co Operative Sugar Factories Federation Ltd - Punjab

40205090 tender for following works tubes cleaning by high pressure water jet tubes cleaning by high pressure water jet of evaporator bodies (7 nos.) 1) semi kesner (1000m 2) semi kesner (800m³) 3) vapour cell 4) 1 body 5) 2nd body 6) 3 body 7) 4 body centrifugal machines plc/scada automation system. complete plc/scada and automation panel, working with remote panel including display 8 inch siemens make plc/scada system complete wire with machine poxy sensor including commissioning of cf machine with one crushing season warranty for buckau wolf make flat bottom type c/f machine capacity 750 kg/charge mechanical tube cleaning of evaporator bodies. (7 nos.) 1) semi kesner (1000m³) 2) semi kesner (800m²) 3) vapour cell 4) 1 body 5) 2nd body 6) 3 body 7) 4th body tube cleaning of pans 05 nos. all juice heater tube cleaning and its allied units. caustic soda/scale softner addition in respective bodies after receiving from store and bringing to respective station electromagnetic flow meter 6 with digital display rate of flow 30m/hr for measuring the treated effluent complete in all respect. repairing of electromagnetic flow meter 6 including its digital display. dismantling, fabrication & erection of juice distribution plate of dorr. modification of sulphur furnace repairing of internal part of save all of sk 1000m² dismantling, fabrication & erection of 1 flate of partition plate of juice heater distribution both top and bottom box. make kirlosker/ sintech lime pump of 27 m. hr capacity head 30 mtrs k.w. 9.3 rpm 1450 suction 80mm delivery 50mm with ci body & working part ss sludge pump suction 4 delivery 4 capacity 75 m/hr head 15 mtrs rpm 1440 with ci body & working part ss make kirlosker/k.s.b/sintech centrifugal pump having capacity 40 m mtr hr head 30 mtrs with ci body ss impeller, ss working part suitable for pumping 60 bx syrup/ melt high flow pump & spares high flow pump size 4 x 4 model psl 21410 aabn capacity 30 m/hr, head 30 mtrs, rpm 480, drive 15 hp with ss rotor ss connecting rod & ss shaft. heating arrangement with electric heater complete in all respect for hot air blower instead of steam for drying the 20 ton sugar/hour in hopper for 2500 tcd sugar plant. conical flask 250 ml, make borosil measuring cylinder 10ml, make borosil pipette (bulb) make borosil 50 ml 25 ml 5 ml measuring flask, make borosil 1000 ml 500 ml 250 ml 10 ml beaker 250 ml 100 ml funnel glass 4 inch half stem wash bottle plastic 500 ml mug plastic 1 itr mug aluminum or steel 500 ml bucket plastic 12 ltr 5 ltr reagent bottle glass 1 ltr mud flask (wide mouth) 200ml forecape for muffle furnace length apps 1.5 feet (steel) weighing scale digital capacity maximum 10 kg accuracy ±1gm ph meter digital pen type thermometer (red mercury make zeal) temp. 0 110°c indicator paper bromothymole blue universal indicator paper ph range 2.0 10.5 hot plate 1500 2000 watt beat quality whatman filter sheet size 42 cm x 56 cm buffer table 4,7,9.2 carbon de sulphite conc. hydrochloric acid oxalic acid mercuric chloride ethyle alcohol 500ml x 10 500 ml sodium oxalate sodium chloride lead sub acetate (basic lead acetate) make devis or qualigen fitter paper ordinary 18.5 cm circle make kalpi maintenance charges for automatic online continuous effluent monitoring system (ocems) at etp for crushing season 2023 24. [make system s.p.a.] model micromac eco along with the online transmission of data for bod, cod, tss, ph,flow rate to the server of ppcb/cpcb system included: a. online cod, bod tss and ph analyzers. b. online transmission of data. bag stitching thread 1000 meter long breaking strength 7 8 kg/mtr. jute twin 3 ply x 72 breaking strength 14 lb/ft. green colour marker red colour marker cleaning & washing of boiling bouse equipments after close of crushing season ie. dorr, js, s.f. r.v.f.. juice weighing scale, syp & molasses tanks, crystallizer (all type) pug mills, magma mixer. melter, tank (ah,bh,cl), gutter etc. and ground & upper floor. terms/conditions: 1. tool and tackles will be provided by the mills 2. mill is not responsible for any mishappening of your persons. 3. contractor shall deploy sufficient man power to the above jobs within week 4. work should be done with the satisfaction of chief chemist bringing of lime & sulphur from sulphur vehicle to go down. preparation of mol daily in three shift during crushing season 2023 24 four persons per shift also they have to follow the instruction of cc for any other misc. job in spare time. daily juice heater tube cleaning and boxing up per day two persons. complete cleaning of juice weighing scale and dsm screen with hot water. contract of operation & supervision of etp & apcd for the crushing season 2023 24 electric crane/lift for lifting of lime with motor (starter) complete in all respect capacity 01 ton. ...

Department of Cooperation - Punjab

40052487 etender for purchase of planetary gearbox , supply of planetary reduction gearbox with motor suitable for crystallizer of 85 ton capacity driven by existing 25 h.p. motor, shaft size 220 mm, rpm 1. make:top gear / elecon / wil...

FAZILKA COOPERATIVE SUGAR MILLS LTD - Punjab

39210974 tender for supply of fabrication & erection (2023 24)., replacement of bottom of vacuum/air cooled/ water cooled crystallizer by 8/10mm plate modification of cane cutter and leveler by fitting jointing of approx. 01 foot wide m.s. plate 8mm. thick raise up the hood casing 01 foot modification of cane carrier shot before 1st mills, base plate slope to be change fabrication m.s. nrv valve 14 modification of c/f machine structure a.) replacement of bottom m.s. channel/beam 150m of plate form and 300mm bed of c/f machine 1,2,3 b.) to rising the height of c/f machine no. 4,5 by installing the m.s. beam 400mm below the bed of c/f machine and other modification like lifting of pug mill etc. also included in this task....

FAZILKA COOPERATIVE SUGAR MILLS LTD - Punjab

39180090 tender for supply of planetary gear box 2023 24. planetary crystallizer gear box with motor for 45 ton capacity for a massecuite type crystallizer drive model 4kt 07 chxh reduction ratio 466.60 mounting shaft orientation horizontal input elect. motor 100 fs input power 3hp input speed 1440 rpm output shaft hollow 150 mm dia output speed 2.90 rpm lubrication oil....

FAZILKA COOPERATIVE SUGAR MILLS LTD - Punjab

38516469 tender for repair and maintenance for season 2023 24 • repair and maintenance of all 05 pans and its hydraulic testing and repairing of all related valves with allied structure and trail & testing. • repair and maintenance of all crystallizers (including vacuum crystallizers & seed crystallizers) with its drive system and all related valves and allied structure and its trial £aqs+(va • repair and maintenance of all condensers with its valve and all kruc l4rewi wi its trial & testing. any o’cher by chief chemist/chief engineer...

Department of Cooperation - Punjab

38437341 purchase of planetary gear box e tender for purchase of planetary gear box , supply of planetary reduction gearbox with motor suitable for crystallizer of 85 ton capacity driven by existing 25 h.p. motor, shaft size 220 mm, rpm 1. make:top gear/elecon / wil , supply of planetary reduction gearbox with motor suitable for crystallizer of 65 ton capacity driven by existing 15 h.p. motor, shaft size: 165 mm, rph 40. make:top gear/elecon / wil...

Department of Cooperation - Punjab

38147240 tender for fabrication and erection jobs 1 m.s / c / i pipe line including upto 12 dia 2 dismantling 3 erection 4 dismantling of old & refitting of same after cleaning departmentally 5 m.s pipe lines above 12 dia including exhaust / vapour pipe ( minimum rate will be given for 3 meter length even for small length ) 6 dismantling 7 fabrication 8 erection 9 m.s nipples including upto 12 dia 10 dismantling 11 fabrication 12 erection 13 m.s nipple above 12 dia 14 dismantling 15 fabrication 16 erection 17 m.s cross, bend, reducer, tee upto 12 dia 18 dismantling 19 fabrication 20 erection 21 m.s cross, bend, reducer, tee above 12 dia 22 dismantling 23 fabrication 24 erection 25 s.s pipe line including upto 8 dia 26 dismantling 27 fabrication 28 erection 29 s.s nipples including upto 8 dia 30 dismantling 31 fabrication 32 erection 33 s.s cross, bend, reducer, tee upto 8 dia 34 dismantling 35 fabrication 36 erection 37 valve up to 12 dia 38 dismantling 39 erection 40 valve above 12 dia 41 dismantling 42 erection 43 patch work maximum 3 x 3 ( min. rate per feet2 will be given for 1 x 1 even for small patches ) 44 replacement of brass tube 45 juice heaters 46 evaporators 47 pans 48 replacement of s.s tube 49 juice heaters 50 evaporators 51 pans 52 gutter below 5mm thickness of ms / gi sheets for all heights & roof gutters 53 dismantling 54 fabrication 55 erection 56 gutter above 6mm thickness of m.s sheets for all heights 57 cone up to 12 dia from m.s sheet 58 dismantling 59 fabrication 60 erection 61 cone above to 12 dia from m.s sheet 62 dismantling 63 fabrication 64 erection 65 square tank of any size form m.s plate 66 dismantling 67 fabrication 68 erection 69 round tank of any size from m.s plate 70 dismantling 71 fabrication 72 erection 73 platform of any size without structure 74 dismantling 75 fabrication 76 erection 77 platform of any size with structure 78 dismantling 79 fabrication 80 erection 81 railing of any type 82 dismantling 83 fabrication 84 erection 85 fabrication of ladder / stairs case from angle / channel / flate / pipe 86 fixing of angle 87 50mm 88 65mm 89 75mm 90 fixing of channel 91 100mm 92 125mm 93 150mm 94 200mm 95 fixing of flate 96 40mm 97 50mm 98 65mm 99 dismantling & fitting of both top and bottom covers of juice heater including vljh 100 replacement of distribution box of juice heaters of double beat valve along with nipples etc. 101 replacement of partition plate of compartment of juice heater 102 replacement of cooling jacket of scrubber / cooling pipe 103 dismantling 104 fabrication 105 erection 106 m.s scrubber of suplhur furnance including nipples 107 dismantling 108 fabrication 109 erection 110 melter & reciever of sulphur furnance 111 dismantling 112 fabrication 113 erection 114 m.s screw conveyor for mud mixer 115 dismantling 116 fabrication 117 erection 118 mud mixer without screw converyor 119 dismantling 120 fabrication 121 erection 122 water condensor of vaccum filter 123 dismantling 124 fabrication 125 erection 126 coil in dorr, melter, cf machine & steam coil etc 127 dismantling 128 fabrication 129 erection 130 stirrer arms including its sweeping plates of dorr 131 dismantling 132 fabrication 133 erection 134 dismantling & fitting of partition plate of dorr compartment 135 dismantling & fitting of mud bood of dorr compartment 136 dismantling & fitting of juice distribution plate of dorr compartment 137 dismantling, fabrication & erection of man hole with cover condensate bottle small size 138 dismantling 139 fabrication 140 erection 141 condensate bottle large size / syrup bottle 142 dismantling 143 fabrication 144 erection 145 replacement of down take ( dismantling, fabrication & erection ) of pan. 146 save all of 60 ton pans & v.c 147 dismantling 148 fabrication 149 erection 150 umbrella of 60 ton pans & v.c 151 dismantling 152 fabrication 153 erection 154 save all of evaporators 155 dismantling 156 fabrication 157 erection 158 umbrella of evaporator body 159 dismantling 160 fabrication 161 erection 162 m.s ribbon / strip in crystallizer 163 dismantling 164 fabrication 165 erection 166 repairing of cf basket ss ring by welding 167 replacement of air distribution plate ( d.f.e ) of multitray sugar hopper 168 replacement of runner / flat of sugar & seed elevator chain 169 dismantling of old 170 fitting of new 171 replacement of angle of sugar & seed elevator chain 172 dismantling of old 173 fitting of new 174 replacement of bucket ( dismantling, fabrication & fitting ) 175 m.s flanges / blind 176 dismantling 177 fabrication including drilling 178 erection 179 replacement of strainer ( d.f.e ) of injection pump & cooling tower pump etc 180 fabrication of motor cover, fan cover, coupling guard 181 up to 20 h.p 182 above 20 h.p 183 bed frame for pump & motor + gear box 184 dismantling 185 fabrication 186 erection 187 bed frame for pump + motor only 188 dismantling 189 fabrication 190 erection 191 shed above electrical board etc with structure 192 dismantling of old 193 new structure & fitting of g.i / m.s sheet above 194 replacement of wornout side plate of molasses storage tank ( 3000m3 ) 195 dismantling 196 fabrication 197 erection 198 replacement of wornout roof of molasses storage tank with structure ( 3000m3 ) 199 dismantling 200 fitting 201 erection 202 arms of melter, magma, pug mill, seed crystallizer 203 dismantling 204 fitting 205 erection 206 replacement of wornout s.k ( 1000m2 ) body shell 207 dismantling 208 fabrication 209 erection 210 roof structure of lime shed without acc / gi sheet. 211 structure & column 212 dismantling 213 fabrication 214 erection 215 modification of juice sulphiter 216 scope of work 217 sock limimg arrangement 218 replacement of bottom 219 perforation plate to be provided up to working height 220 stirrer along with shaft to be provided 221 stirrer driving arrangement to be provided 222 m.s pipe lines above 12 dia including exhaust / vapour pipe 223 dismantling 224 fabrication 225 erection 226 dismantling of perforated plate of rake carrier 227 fabrication & erection perforated plate 228 complete dismantling of secondary cane carrier bottom plate 229 fabrication & erection of secondary cane carrier bottom plate 230 dismantling of boiler ducting 231 fabrication & erection of boiler ducting 232 dismantling, fabrication & erection of mill house screw conveyor 233 dismantling, fabrication & erection of dsm screen body complete with pipe line 234 replacement of worn out runner of pcc secondary, inter carrier, elevator, mbc, rbc, cross 235 replacement of worn out mill house juice tray from 8 10mm plate 236 dismantling, fabrication, modification & erection of cutter hood for reverse / forward direction working 237 fabrication & erection of rotary feeders at both the boilers along with base frame with gear boxes and gear chain drives 238 patch work of cane carrier side plate 239 fabrication of rakes secondary / inter carrier rake carrier 240 repair of bagasse chute from cross carrier to boiler furnance 241 dismantling and fitting of steam valve at nb with inlet and outlet pipe line and nipple etc...

Department of Cooperation - Punjab

38010704 dismantling, fabrication and erection jobs part ( a ) and ( b ) 1 replacement of worn out of m.s. runner of pcc, scc, icc, elevator, rbc and cross carrier chains 2 replacement of s.s. tubes of all juice heaters, vapour line juice heater and semi kestner. 3 replacement of s.s. tubes of all juice heaters, vapour line juice heater and semi kestner the number of tubes below 50 no. 4 replacement of s.s. tubes of all juice heaters, vapour line juice heater and semi kestner all pans during off season 5 replacement of s.s. tubes of all juice heaters, vapour line juice heater and semi kestner evaporators during off season 6 replacement of s.s. tubes of all juice heaters, vapour line juice heater and semi kestner in case of entire body of evaporator 7 welding joints of water, juice, vapour and exhaust pipe lines of all sizes, any tank, pans, evaporator body etc. 8 pipe line upto 12” dia 9 a)dismantling 10 b)erection 11 pipe line above 12”diafrom ms plate 12 a)dismantling 13 b)fabrication 14 c)erection 15 replacement of s.s pipeline of any size: 16 b)dismantling 17 c) erection 18 bends from readymade pipe line upto 12 dia 19 a) dismantling 20 c)erection 21 bends above 12” dia from ms plate 22 a)dismantling 23 b)fabrication 24 c)erection 25 tee, nipples & crosses upto 12” dia 26 a)dismantling 27 b)fabrication 28 c)erection 29 tee, nipples & crosses above 12” dia from m.s plate 30 a)dismantling 31 b)fabrication 32 c)erection 33 reducers of all sizes, 34 a)dismantling 35 b)fabrication 36 c)erection 37 flanges of all sizes, 38 a)dismantling 39 b)fabrication 40 c)erection 41 valves of all sizes: 42 a)dismantling 43 b)erection 44 c) fabrication 45 man holes ofall sizes 46 a)dismantling 47 b)fabrication 48 c)erection 49 platform: 50 a) dismantling 51 b) fabrication & erection 52 m.s. structure worklight 53 a)dismantling 54 b)fabrication 55 c)erection 56 m.s. structure work heavy 57 a)dismantling 58 b)fabrication 59 c)erection 60 m.s. tank completehaving round & conical & rectangular bottoms 61 a)dismantling 62 b)fabrication 63 c)erection 64 m.s rubber seated valves of any types 65 a)dismantling 66 b)fabrication 67 c)erection 68 nrv of any type: 69 a)dismantling 70 b)fabrication 71 c)erection 72 platform pipe line railing of all sizes 73 a) dismantling 74 b) erection 75 fabrication of s.s rubber seated valves and nrv of all sizes 76 m.s. patch work 77 fabrication and erection m.s. stair; 78 a) monkey tower type 79 b) step type 80 repair of rubber seated valves above 12 dia 81 repair of nrv valves above 12 dia 82 straighteningm.s plate 83 strengthening of any structure with m.s angle/channel 84 s.s. to s.s. welding 85 fabrication and erection of all type of pump + motor bed. 86 drilling and tapping of mills top roller of square end face having size 8 20m at 265 pcd and 50mm deep thread for fitting of ropeless coupling. 87 replacement of fibrizor deflector plate along with ss lining. (01 job) 88 replacement of worn out casing of fibrizor 89 replacement of worn out pcc, scc and icc chain trough. 90 fabrication and erection of mill roller crown pinion guard. (04 no.) 91 replacement of cane cutting knives of chopper 92 replacement of cane cutting knives of swing type cutter (01 job) 93 replacement of fibrizer hammers with tip 94 but only domite tips 95 dismantling, fabrication & erection ofmills juice tray (m.s. plate) 96 fabrication of scc and inter carrier chains rake. 97 repair of secondary cane carrier & inter carrier chains rake. 98 hard facing of trpf roller 99 to build mills roller crown pinion teeth as per standard template of teeth. 100 but mill roller coupling square section as per standard size 101 fabrication oftrpf juice tray 102 fabrication oftrpf top roller cover(02 nos.) 103 dismantling, fabrication and erection of donnelly chute of mills (02 nos.) 104 to build up the mill roller journal as per standard size. 105 complete repair of trpf pressure chute, including replacement of worn out s.s. plate 106 fabrication of mill top roller scrapperassembly as per existingsize & design 107 fabrication of discharge roller scrapper assembly. 108 replacement of worn out bottom boot of inter carrier chain. 109 installation of transmission gear plumber block job includes re alignment and modification of bed. 110 boiler house 111 replacement of cast iron furnace chute of j.t. and texmaco boilers. 112 fabrication of rbc slats made out from 3 mm thick plate for both rbc chain 113 repair of rbc slat 114 replacement of worn out complete straight portion and taper portion of texmaco boilers chimney along with ladder case as per existing size and design. job includes wet scrubber outlet ducting connection and complete paint work as well. specification as below: size : 2450 od x 10mm thick x 10 mtr long ,size : 2450 od x 08mm thick x 10 mtr long (01 job) 115 replacement of worn out wet scrubbers main chamber and ducting for texmaco boiler. 116 replacement of m.s. bagasse chute of j.t. and texmaco boilers. 117 replacement of worn out furnace door ofj.t. boilers without frame 118 replacement of worn out furnace door ofj.t. boilers with frame 119 repair & fitting of furnace door of texmaco/jt boiler 120 a) fabrication of steam drum partition plates ofboilers 121 b) repair of steam drum partition plates of boilers 122 below mentioned work of boiler damper for texmaco and j.t. boilers. 123 a)dismantling 124 b)fabrication 125 c)erection 126 repair work boiler dampers for texmaco and j.t. boilers. 127 repair of id fan of j.t & texmaco boiler 128 repair of fd fan of j.t & texmaco boiler 129 fabrication of bagacillo blower as per our existing size and design duly balanced 130 boiling house 131 replacement of worn out various types of strainers of juice pump, lime pumps and syrup pumps. 132 replacement of shell portion of pan no. 3 except save all (01 job) 133 fabrication and erection of molasses conditioner for c light. (01 job) 134 dismantling of existing umbrella of semi kestner and fabrication, erection of semi kestners umbrella as per size and design(01 job) 135 complete replacement of worn out save all of evaporator bodies in all respects. 136 complete replacement of worn out save all of pans in all respects. 137 replacement of worn out vapour pipe of various sizes of pans going to condenser 138 replacement of worn out steam/general coil of ordinary design 139 size ½ to 3 140 size 4to 6 141 replacement of worn out steam/general coil of pure circular design 142 size ½ to 3 143 size 4 to 6 144 dismantling, fabrication & erection of vapour pipe line bends of pans, leading from body shell to condensers. full bend 145 900 mm 146 1100 mm 147 1250 mm 148 dismantling, fabrication & erection of vapour pipe line bends of pans, leading from body shell to condensers. half bend : 149 900 mm 150 1100 mm 151 1250 mm 152 replacement of gutters 153 a) dismantling 154 b) fabrication 155 c) erection 156 a) replacement of worn out stirrer arms(straight type) 157 b) replacement of worn out stirrer arms(worm type) 158 replacement of worn out umbrella of pans 159 a) replacement of all pipe line of sulphur burners cooler, complete in all respect. 160 b) replacement of worn out portion of sulphur burner cooler inside pipeline. 161 complete replacement of worn out after burner of sulphur furnace i.e. including the replacement of internal pipe line also 162 dismantling, fabrication and erection of sulphur burner melter of sulphur furnaces. 163 replacement of worn out bagacilo pipe line made out from g.i/h.r plain sheet of standard size 164 replacement of y type steam connection for syrup and molasses tank at pan station 165 replacement of vacuum filter agitator 166 fitting & modification of planetary gear box along with dismantling of existing gear system. 167 80 ton (01 job) 168 60 ton (01 job) 169 40 ton (01 job) 170 replacement of worn out partition plates of headers of juice heaters. 171 dismantling of worn out ms strips of top portion of juice heater and erection of ms/en 8 square bar 172 dismantling of worn out ms strips of bottom portion of juice heater and erection of ms/en 8 square bar for rubber holding. 173 lowering the height of evaporator body no. 1 (01 job) 174 centrifugal station 175 a) replacement of hopper trough 176 b) replacement of complete portion of hopper tray 177 replacement of molasses chute of 178 a) continuous centrifugal machine 179 b) batch type centrifugal machine 180 replacement of any worn out shell portion of pug mills/magma mixers. 181 modification of cooling coils of overhead crystallizer into air cooled type. 182 dismantling of existing, obsolete aaw machines including all accessories i.e. pug mill, structure, elect. panel etc. along with motors.(03 job) 183 erection, alignment & commissioning of four speed 750 kg/charge batch type c/f machine with elect. motor, panel & pneumatic plough discharger assembly. any modification & fabrication of base frame/ existing edifice, pugmill, pipeline and etc. will be in contractors work scope.(01 job) 184 fabrication and erection of molasses outlet box from 750kg/charge b&w machines bottom to existing syrup separator.(01 job) 185 electrical work 186 fabrication & erection of cable tray 187 replacement ofthimble (any size) 188 checking of cable connections, cleaning of thimbles & reconnection 189 replacement of switches/mccb 630 amp,400 amp and250 amp 190 replacement/erection of changeover switch box 125 amp,250 amp, 400 amp and 630 amp 191 structural repair and modification of existing changeover, mccb or any other panel switch box. ...

Department of Cooperation - Punjab

37959204 supply of cooling coil of vertical cristellizer , supply of cooling coils of vertical crystallier , supply of cooling coils of vertical crystallizer as per drg. ce 370 cooling coil to be made from m.s pipe, class c, dia:65 n.b. make – jindal/tata coil length 75 mtr. & hydraulically tested at 3kg/cm2 note supplier should have to approved the drawing before execution of work from the mills...

Department of Cooperation - Punjab

37901963 tender for contract jobs of dismantling, fabrication and erection for the year 2023 24 2 dismantling of m.s. pipe, 1 to 12 dia 3 erection of m.s. pipe 1 to 12 dia 4 fabrication of m.s. pipe line above 12 dia from m.s. plate 5 dismantling of m.s. pipe line above 12 dia 6 erection of m.s. pipe line above 12 dia 7 fabrication of s.s. pipe line 6 to 24 dia from s.s.plate 8 dismantling of s.s. pipe line 6to 24 dia 9 erection of s.s. pipe line 6 to 24 dia from s.s. plate 10 fabrication of nipple 1 to 12 dia 11 erection of nipple 1 to 12 dia 12 dismantling of nipple above 12 dia 13 fabrication of nipple above 12 dia 14 erection of nipple above 12 dia 15 dismentling of bend 1 to 12 dia 16 fabrication of bend 1 to 12 dia 17 erection of bend 1 to 12 dia 18 dismantling, fabrication and erection of bend above 12 dia from ms plate 19 dismentling of reducer / tee 1 to 12 dia 20 fabrication and erection of reducer / tee1 to 12 dia 21 dismantling of valve 1 to 12 dia 22 erection of valve 1 to 12 dia 23 dismantling of valve above 12 dia 24 erection of valve above 12 dia 25 cutting and fittingof old flanged / blind 1 and above 26 dismantlingfabrication and erection, of platform 27 dismentling , fabrication and erection of railing 28 replacement of worn out bottomplateof molasses / syrup storage tank. 29 fabrication of vapour pipe bend 36 to 40 dia 30 dismentling and erection of vapour pipe bend 36 to 40 dia 31 dismentling, fabrication and erection of umbrella of quad body 32 dismentling, fabrication and erection of umbrella ofpan body 33 dismentling fabrication and erection ofstrainers 34 dismentling fabrication and erection of bed of any type of pumps and motor or reduction gear box with motor. 35 dismantling of vapour pipe 36 to 40 dia 36 fabrication of vapour pipe 36 to 40dia 37 erection of vapour pipe 36 to 40 dia 38 dismantling, fabrication and erection of save all of pans from 8 mm to 12 mmm.s. plate 39 dismantling, fabrication and erection of save all of quads from 8 mm to 12 mmm.s. plate 40 dismentling, fabrication and erection of top plate of save all of panand quad 41 dismentling, fabrication and erection of outer shellof save all of pan and quad 42 dismentling, fabrication and erection of inner portion of save all of pan and quad 43 replacement of j pipe in vapour cell / quad body / pan 44 dismantling, fabrication and erection of coil of molasses tank 45 patch work 46 stengthing of umbrella of pan / evaporator bodies 47 dismentling, fabrication and erection ofbroken arms of any crystallizers. 48 dismentling, fabrication and erection of wornout shaft ofcrystallizer 49 fabrication and erection of distributor in down take of pans 50 replacementof bottom compartment grooves for fitting of rubber strips of juice heaters. 51 erection of super heater at centrifugal machine with all existingconnections 52 dismentling & erection of transient heater with all existing connections above centrifugal machine. 53 dismantling, fabrication and erection ofinjection header size 600 / 800mm dia with 10mm plate 54 replacement of pan body shell from calenderia to top cone 55 replacement of worn out pan body shell upto 1.25 mtr portion or part 56 dismentling, fabrication and erection of top cone of pans 57 replacement of rvf agitator 58 replacement of ms flat / runner / side plates / ms railing / square bar etc. for chains of mill house. 59 replacement of ms bottom trough of rbc / be chain 60 replacement of runner along with supporting angle / channel for canecarrier chain / inter carrier chain 61 dismantling, fabrication & erection of ms plate of cane carrierside plates with supports 62 dismantling & erection of platform from old scrap material 63 dismantling & erection of ibr pipelineupto 6” dia 64 dismantling & erection of ibr bends / reducers / nipple upto 6” dia 65 dismantling and erectionof ibr valve upto 6” dia 66 fabrication and erection of flanged end observation / cleaning doors for economiser ofboiler no. 2 67 dismantling, fabrication , erection of boiler id fan flue gas ducting 68 replacement of shell of wet scrubber along with ms mesh from ms plate 69 dismantling, fabricationerection of fd fan ducting of boiler no.2 with supports 70 patchwork of wet scrubber casing / ducting / bottom cone / clarifier 71 dismantling, fabricationerection ofdamper of id / fd fan of boiler with supports 72 fabrication and fittingof id fan suction bend for boiler 73 dismantling and fittingof existing id fan duct from id fan to wet scrubber along with supports etc for boiler 74 patch work of outer front msplate of chamber near bagasse feeder boiler 75 dismantling , fabricationand erection of ms ducting from wet scrubber outletto chimney for boiler 76 dismantling , fabricationand erection of ms ducting one meter long at suction ofwet scrubberfor boiler 77 dismantling , cleaning , testing, paintingand refitting of gilled type economiser elements . no. of elements are 48 no.s. hydraulic test also to be done after fitting of all elements. 78 dismantling , fabricationand erection of perforated plate ofwet scrubberfor boiler 79 fabrication and erection of staircase at cane unloader along with railing , platform etc. 80 dismentling, fabrication and erection of broken ribbon of any crystallizer. 81 replacement of old brass / ss tubes with new ss tubes of second body of quad by dismantling , fitting and expansion of tubes , ( approx. quantity of tubes : 1100 no.s ) hydraulic testing after replacement of tubes and painting the calandria before fitting of tubes 82 replacement of old brass / ss tubes of with new ss tubes of quad / vapour cell 83 replacement of ss tube of juice heaters / vljh 84 replacement of brass / ss tube of any pan...

Department of Cooperation - Punjab

37882761 contract for dismantling fabrication and erection of batala csm for the year 2023 24 , ms pipeline up to 12 dia , a ) dismantling , c ) erection , ms pipe line above 12 dia including vapour / exhaust pipe , a ) dismantling , b ) fabrication , c ) erection , seamless pipeline up to 12 dia , a ) dismantling , c ) erection , seamless bend upto 12 dia , a ) dismantling , c ) erection , cross reducer, tee, nipple upto 12 dia , a ) dismantling , b ) fabrication , c ) erection , cross, reducer, tee nipple above 12 dia , a ) dismantling , b ) fabrication , c ) erection , a ) valve upto 12 dia , a ) dismantling , b ) erection , b ) valve above 12 dia , a ) dismantling , c ) erection , bend upto 12 dia , a ) dismantling , b ) fabrication , c ) erection , bend above 12 dia , a ) dismantling , b ) fabrication , c ) erection , flange of all size , a ) dismantling , b ) fabrication , c ) erection , square & round tanks with flat bottom of any size , a ) dismantling , b ) fabrication , c ) erection , round tanks withconical tank of any size , a ) dismantling , b ) fabrication , c ) erection , cone / saucer of any size , a ) dismantling , b ) fabrication , c ) erection , gutters of ms plate of any size , a ) dismantling , b ) fabrication , c ) erection , roof gutter with 3mm thick plate & 4ft wide , a ) dismantling , b ) fabrication , b ) erection , a ) platform of any size ( only plate ) , a ) dismantling , b ) fabrication& erection , b ) ms structure , a ) dismantling , b ) fabrication & erection , fabrication of ladder / stair case from angle / channel / flat / pipe plate , trouses coloumn, beam related to roof , a ) dismantling , b ) fabrication , c ) erection , purlin , a ) dismantling , b ) fabrication , c ) erection , m.s patch work max. upto 20 sq.ft at individual station , mill house , dismantling, fabrication and erection of cane cutter hood. , replacement of runner flat of cc, rc, intercarrier, be, rbc sugar, seed elevator chain & cross carrier. , a ) dismantling , b ) fitting of new , replacement of angle / channel cc, rc, intercarrier, be, rbc sugar seed elevator chain & cross carrier. , a ) dismantling , b ) fitting of new , replacement side plate of cc, rc, be, rbc, hopper & cross carr , replacement of bottom trough hopper, be, rc. rbc, cross carr , dismantling, fabrication and erection juice tray of mill , dismantling, fabrication and erection of donnelly chute of mills , dsm screen juice recevining top& bottom tray , a ) dismantling , b ) fabrication , dismantling, fabrication & erection of any bed of motor, pump & gear box , a ) below 50 hp , b ) above 50 hp , replacement of rack carrier boot , replacement of cutter / id fan motor , boiler , replacement of worn out ducting , replacement of worn out casing , a ) id fan , b ) fd fan , repair of worn out casing , a ) id fan , b ) fd fan , replacement of boiler fans , a ) id , b ) fd , c ) sa , dismantling, fabrication & erection of fan plumber block bed. including fitting & leveling of plumber block , a ) id , b ) fd , c ) sa , boiler refractory m.s plate for side wall , a ) dismantling , b ) fitting of new / old , dismantling, fabrication & erection of boiler id fan , dismantling, repair & erection of boiler id fan damper , dismantling, fabrication and erection of worn out portion of wet scrubber , replacement of worn out furnacedoor. , boiling house , replacement of worn out raw juice / sulphited juice pump. strainer , repair of worn out weight juice receiving tank , fabrication & erection of man hole with blind cover , pan / evaporator , replacement of worn out of saveall of evaporator bodies ( including inner shell, outer shell, top plate & impeller , replacement of worn out of saveall of evaporator bodies ( including inner shell, outer shell, top plate & impeller , replacement of impeller of pan & quad , replacement of top / bottom taper plate of pans & quad , patching / repair work inside boiling houe equipment like pan, quard & clarifier , dismantling, fab.& erect. of vapour pipe bends , a ) full bend , b ) half bend , replacement of umbrella of pans , fabrication& erection of steam coils for syrup and molasses tank , replacement of umbrella for evaporator station , dismantling fabrication & erection of j pipe for saveall of any body , dismantling fabrication & erection of pan / quad body , dismantling fabrication & erection of condensate bottle of any size , fab. & erection of side glass for pan / quad , dismantling fabrication & erection of condensate water receiving pocket for cylindria of pan and quad. , replacement of brass / s.s tubes of juice heater / vapour line juice heater , a ) dismantling , b ) fitting , replacement of brass / s.s tubes of quard / vapour cell & pan station , a ) dismantling , b ) fitting , c ) cutting of brass / s.s tube any size , juice heater , a ) replacement of jh partition plate , b ) replacement of worn out groove out partition plate , repair of tube plate of vapour line juice heater , clarifier , replacement of coils in dorr , oliver filter , dismantling, fabrication & erection of bagacillo cyclone , replacement of worn out bagacillo pipeline made out from gi plain sheet , dismantling, fabrication & erection of agitator of oc filter , m.s screw conveyor , a ) dismantling , b ) fabrication , c ) erection , bagacillo screen , a ) dismantling , b ) replacement of new screen & erection , c ) fabrication fram , sulphur furnace , replacement of cooler of sulphur burners , replacement of sulphur cooler burner pipeline , dismantling, fabrication & erection of sulphur burner melter for sulphur furnance , m.s scrubber of sulphur furnace , a ) dismantling , b ) fabrication , c ) erection along with connection valves and pipes etc , dismantling, fabrication & erection of sulphur furnance chamber , crystallizer central shaft with ribbon , a ) dismantling , b ) fabrication , c ) erection , crystallizer arm , a ) dismantling , b ) fabrication , c ) erection , m.s ribbon in crystallizer , a ) dismantling , b ) fabrication , c ) erection , dismantling, fabricaion & erection of central tube shaft with cooling coil for water cooled crystallizer 40 tonns capacity. , worn box for crystallizer , a ) dismantling , b ) fabrication , c ) erection , dismantling and refitting of big gear of crystallizer , replacement of bottom plate of crystallizer , dismantling, fabrication & erection of seed crystallizer shaft , centrifugal station , replacement of hopper trough , impeller of hot / cold air blower , a ) dismantling , b ) fabrication , c ) erection with drive system complete , m s casing of hot / cold air blower , a ) dismantling , b ) fabrication , c ) erection , fabrication of m.s bucket for sugar / seed elevator. , magma / melter / pugmill arms , a ) dismantling , b ) fabrication , c ) erection , dismantling, fabrication, erection of ms chute for grader , spray pond , dismantling, fabrication and erecton of s.s cluster including s.s plate / flangs / reducer & increasing length by 1 meter , replacement of foot valve of spray pump , dismantling , erection , dismantling, fabrication & erection of spray pump strainer , dismantling & erection of flow meter , molasses tank , repair of roof and some round portion ( shell ) of molasses tank...

Ajnala Cooperative Sugar Mills Limited - Punjab

37851263 tender for supply of following items and following works supply of m.s pipe and bend, s.s pipe, industrial paints ferrotal no.1 boiler paint approxior no.2 boiler paint chimney paint black bus green paint yellow paint red paint smoke gray hard glaze no.1 red oxide primer aluminum paint (industrial) heat resistance thinner paint brush size 2 & 4 anti acid & anti alkali heat resistance off white paints white enamel nuts and bolts liquidation, cleaning & white washing of cooling tower including cleaning of spray nozzles & top roof. cleaning & white washing of inlet & outlet of injection channel. liquidation, cleaning & white washing of etp (equalisation tank, effluent drain inlet & outlet, aeration tank, clarifier, sludge beds/tanks etc. cleaning and white washing of hot and cold ugr cleaning, painting and wgite washing of mfg. department juice /water weighing scale and its allied units juice sulphitor and its allied units vacuum filter and its allied units lime station and its allied units dorr clarifier and its allied units syrup sulphitor and its allied units evaporator body tube plate cleaning and its allied units pans and vapour pipes and its allied units: syrup, molasses tanks and gutters vacuum and open crystallizer sulphur furnace and its allied units condensers, injection and ejector pumps vertical crysatellizer pugmills, magma, molasses tanks, pump and pipe lines all centrifugal machines and its allied units sugar melter and its allied units hopper and grader sugar and seed elevator molassca weighing scale and its allied units all syrup lines burning, cleaning and painting supply of m.s fabricated valve with driving wheel, i.b.r, non ibr valves and cocks, pump and pumps spares, packing and jointing, iron and steel fabrication and erection works reconditioning of parts of both rvf drums and cacuum filter drums supply of spares for rotary vacuum filter, rope less coupling for mill roller drive, packinng and jointing, acc and cgi sheets and accessories, replacement of acc/ cgi/ cc sheets and ridges, hardware materials manilla rope white lead make last red lead make last m. seal hacksaw blade x 12(miranda make) tellon tape rustolene ltrs tin) brasso 250 ml pack) blue paste shellac compound graphite powder ½ kg (packing: emery paste 400 gms packing) make corborundum corse (rough) do fine emery tape(carborundum) 2 width fine 2 width rough emery cloth (carborundum fine rough a) hold 500 m liquid at the compound cotton waste white (best qualny) did dhoti marking cloth borax powder (suhaga) hose pipe clamp (heavy duty) ...

Department of Cooperation - Punjab

37830526 tender for fabrication and erection jobs 1 m.s / c / i pipe line including upto 12 dia 2 dismantling 3 erection 4 dismantling of old & refitting of same after cleaning departmentally 5 m.s pipe lines above 12 dia including exhaust / vapour pipe ( minimum rate will be given for 3 meter length even for small length ) 6 dismantling 7 fabrication 8 erection 9 m.s nipples including upto 12 dia 10 dismantling 11 fabrication 12 erection 13 m.s nipple above 12 dia 14 dismantling 15 fabrication 16 erection 17 m.s cross, bend, reducer, tee upto 12 dia 18 dismantling 19 fabrication 20 erection 21 m.s cross, bend, reducer, tee above 12 dia 22 dismantling 23 fabrication 24 erection 25 s.s pipe line including upto 8 dia 26 dismantling 27 fabrication 28 erection 29 s.s nipples including upto 8 dia 30 dismantling 31 fabrication 32 erection 33 s.s cross, bend, reducer, tee upto 8 dia 34 dismantling 35 fabrication 36 erection 37 valve up to 12 dia 38 dismantling 39 erection 40 valve above 12 dia 41 dismantling 42 erection 43 patch work maximum 3 x 3 ( min. rate per feet2 will be given for 1 x 1 even for small patches ) 44 replacement of brass tube 45 juice heaters 46 evaporators 47 pans 48 replacement of s.s tube 49 juice heaters 50 evaporators 51 pans 52 gutter below 5mm thickness of ms / gi sheets for all heights & roof gutters 53 dismantling 54 fabrication 55 erection 56 gutter above 6mm thickness of m.s sheets for all heights 57 cone up to 12 dia from m.s sheet 58 dismantling 59 fabrication 60 erection 61 cone above to 12 dia from m.s sheet 62 dismantling 63 fabrication 64 erection 65 square tank of any size form m.s plate 66 dismantling 67 fabrication 68 erection 69 round tank of any size from m.s plate 70 dismantling 71 fabrication 72 erection 73 platform of any size without structure 74 dismantling 75 fabrication 76 erection 77 platform of any size with structure 78 dismantling 79 fabrication 80 erection 81 railing of any type 82 dismantling 83 fabrication 84 erection 85 fabrication of ladder / stairs case from angle / channel / flate / pipe 86 fixing of angle 87 50mm 88 65mm 89 75mm 90 fixing of channel 91 100mm 92 125mm 93 150mm 94 200mm 95 fixing of flate 96 40mm 97 50mm 98 65mm 99 dismantling & fitting of both top and bottom covers of juice heater including vljh 100 replacement of distribution box of juice heaters of double beat valve along with nipples etc. 101 replacement of partition plate of compartment of juice heater 102 replacement of cooling jacket of scrubber / cooling pipe 103 dismantling 104 fabrication 105 erection 106 m.s scrubber of suplhur furnance including nipples 107 dismantling 108 fabrication 109 erection 110 melter & reciever of sulphur furnance 111 dismantling 112 fabrication 113 erection 114 m.s screw conveyor for mud mixer 115 dismantling 116 fabrication 117 erection 118 mud mixer without screw converyor 119 dismantling 120 fabrication 121 erection 122 water condensor of vaccum filter 123 dismantling 124 fabrication 125 erection 126 coil in dorr, melter, cf machine & steam coil etc 127 dismantling 128 fabrication 129 erection 130 stirrer arms including its sweeping plates of dorr 131 dismantling 132 fabrication 133 erection 134 dismantling & fitting of partition plate of dorr compartment 135 dismantling & fitting of mud bood of dorr compartment 136 dismantling & fitting of juice distribution plate of dorr compartment 137 dismantling, fabrication & erection of man hole with cover condensate bottle small size 138 dismantling 139 fabrication 140 erection 141 condensate bottle large size / syrup bottle 142 dismantling 143 fabrication 144 erection 145 replacement of down take ( dismantling, fabrication & erection ) of pan. 146 save all of 60 ton pans & v.c 147 dismantling 148 fabrication 149 erection 150 umbrella of 60 ton pans & v.c 151 dismantling 152 fabrication 153 erection 154 save all of evaporators 155 dismantling 156 fabrication 157 erection 158 umbrella of evaporator body 159 dismantling 160 fabrication 161 erection 162 m.s ribbon / strip in crystallizer 163 dismantling 164 fabrication 165 erection 166 repairing of cf basket ss ring by welding 167 replacement of air distribution plate ( d.f.e ) of multitray sugar hopper 168 replacement of runner / flat of sugar & seed elevator chain 169 dismantling of old 170 fitting of new 171 replacement of angle of sugar & seed elevator chain 172 dismantling of old 173 fitting of new 174 replacement of bucket ( dismantling, fabrication & fitting ) 175 m.s flanges / blind 176 dismantling 177 fabrication including drilling 178 erection 179 replacement of strainer ( d.f.e ) of injection pump & cooling tower pump etc 180 fabrication of motor cover, fan cover, coupling guard 181 up to 20 h.p 182 above 20 h.p 183 bed frame for pump & motor + gear box 184 dismantling 185 fabrication 186 erection 187 bed frame for pump + motor only 188 dismantling 189 fabrication 190 erection 191 shed above electrical board etc with structure 192 dismantling of old 193 new structure & fitting of g.i / m.s sheet above 194 replacement of wornout side plate of molasses storage tank ( 3000m3 ) 195 dismantling 196 fabrication 197 erection 198 replacement of wornout roof of molasses storage tank with structure ( 3000m3 ) 199 dismantling 200 fitting 201 erection 202 arms of melter, magma, pug mill, seed crystallizer 203 dismantling 204 fitting 205 erection 206 replacement of wornout s.k ( 1000m2 ) body shell 207 dismantling 208 fabrication 209 erection 210 roof structure of lime shed without acc / gi sheet. 211 structure & column 212 dismantling 213 fabrication 214 erection 215 modification of juice sulphiter 216 scope of work 217 sock limimg arrangement 218 replacement of bottom 219 perforation plate to be provided up to working height 220 stirrer along with shaft to be provided 221 stirrer driving arrangement to be provided 222 m.s pipe lines above 12 dia including exhaust / vapour pipe 223 dismantling 224 fabrication 225 erection 226 dismantling of perforated plate of rake carrier 227 fabrication & erection perforated plate 228 complete dismantling of secondary cane carrier bottom plate 229 fabrication & erection of secondary cane carrier bottom plate 230 dismantling of boiler ducting 231 fabrication & erection of boiler ducting 232 dismantling, fabrication & erection of mill house screw conveyor 233 dismantling, fabrication & erection of dsm screen body complete with pipe line 234 replacement of worn out runner of pcc secondary, inter carrier, elevator, mbc, rbc, cross 235 replacement of worn out mill house juice tray from 8 10mm plate 236 dismantling, fabrication, modification & erection of cutter hood for reverse / forward direction working 237 fabrication & erection of rotary feeders at both the boilers along with base frame with gear boxes and gear chain drives 238 patch work of cane carrier side plate 239 fabrication of rakes secondary / inter carrier rake carrier 240 repair of bagasse chute from cross carrier to boiler furnance 241 dismantling and fitting of steam valve at nb with inlet and outlet pipe line and nipple etc...

Sugar Commissioner - Punjab

37818391 tender for supply of items 1. welding electrodes & welding material 2. rubber material 3. hardware material 4. gm liner/ gm bearing 5. air cooled crystallizer 6. vacuum crystallizer 7. spares for cfg machine 8. electrical material 9. supply of da oxygen gas 10. ci/cs casting 11. tools & tackles 12. instrumentation 13. packing & jointing 14. paint & varnish 15. plc for 750kg centrifugal machine 16. other mill material...

Department of Cooperation - Punjab

37793908 supply of pelantry gear box , supply of planetary gear box with motor of speed 1440 rpm output speed suitable for vertical crstallizer having capacity 150 mt having service factor 2.50 electrical motor 3 phase 415 volt power suitable for same; output shaft dia as per existing crystallizer’s shaft. , for b massecuite crystallizer 0.75 rpm , for c massecuite crystallizer 0.50 rpm make: kavitsu transmission/ dynamic oil/flender /elender /magtorque note: depute concernengineer for the same fortaking exact dimensions , supply of planetary gear boxwith motor of speed 1440 rpm output speed suitable for horizontalb massecuite pug millshaving 6.0 meter long , 1.0 rpm...

Department of Cooperation - Punjab

37793906 tender for fabrication and erection work 2 dismantling of ms / gi / ss pipe line size 1 / 2 to 12 erection of ms / gi / ss pipe line size 1 / 2 to 12 3 dismantling ofms / ss pipe line size 14 to 50fabrication ofms / ss pipe line size 14 to 50 3mm / 6mm / 8mm / 10mm / 12mmerection of faricated ms / ss pipe line size 14 to 50 4 dismantling of c i pipe line upto 12erection of c i pipe line upto 12 5 dismentalling of ms / ss nipple upto 12dia and upto 1 meter longfabrication of ms / ss nipple upto 12dia and upto 1 meter longerection of ms / ss nipple nipple upto 12dia and upto 1 meter long 6 dismentalling of faricated ms / gi / ss nipple size 14to 50and upto 1 meter longfabrication ofms / gi / ss nipple size 14 to 50 and upto 1 meter longerection of faricated ms / gi / ss nipple size 14 to 50 and upto 1 meter long 7 dismentalling of ms / ss bend upto 12dia fabrication of ms / s bend upto 12dia erection of ms / ss bend upto 12dia 8 dismentalling of ms / gi / ss bend size 14to 50fabrication ofms / gi / ss bend size 14 to 50 erection of faricated ms / gi / ss bend size 14 to 50 9 dismentalling of ms / ss cone size upto 100fabrication of ms / ss cone size upto 100 erection of ms / ss cone size upto 100 10 dismentalling of c i bend upto 12erection of c i bend upto 12 11 dismantling of c i tee upto 12erection ofc i tee upto 12 12 dismantling of c i cross upto 12erection ofc i cross upto 12 13 dismantling of ms / ss tee size upto 100fabrication of ms / ss tee size upto 100 erection of ms / ss tee size upto 100 14 dismantling of ms / ss crosssize upto 100fabrication of ms / ss cross size upto 100 erection of ms / ss cross size upto 100 15 dismantling of railing of pipe. fabrication of railing pipe erection of railing pipe 16 fixing of g.i wire weaved fencing around cold water reservoir 17 dismantling and washing of old flange 18 fabrication and drilling of flange from ms plate 19 replacement of square bar / rail 40mm / 50mm 20 replacement of runner flat of cane carrier / secondary cane carrier / irc / bagasse elevator / mbc / rbc 65mm / 75mm 21 replacement of angle of cane carrier / secondary cane carrier / irc / bagasse elevator / mbc / rbc 65mm / 75mm / 90mm 22 replacement of side plate of cane carrier / secondary cane carrier / irc / bagasseelevator / mbc / rbc chains6mm / 8mm 23 dis.fab. and erection of hood of cane leveller / cane chopper with supporting angle 10mm / 12mm 24 dis.fab. and erection of both side plate of hood of cane leveller / cane chopper with supporting angle 10mm / 12mm 25 dis.fab. and erection of both side plate ( ms / ss 10mm / 12mm ) of fibrizer with supporting angle 26 dis.fab. and erection of front side plate ( ms / ss 10mm / 12mm ) of fibrizer with supporting angle 27 dis. fab. and erection of roundtrough of secondary cane carrier / irc / bgasse elevator / mbc / rbc 8mm / 10mm / 12mm plate 28 dis. fab. and erection of base plate ( ms / ss 8mm / 10mm / 12mm ) of secondary cane carrier / irc / bagasse elevator / mbc / rbc 29 fabrication of rakesof secondary cane carrier / irc with attachmentfrom ms pipe size 4 and 1 30 fabrication of rakes of bagasse elevator / mbcwith attachmentfrom ms pipe size 3 and 1 31 dismentalling of ms / ss round / square tankfabrication of ms / ss round / square tankerectionof ms / ss round / square tank 32 dismentalling bagacilo screen framefabrication bagacilo screen frameerectiontion bagacilo screen frame 33 dismentallingbagacilo railing framefabricationbagacilo railing frame erectiontionbagacilo railing frame 34 dismentalling of ci / gm sluice / angle / butterfly valve size upto 16erection of ci / gm sluice / angle / butterfly valve size upto 16 35 dismentalling of pan discharge butterfly valveerection of pan discharge butterfly valve 36 dismentalling of ss / brass tube of evaporators ( s.k, v.c, quads ) fitting of ss / brass tube of evaporators ( s.k, v.c, quads ) 37 dismentalling of ss / brass tube of pansfitting of ss / brass tube of pans 38 dismentalling of ss / brass tube of juice heatersfitting of ss / brass tube of juice heaters 39 ms straight / right angle valve size 300mm, 350mm, 400mm, 450mm, 600mm, 700mm, 900mm and 1000mmdis.erection 40 hydaulic testing of evaporators ( s.k, v.c, quads ) hydaulic testing of panshydaulic testing of juice heaters 41 ms blindsize 1 to 50dis.fab.erection 42 dismentalling of gi / colored coated sheetfitting of gi / colored coated sheet 43 dismentalling of acc sheetfitting of acc sheet 44 dismentalling of ms / ss reducer size upto 100fabrication of ms / ss reducer size upto 100 erection of ms / ss reducer size upto 100 45 dismentalling of staircasingfabrication of staircasingerection of staircasing 46 dismentalling of monkey ladderfabrication of monkey laddererection ofmonkey ladder 47 dismentalling of fabricated frame of pump & motorfabrication of frame of pump & motorerection of frame of pump & motor 48 dismentalling of juice / water / syrup / molasses pumperection of juice / water / syrup / molasses pump 49 dismentalling of injection / spray / massicuite / magma pumperection of injection / spray / massicuite / magma pump 50 dismentalling of motor upto 50hperectionof motor up to 50hp 51 dismentalling of motor 55 hp to 250 hperectionof motor 55 hp to 250 hp 52 dismentalling of bewelgeared discharge valve and fitting of butterfly valve with modification of nipple & flange 53 strengthening of building structure column binder 54 replacement of vljhdismantling & erection of vapour line juice heater.all dismantled connectionsto be connected. levelling &alignment to be made. 55 replacement of shell of pan 60 tondismantling fabrication& erection of pan shell.all dismantled connections to be connected. 56 replacement of save all of pandismantling & erection of save all of pan . all dismantled connections to be connected. 57 replacement of stirrer shaft of air cooled crystalizer a, b & c dismantling & erection of stirrer shaft of air cooled crystalizer a, b & c . all dismantled connections to be connected. dismantling & fitting of drive gear arrangement. 58 replacement of top cone of pandismantling & erection of top coneof pan . all dismantled connections to be connected. 59 replacement of bottom cone of pandismantling & erection of bottom coneof pan . all dismantled connections to be connected. 60 replacement of cooling coils of vertical crystallizer as per drg. dismantling & erection of cooling coils of vertical crystallizer . all dismantled connections to be connected. 61 shifting of 50 tons capacity panfrom old mill to new milldismantling & erection of 50 tons capacity pan . all dismantled connections to be connected 62 shifting of vacuum crystallizer a in place of vaccum crystallizer c at the same floor dismantling & erection of vacuum crystallizer a in place of vaccum crystallizer c . all dismantled connections to be connected. 63 shifting of 50 ton air cooled crystallizer from old plant to new plantdismantling & erection of 50 ton air cooled crystallizer . all dismantled connections to be connected and drive arrangement 64 replacement of center shaft of juice clarifierdismantling , erection and alignment of center shaft of juice clarifier . all dismantled connections to be connected. 65 replacement of mud bootdismantling, fabrication & erection of mud boot. all dismantled connections to be connected. 66 replacement of compartment bottom plate of juice clarifier dismantling fabrication & erection of compartment plate 67 dismantlingofmassecuitegutter fabricationofmassecuitegutter erectionofmassecuitegutter 68 dismantling , fabrication & erection of dorr compartment shell with ms plate channel angles.the erection work for this will also include all connections which are dismantled during dismantling. 69 dismantling , fabrication & erection of dorr compartment / chamber roof with ms plate channel angles supports.the erection work for this job will also include all connections which are dismantled during dismantling. 70 dismantlingof top / bottom cover of juice heater erection of top & bottom cover 71 dismantling & erection ofsquare channel for rubber strip fitting ofjuice heaters 72 dismantling , fabrication and erection of compartment box of juice heater 73 dismantling of horizontal sugar melter and to be shifted as per the directions of ce / cc 74 shifting& erection of verticalsugar melter for reprocessing of moist sugar dismantling & erection of old vertical sugar melter for reprocessing of moist sugar. all dismantled connections to be connected with drive arrangement 75 cantilever provided at the top of o.c.filter to lift the drum at the height appx 10.0 meter from ground floor. 76 dismantling of old mud mixer scroll fabrication and erection of newmud mixerscroll 77 modification of mud mixer trough to increase the length of mud mixer trough by approx. 1 mtr. 78 replacement ofbagacilo line dismantling, fabrication and erection of bagacilo line 79 dismantling, fabrication and erection of bagacilo cyclone 80 ms new sulphur furnace ( complete ) fabrication & erection of sulphur furnace as per drg. / as per instructions of ce / cc 81 fabrication & erection of ms shoot for dsm screen 82 fabrication , erection of corrugated 6. / 8 inch wide plate for equal water distributing at etp 83 dismantle, fabrication and erection of sperger m.s. pipe having length 500mm app, dia 14.0 inch dia 84 dismantling, fabrication and erection of worn out stirrer arm of vertical crystallizers drive. 85 replacement of distance piece of vapour pipe upto 1.5 mtr 86 sulphur furnace ( extra work ) scope of worka. topbaffle plate to be dismantle and erected 250 mm away from existing site.b. dismantling of existing worn outbaffle plate , fabricate and erect at existing site 87 gate frame of magma mixturescope of worka. fabricationof frame along with ms channel.b. drill to be made in both ms channel.c. erection of frame at site 88 fabrication and erection of sulphur furnace heating element coil of sulphur furnace melter.a fabrication of nipples and erection at sulphur melter systemsb fabrication of nipples and erection of sulphur melter receiver 89 shifting of sugar hopper fromold plant to new plantdismantling & erection of sugar hopper. 90 erection & commissioning of hopper tray with decking plate, connection arrangementof connecting rod and angle klits for wooden strips fitting approx. length 10 mtr. 91 dismantling, shifting and erection of sugar elevator from old plant to new plant complete with structure 92 dismantling, shifting and erection of sugar graderfrom old plant to new plant complete with structure 93 planetary gear boxerection & commissioningof planetary gear box at vertical crystallizerany additional job to complete theerection work of planetary gear boxto be carried out by the contractor 94 fabrication & erection of pneumatic shoot of grader 95 erection of pneumatic clamps of grader 96 repair of stirrer shaft of vacuum crystallizer dismantling & erection of stirrer shaft of vacuum crystallizer after repair 97 strengtheningof stirrer shaft of air cooled crystallizer• dismantling & erection of stirrer shaft of air cooled crystallizer after repair. 98 dismantling of platform fabrication of platform erection of platform 99 fabrication and erection of cane unloader bridge platform 100 dis, feb, & errection of umbrella of pan along with its supports. 101 dismantling of j pipe of pans fabrication of j pipe of pans erection of j pipe of pans 102 dismantling of vapour / exhaust pipe size 700mm / 900mm / 1000mm / 1100mm fabrication of vapour / exhaust pipefrom 8mm / 10mm thick plate erection of vapour / exhaust pipe 103 dismantling of structure as per the instruction of ce fabricationof structure erection ofstructure 104 patch work of different equipments 105 to straight the old damaged vapour pipe and round tank for platform. 106 dismantling of steam coil of molasses storage tank at pan station size 1” to 2”. fabricationof steam coil of molasses storage tank at pan station size 1” to 2”. erection of steam coil of molasses storage tank at pan station size 1” to 2”. 107 dis, fab, & errection of juice coil of juice clarifier size 4”, 5” & 6” alongwith its nipple 108 dis. fab & erection of wt. juice pump strainer 109 dismantling, fabrication and erection of pan save all top plate 110 planetary gear boxerection of planetary gear box ofhorizontalcrystallizer 111 replacement of old gate valve with new gate valve of crystallizers 112 dismantling of double beat valve and erection of same of juice heater at existing site. 113 dismantling of old transient heater and erection of new transient heater along with all connections and valve. 114 fabrication & erection of factory structure complete window ( frame & grills ) 115 modification, & erection of mill house rotary screen inlet juice tank &platform 116 fabrication and erection of excess bagasse carrier to rbc as per the dirction of ce scope of work ( a ) fabrication and erection of column and structure for belt conveyor , along with drive system and discharge chute to rbc column and steel structure 117 fabrication and erection of cooling tower structure and shed 118 strengthening of pans / vacuum crystallizershell with angle and channels in round shape with ms angle 75mmx75mm and dia 4mtr ( two rounds ) 119 strengthening of evaporator shell with angle and channels in round shape with ms angle 75mmx75mm and dia 2.80mtr ( two rounds ) 120 dismantling , fabrication & erection of juice feed boxes of juice heater double beat valve.the erection work for this job will also include all connections which are dismantled during dismantling. 121 dismantling , fabrication & erection of melter of sulphur furnace as per existing design. this work include dismantling and erection of all connections, man hole, flanges etc. 122 dismantling , fabrication & erection of scrubber of sulphur furnace as per existing design. this work include dismantling and erection of all connections, man hole, flanges etc. 123 replacement of sealing ring of dorr mud boot 124 dismantling , fabrication & erection of worn out heavy / light vacuum tank of rvf including all connections. 125 dismantling , fabrication & erection of ms barometric condenser of rvf. this job will include all connections which are dismantled during dismantling. 126 dismantling , fabrication & erection of bottom trough of rvf 127 dismantling , fabrication & erection of down take of pan from 10 / 12 plate 128 dismantling , fabrication & erection distributor of pans 129 replacement of feed box of pans including all connections 130 fitting of pad, ribbes on shaft of air cooled crystlizer / vaccum crystlizer and fitting of angle and ribben...

Department of Cooperation - Punjab

37793779 tender for fabrication job ( major jobs and general jobs ) 1 replacement of worn out m.s. vertical supporting channels & side plate of final molasses storage tank with m.s plate and channels. 2 replacement of worn outroofof final molasses storage tank with m.s plate 4 / 5 / 6mm and supporting channel / angle. 3 dismantling , fabrication and erection of top ms plate of pan no1. 4 strengthening of pans shell with angle and channels in round shape with ms angle 75x75mm and dia 4.34 mtr. ( 3 rounds ) 5 strengthening of evaporator shell with angle and channels in round shape with ms angle 75x75mm and dia 2.80 mtr. ( 3 rounds ) 6 dismantling, fabrication, erection of top cone below save all of evaporators. 7 dismantling, fabrication, erection of complete save all ( existing design ) of evaporators including top plate, inner and outer shell. 8 dismantling, fabrication, erection of umbrella of save all evaporator 4th body as per existing design including all supporting. 9 dismantling, fabrication and erection of all quad condensate tank / syrup bottle including all connection. approx. size dia509mmxlength 1800mm 10 dismantling, fabrication, erection of stirrer ( fan ) of aeration tankat etp as per existing design including complete commissioning and trial 11 dismantling, fabrication, erection of hot water weighing tank of water weighing scale. dia 1.6 mtr x 1.5 height x cone 1 mtr length .the erection work for this job will also include all connections which are dismantled during dismantling. 12 dismantling, fabrication, erection of mix juice weighing tank of juice weighing scale. dia 2 mtr x 1.5 height x cone 1 mtr length .the erection work for this job will also include all connections which are dismantled during dismantling. 13 dismantling, fabrication & erection of juice feed boxes of juice heater double bead valve. the erection work for this job will also include all connections which are dismantled during dismantling. 14 dismantling, fabrication & erection of absorption tower of juice sulphiter. the erection work for this job will also include all connections which are dismantled during dismantling 15 dismantling, fabrication & erection of worn out stainer of mix juice tank / sulphited juice tank / syrup tank. 16 dismantling, fabrication and erection of the sulphur furnace with existing design ( by 20 mm ms plate ) this work include dismantling and erection of all connections, man hole, flanges etc of sulphur furnace. 17 dismantling, fabrication and erection of melter of sulphur furnace as per existing design. this work include dismantling and erection of all connections, man hole, flanges etc. 18 dismantling, fabrication and erection of scrubber of sulphur furnace as per existing design. this work include dismantling and erection of all connections, man hole, flanges etc . 19 dismantling, fabrication & erection of dorr coils ( nipple / flange / reducer rates as per general fabrication, erection rates ) 20 dismantling, fabrication and erection of mud tank below rvf including all connections. 21 dismantling, fabrication and erection of worn out heavy / light vacuum tank of rvf including all connections. 22 dismantling , fabrication and erection of worn out condensate pit along with partition plate of v.l.j.h / 4th body . 23 dismantling, fabrication & erection of filter juice sealing bottles of receiving pit for vacuum filter. the erection work for this job will also include all connections which are dismantled during dismantling. 24 dismantling fabrication and erection of filtrate juice receiving tanks for vacuum filter. the erection work for this job will also include all connections which are dismantled during dismantling. 25 dismantlingfabrication and erection of bagacillo pipeline from ms plate 3mm 26 dismantling, fabrication & erection of bagacillo cyclone. 27 dismantling, fabrication & erection of bagacillo chute. 28 dismantling, fabrication & erection of bottom trough of mud mixer for rvf. 29 dismantling, fabrication & erection of screw conveyor of mud mixer. 30 dismantling, fabrication and erection of ms vapour pipe of t sizes. dia 1050mm 31 dismantling, fabrication and erection of ms vapour pipe ofsizes. dia 900mm , 32 dismantling, fabrication and erection of ms vapour pipe ofsizes. dia 720mm 33 dismantling, fabrication and erection of ms vapour pipe ofsizes. dia – 620mm 34 dismantling, fabrication and erection of ms vapour pipe ofsizes. dia – 520mm 35 dismantling, fabrication and erection of ms vapour pipe ofsizes. dia – 420mm 36 dismantling, fabrication & erection vapour / exhaust pipe bend 900mm dia 37 dismantling, fabrication and erection of distance piece of ms vapour pipe length up to 1.5 mtr. dia 1050mm 38 dismantling, fabrication and erection of distance piece of ms vapour pipe length up to 1.5 mtr.dia 900mm , 39 dismantling, fabrication and erection of distance piece of ms vapour pipe length up to 1.5 mtr. dia 720mm 40 dismantling, fabrication and erection of distance piece of ms vapour pipe length up to 1.5 mtr. dia – 620mm 41 dismantling, fabrication and erection of distance piece of ms vapour pipe length up to 1.5 mtr. dia – 520mm 42 dismantling, fabrication and erection of distance piece of ms vapour pipe length up to 1.5 mtr. dia – 420mm 43 dismantling of ms / ci condenser cone of pans 44 fabrication of ms condenser cone ofpans 45 erection of ms / ci condenser cone of pans 46 dismantling, fabrication, erection of umbrellas of pan save all as per existing design including all supporting. 47 replacement of worn out portion of bottom, side plate & supporting angle / channel of syrup and molasses tank at pan station . 48 replacement of m.s plate gutter of crystallizer station and other factory units. 49 replacement of worn out portion ofpan soucer. 50 dismantling, fabrication and erection of downtake of pan from 10 / 12mm plate. 51 replacement of feed box of pans including all connections. 52 dismantling, fabrication and erection distributor of pans. 53 dismantling, fabrication & erection of worn out portion of molasses conditioner. this work includes dismantling and erection of all connection pipes and their drive unit. 54 dismantling, fabrication and erection of worn out bottom portion of crystallizer 55 dismantling, fabrication and erection of wornout portion of c vacuum crystallizer. 56 replacement of crystallizer arms along with supports from 75x75mm m.s angle.dismantling. 57 replacement of crystallizer arms along with supports from 75x75mm m.s angle. fabrication. 58 replacement of crystallizer arms along with supports from 75x75mm m.s angle.erection. 59 dismantling, fabrication & erection of cooling coils3” of crystallizer including all connections. 60 dismantling and erection of ms branch pipes of spray pond. this work includes all connections of clusters. 61 dismantling of ci / ms main pipeline spray pond 62 dismantling fabrication & erection of suction pipes of injection pumps with stainer. 63 dismantling fabrication & erection of suction pipes of spray pumps with stainer. 64 dismantling, fabrication erection of worn out bottom half portion of a / b magma mixture including allconnections. 65 dismantling, fabrication and erection of worn out bottom half portion of a pug mill including all connections. 66 dismantling, fabrication and erection of worn out a magma mixture complete including all connections. 67 dismantling, fabrication and erection of sugar melter pump stainer including all connections 68 fabrication and erection of bed for pump and motor of magma mixture along with suction and delivery pipe line connections, alignment of motor with pump etc. 69 dismantling, fabrication and erection of bottom discharge chute of continuous centrifugal machine 70 fabrication and erection of new syrup tank at pan station including all connections. 71 dismantling, fabrication and erection of ammonia coils of pans from ms pipedia 3”including all connection 72 dismantling and erection of tube plate ( top and bottom ) 2nd evaporator body including fabrication and erection of downtake including all connections. 73 dismantling and erection of complete calendria with tube plate ( top and bottom ) of 2nd evaporator body including all connections along with fabrication and erection of downtake 74 dismantling and erection of complete calendria with tube plate ( top and bottom ) of pan no. 5 including all connections along with fabrication and erection of downtake and dismantling & erection of distributor. 75 fabrication and erection of beds for pump and motor etc. 76 dismantling and erection of crystallizer shaft including arms and all connections, fittings. 77 dismantling, fabrication and erection cane cutter hoods from8 10mm thick plate with ms angles etc. 78 dismantling and erection of expansion joint of power turbine exhaust line. 79 replacement of side plates of cane carrier chain / rbc and trough of rbc / bagasse elevator / cross rbc. 80 replacement of channel and i beam of rbc / cane carrier / bagasse elevator / cross rbc runner 81 dismantling, fabrication erection of juice tray of mill no. 3 from ms plate 82 fabrication of screw conveyor of mill house 83 dismantling, fabrication of trough of screw conveyor ( mill house ) , assembly of screw conveyor with trough & its erection. 84 dismantling, fabrication erection of ash hopper of boiler ( pyjamas ) cone with chute bottom portion ( cone tapper portion size 15” approximate ) 85 repair of rotary bagasse feeders of boilersbody 86 repair of rotary bagasse feeders of boilersrotor 87 replacement of side plate 3mm / old ms plate of boiler ( with ms plate & supporting angle / flat ) 88 dismantling, fabrication & erection of worn out ducting of boiler & apcd including angle, channel, flats& flanges 89 dismantling, fabrication & erection damper of boiler ducting 90 dismantling fabrication & erection of expansion jointof boiler ducting ( 3.360 mtr x 1.260 mtr ) 91 replacement of ms gutter of apcd plant from wet scrubber to ash pits 92 dismantling fabrication & erection of damper of rotary bagasse feeder 93 dismantling, fabrication & erection of worn out portion of id and apcd fan casing 94 replacement of sieve plates of apcd scrubber. this job also includes 10 / 12mm holes ( 324 holes per square ft. ) drillingin plates 95 baffle plates ( ms flat 65 x 6mm ) of demister in wet scrubber 96 repair / replacement of wornout portion of wet scrubber of boiler no. 1 & 2 97 dismantling fabrication and erection of receiving tank / sum tank / sealing tank of wet scrubber. 98 replacement of g.i sheet gutter of factory building 99 replacement of worn out of m.s. runner of inter carrier, elevator, rbc , cross carrier & cane carrier chains 100 fabrication and erection of discharge bagasse chute between last mill and bagasse elevator 101 juice heater / v.l.j.h. ss tubesdismantling 102 juice heater / v.l.j.h. ss tubes fitting 103 semi kestner ss tubesdismantling 104 semi kestner ss tubesfitting 105 quad bodies ss tubesquad 1st to 4thdismantling 106 quad bodies ss tubesquad 1st to 4th fitting 107 pans ss / brass tubespan1st to 5th dismantling 108 pans ss / brass tubespan1st to 5th fittings 109 welding joints of water, juice, vapor and exhaust pipe line of exhaust pipe lines of all sizes. 110 ms pipe line 1 / 2 to 12” dia dismantling 111 ms pipe line 1 / 2 to 12” diaerection 112 ss pipe line 1 / 2 to 12” diadismantling 113 ss pipe line 1 / 2 to 12” dia erection 114 ci pipe line 1 / 2 to 12” diadismantling 115 ci pipe line 1 / 2 to 12” dia erection 116 ci pipe line above 12” dia dismantling 117 ci pipe line above 12” dia erection 118 ms pipe line above 12” dia from ms plate ( other than vapour pipe of pan and quad ) dismantling 119 ms pipe line above 12” dia from ms plate ( other than vapour pipe of pan and quad ) fabrication 120 ms pipe line above 12” dia from ms plate ( other than vapour pipe of pan and quad ) erection 121 ms bend upto 12” diadismantling 122 ms bend upto 12” diafabrication 123 ms bend upto 12” dia erection 124 ms bend above 12” dia from ms plate ( other than v.p. pans & quad ) dismantling 125 ms bend above 12” dia from ms plate ( other than v.p. pans & quad ) fabrication 126 ms bend above 12” dia from ms plate ( other than v.p. pans & quad ) erection 127 ci bends sizes 1” to 12”dismantling 128 ci bends sizes 1” to 12”erection 129 dismantling, fabrication& erection of m.s ( all sizes ) tee, 130 dismantling, fabrication& erection of m.s ( all sizes ) nipples, 131 dismantling, fabrication& erection of m.s ( all sizes ) crosses 132 dismantling, fabrication& erection of m.s ( all sizes ) reducers 133 dismantling, fabrication& erection of m.s ( all sizes ) elbow 134 dismantling, fabrication& erection of s.s ( all sizes ) tee, 135 dismantling, fabrication& erection of s.s ( all sizes ) nipples, 136 dismantling, fabrication& erection of s.s ( all sizes ) crosses 137 dismantling, fabrication& erection of s.s ( all sizes ) reducers 138 dismantling, fabrication& erection of s.s ( all sizes ) flange 139 dismantling, fabrication& erection of s.s ( all sizes ) elbow 140 dismantling, fabrication& erection of s.s ( all sizes ) bend 141 replacement of wornout ms cone ( all sizes ) 142 ms flanges ( all sizes ) dismantling 143 ms flanges ( all sizes ) fabrication 144 ms flanges ( all sizes ) erection 145 dismantling , fabrication and errection of man hole ( all sizes ) 146 a ) dismantling of platform. 147 b ) fabrication & erection of platform 148 m.s. tankhaving round & rectangular bottoms dismantling 149 m.s. tankhaving round & rectangular bottomsfabrication 150 m.s. tankhaving round & rectangular bottoms erection 151 m.s. tankhaving conical bottomsdismantling 152 m.s. tankhaving conical bottoms fabrication 153 m.s. tankhaving conical bottomserection 154 m.s structure trusses, perlins, columns & beams ( factory building ) dismantling 155 m.s structure trusses, perlins, columns & beams ( factory building ) fabrication 156 m.s structure trusses, perlins, columns & beams ( factory building ) erection 157 strengthening / replacement of l bracket / support between column and beam of factory building structure 158 platform railing from old pipe & angledismantling 159 platform railing from old pipe & angleerection 160 electric panel , db and other machinery shed gi / acc / ms sheet dismantling 161 electric panel , db and other machinery shed gi / acc / ms sheetfabrication 162 electric panel , db and other machinery shed gi / acc / ms sheeterection 163 patch work of any part of any equipment with 3mm to 10mm thick plate max. upto 1 sq meter 164 dismantling of sluice valve / angle valve / n.r.v. 165 erection of sluice valve / angle valve / n.r.v. , butterfly valve 166 replacement of rail line of caneunloaderwith 50mm square bar...

Department of Cooperation - Punjab

37753372 tender for fabrication and erection work 1 ( i ) sulphur furnace scrubber from m.s. plate from 10mm ( including all connections with pipe lines ) complete jobs d, f & e 2 ( ii ) replacement of cooling pipes of scrubber. 3 ( iii ) top cover of scrubber. 4 sulphur furnace melter / receiver from m.s. plate from 10mm ( including all connections with pipe lines ) a ) dismantling 5 b ) fabrication 6 c ) erection 7 juice heater outer shell from ms plate 10mma ) dismantling 8 b ) fabrication 9 c ) erection 10 i ) fabrication & erection of mud mixture shaft side plates with proper alignment 11 ii ) fabrication & erection of bottom curved portion of mud mixture with proper alignment 12 ( i ) clarifier inside compartment coil from m.s. pipe 5 with all nipple, flanges etc. complete job ( as where it is ) a ) dismantling 13 b ) fabrication 14 c ) erection 15 ( ii ) replacement of stirrers arms of clarifier 16 dismantling, fabrication & erection of distance piece of diameter 400mm. upto 1.5 meter length ( m.s. plate 8mm ) . 17 500 mm up to 1.5 meter length ( m.s. plate 8mm ) . 18 600 mm up to 1.5 meter length ( m.s. plate 8mm ) . 19 700 mm up to 1.5 meter length ( m.s. plate 8mm ) . 20 800 mm up to 1.5 meter length ( m.s. plate 8mm ) . 21 900 mm up to 1.5 meter length ( m.s. plate 8mm ) . 22 ( i ) dismantling, fabrication & erection of juice heater ( top & bottom ) compartment partition plate with rubber fitting channels from m.s / en 8 square bar & rubber strip fitting to make it leak proof ( to avoid short circuiting ) 23 ( ii ) replacementof compartments partition plates of juice heater. ( a ) top 24 ( b ) bottom 25 panbody shell from m.s plate 12mm a ) dismantling 26 b ) fabrication 27 c ) erection 28 top cone from m.s plate 12mma ) dismantling 29 b ) fabrication 30 c ) erection 31 umbrella from m.s plate 10mma ) dismantling 32 b ) fabrication 33 c ) erection 34 down take from m.s plate 12mma ) dismantling 35 b ) fabrication 36 c ) erection 37 save all of pans ( i ) complete jobs from m.s. plate 10mm and 8mm plate.a ) dismantling 38 b ) fabrication 39 c ) erection 40 ( ii ) outer shell ( d, f & e ) 41 ( iii ) inner portion ( d, f & e ) 42 ( iv ) top cover ( d, f & e ) with strengthening 43 ( a ) syrup / molasses tank from m.s plate 8mma ) dismantling 44 b ) fabrication 45 c ) erection 46 b ) patch work of syrup / molasses storage tanks of all pans. 47 replacement of worn out of m.s. runner of inter carrier, elevator, rbc, cross carrier & cane carrier chains. 48 replacement of rail line of cane unloader with 50mm square bar 49 molasses storage tank ( a ) replacement of worn out body shell of final molasses storage tank with m.s. plate 50 ( b ) patch work of molasses storage tanks. 51 dismantling, fabrication & erection of suction pipes of injection pumps 52 dismantling, fabrication & erection of cooling coils including connection pipe of crstallizers 53 replacement of worn out ducting of boiler & apcd including angle, channel, flats & flanges 54 replacement of side plates of cane carrier chain / rbc / cross elevator / baggasse elevator 55 replacement of trough rbc / trough cross elevator / trough bagasse elevator 56 mill house screw conveyor assembly ( complete with bearings ) a ) dismantling 57 b ) fabrication 58 c ) erection 59 mill house screw conveyor trough only 60 dismantling, fabrication & erection both top juice receiving tanks and bottom drain tanks of dsm screen 61 replacement of worn out portion of apcd includes casing / scrubber and flue gas entry connected to chimney portion etc. 62 cane cutter hood and chopper top platefrom 12mm thick m.s plate a ) dismantling 63 b ) fabrication 64 c ) erection 65 dismantling , fabrication & erection of worn out portion of chute cane carrier to 1st mill 66 dismantling , fabrication & erection of juice tray of mill no. 1 & 2 from m.s. plate8mm 67 10mm 68 dismantling , fabrication & erection of juice tray of mill no. 1 & 2 from s.s. plate6mm 69 8mm 70 repair of rotary baggase feeders of boilers a ) body 71 b ) rotor 72 replacement of casing of boiler ( both plate & supporting angle ) 73 ( a ) replacement of magma mixture body including driving units in all aspects ( complete job ) .a magma 74 b magma 75 ( b ) shell of a, b & c magma mixers. 76 replacement of worn out portion of crystallizer body 77 repair and fitting of bush to crystallizers central shaft 78 replacement of worn out condensate receiving bottles 79 replacement of worn out down take of quad 80 dismantling, fabrication & erection of dorrs scrapper ( complete job ) . 81 i.d fan worn out casting of both boilers a ) dismantling 82 b ) fabrication 83 c ) erection 84 replacement of the expansion joints of boilers 85 replacement of worn out ducting the boilers 86 erection and fabrication of any thing from scrap 87 replacement of ( i ) s.s ventury of condensor 88 ( b ) cone of condensor from s.s plate 89 replacement of tail pipe of pan 90 replacement of inter carrier side plates 91 replacement of scrapper bar side plates size : 1 meter square 92 replacement of the casing of air heater 93 replacement of condenser jet box 94 replacement of the bottom curved portion of pug mill ( centrifugal machine ) 95 replacement of the outer shell of the clarifier 96 replacement of the worn out portion of cane carrier 97 d.f. & e. of shaft & string pedals of ( i ) a massecuite pugmill 98 ( ii ) b massecuite pugmill 99 a ) conversion of b& c double cured crystallizers as a vacuum crystallizer with complete shell fabrication, erection alongwith drives and commissiong of the crystallizer with satisfactory trials. 100 a ) replacement of broken arms of dry seed cryst. 101 a ) replacement of dropping massecuite gutter of a , b & c of pans 102 b ) replacement of massecuite gutter of crystallizers 103 ( part b ) ( general ) pipe line m.s 1 to 12 diaa ) dismantling 104 b ) erection 105 pipe line m.s above 12 dia upto 32. ( other than vapour pipe of pan and quada ) dismantling 106 b ) fabrication 107 c ) erection 108 pipe line s.s 1 to 12 diaa ) dismantling 109 b ) erection 110 pipe line c.i. 1 to 12 diaa ) dismantling 111 b ) erection 112 steam pipe line 1 to 12 diaa ) dismantling 113 b ) erection 114 steam pipe line bendsa ) dismantling 115 b ) erection 116 a ) bend m.s upto 12 diaa ) dismantling 117 b ) fabrication 118 c ) erection 119 b ) bend m.s. above 12 dia up to 32 dia 120 welding joints of water, juice, vapour and exhaust pipe line of all sizes 121 man hole of all sizes a ) dismantling 122 b ) fabrication 123 c ) erection 124 flangesa ) dismantling 125 b ) fabrication 126 c ) erection 127 tee / nipple / cross / reducers ( m.s ) a ) dismantling 128 b ) fabrication 129 c ) erection 130 dismantling, fabrication and erection of a ) m.s coil 131 b ) m.s steam coil 132 platforma ) dismantling 133 b ) fabrication 134 c ) erection 135 m.s structure work ( factory building ) a ) dismantling 136 b ) fabrication 137 c ) erection 138 d, f & e of m.s. tank having round, concial & rectangular bottoms ( other than ms tank of syrup and molasses ) ( i ) syrup extraction bottles of pumps. 139 ( ii ) catchers of juice pumps. 140 ( iii ) molasses run off tanks of machies. 141 trusses, perlins, columns & beams ( factory building ) a ) dismantling 142 b ) fabrication 143 c ) erection 144 platform pipe line & railing of all sizesa ) dismantling 145 b ) erection 146 electric panel, db and other machinery shed gi / acc / ms sheet a ) dismantling 147 b ) fabrication & erection 148 dismantling, fabrication and erection of pump and motor bed a ) below 15 h.p. motor 149 b ) above 15 h.p motor 150 valves: sluice / angle / n.r.v / butterfly type a ) dismantling 151 b ) erection 152 vapour / exhaust pipe line of quad and pan from m.s. plate ( 8mm ) a ) dismantling 153 b ) fabrication 154 c ) erection 155 cone from m.s plate ( 10mm ) upto 1.5 meter mean dia.a ) dismantling 156 b ) fabrication 157 c ) erection 158 gutter from m.s. plate 5mm of centrifugal machine.a ) dismantling 159 b ) fabrication 160 c ) erection 161 sight glass a ) replacement 162 crystallizer slide gatea ) dismantling 163 b ) fabrication 164 c ) erection 165 vapour pipe bend of quad & pana ) dismantling 166 b ) fabrication 167 c ) erection 168 a ) patch work of b.h equipments...

Department of Cooperation - Punjab

37607900 fabrication and erection jobs of gurdaspur csm 1 repair of cane unloader grab arms 2 replacement of sq. bar of cane unloader. 3 repair, strenghening and alingment of bridge span of unloader no. 1 scope of work : 1.dismantling of bridge span from position and taken it on ground level.2.strengthing and alignment of bridge span including replacement of ms channel, angles and square bar. 3. erection of bridge span on position in all respect with trial. 4 dismantling, fabrication and erection ofa) mincer hood 5 b) cutter hood 6 c) chopper hood 7 to build mill top rollers square end as per standard size 8 to build mill rollers crown pinion teeth as per standard template of teeth. 9 to build mill rollers coupling square section as per standard size 10 to build mill rollers journal as per standard size 11 to build millunder feeder rollers drive gear teeth as per standard template of teeth 12 fabrication and erection of mill rollers crown pinion guard 13 fabrication and erection of donnelly chute of mills 14 dismantling, fabrication and erection of worn out juice tray at mill house from 10/12 mm plate 15 dis. feb. & erection ofmill house screw conveyor 16 dis. feb. & erection of mill house screw conveyor trough along with dismantling and fitting of conveyor and drive system. 17 dismantling and erection of worn out runners of cane carrier, rbc, bagasse elevator and inter carrier. 18 dismantling, fabrication and erection of worn out side plates of cane carrier, rbc, bagasse elevator and inter carrier. 19 dismantling, fabrication and erection of worn out trough of rbc, bagasse elevator & rack carriers froma) ms plate6/8 mm 20 b)ss plate 4/5 mm 21 dismantlingfabrication and erectionstructure of cane carrier drive ,rbc chain drive, rakecarrier and elevator chain drive 22 replacement of worn out bottom boot of secondary chain 23 replacement of angle and channel of cane carrier / rbc / rack carrier & elevator . 24 repair of secondarycane carrier chain and elevator chain rake 25 fabrication of secondarycane carrier chain and elevator chain rake 26 fabrication of rbc slates 27 repair of rbc slates 28 dis. and erection of bagassecillow blower 29 fabrication of bagassecillow blower 30 dismantling and erection of boiler bagasse feeding ci furnace mouth piece of wil make boiler. 31 dismantling and erection of boiler bagasse feeding ci furnace chute 32 replacement of furnace door frame of wil make boiler & texmaco make boiler 33 replacement of furnace doorof wil make boiler & texmaco make boiler 34 repair and fitting of furnace door frame of wil make boiler & texmaco make boiler 35 repair and fitting of furnace doorof wil make boiler & texmaco make boiler 36 replacement of furnace chamber door frame of wil make boiler & texmaco make boiler 37 replacement of furnace chamber door of wil make boiler & texmaco make boiler 38 repair and fitting of furnace chamber doorof wil make boiler& texmaco make boiler 39 repair and fitting of furnace chamber door frameof wil make boiler& texmaco make boiler 40 dismatling of boiler dampers 41 fabrication of boiler dampers 42 erection of boiler dampers 43 repair of boiler dampers 44 repair ofid fanofwil and texmaco make boiler 45 repair offd fanofwil and texmaco make boiler 46 dismantling, fabrication and erection of boiler bagasse feeding ms chute between boiler furnance and rbc chain 47 patch work 48 dis, feb, & errection of boiler flue gas ducting between fd fan, id fan& chimney. 49 dismantling, fabrication & erection of bend of boiler flue gas ducting between id fan and chimney from 6/8mm thick plate. 50 dismantling, fabrication & erection of side plate & top plates(4mm) of boilers. 51 dismantling, fabrication & erection economiser top & side plates 52 dismantling, fabrication & erection air heatertop & side plates 53 dismantling and fitting of gi/acc sheet. a) dismantling 54 b)fitting 55 dismantling of machinery structure. 56 fabrication and erection of machinery structure. 57 dismantling & erection of fd fan casing 58 fabrication of fd fan casing 59 repair of fd fan casing 60 dismantling & erection of id fan casing 61 fabrication of id fan casing 62 repair of id fan casing 63 dismantling, fabrication & erection(a)pump and motor bed 64 b) motor and radicon 65 c) cutter motor bed 66 dismantling fabrication and erection ofwet scrubber cone 67 dismantling fabrication and erection ofwet scrubber side plates 68 dismantling fabrication and erection ofclarifier cone of boiler 69 dismantling fabrication and erection ofman hole 70 dismantling fabrication and erection ofman hole blind 71 dismantling of sieve plate of boiler no. 3 wet scrubber 72 fabrication of sieve plate of boiler no. 3 wet scrubber 73 drilling of sieve plate of boiler no. 3 wet scrubber 74 erection of sieve plate of boiler no. 3 wet scrubber 75 fabrications mill roller bearing cover 76 dismantling of structure 77 fabrication of structure 78 erection of structure 79 dismantling of platform plates 80 fabrication of platform plates 81 erection of platform plates 82 dismantlingofrailing 83 fabrication & erection of railing 84 fabrication and erection of ms stairs with railing 85 mill pinion guard (bottom ) 86 open gear guard (bottom) of all chain 87 fabrication ofmotor protection cover 88 fabrication of shed (any size) with structure 89 repair of dsm screen 90 dismantling and erection of dsm screen 91 dismantling of m.s. round/squaretanks 92 fabrication of m.s. round square tanks 93 erection of m s round /square tanks 94 dismantling of m.s./g.i./ c.i./ ss / rmp pipe from 1” to 12” dia 95 erection of ms/gi/ci/ss/ rmp pipe 1” to 12” dia 96 fabrication of m s / ss pipe line above 12” dia from m.s. / ssplate 97 dismantling of m.s. / ss/c.i. pipe line above12” dia 98 erection of m.s./ c.ipipe line above 12” dia 99 a)dismantling of nipple 1” to 12” dia up to 24” length 100 b)fabrication of nipple 1” to 12” ø & up to 24” length 101 c)erection of nipple 1” to 12”dia & up to24” length 102 a)dismantling of nipple above 12” dia up to 1 mtr. length 103 b)fabrication of nipple above 12” dia up to 1 mtr. length 104 c)erection of nipple above 12” dia up to 1 mtr. length 105 a) dismantling of bend 1” to 12” dia 106 b) fabrication of bend 1” to 12” dia 107 c) erection of bend 1” to 12” dia 108 dismantling ,fabrication & erection of bend above 12” below 36” dia 109 dismantling of reducer/tee1” to 12” dia & up to 24” length 110 a) dismantling of blind 1” to 12” dia 111 b) fabrication of blind 1” to 12” dia 112 c) erection of blind 1” to 12” dia 113 a) dismantling of blind above12” dia 114 b) fabrication of blind above 12”dia 115 c) erection of blind above 12” dia 116 a) dismantling of valve 1” to 12” dia 117 b) erection of valves 1” to 12” dia 118 c) dismantling of valve above 12” dia 119 d) erection of valvesabove 12” dia 120 a)dismantling of flange 1” to 12” dia 121 b) fabrication of flange 1” to 12” dia 122 c) erection of flange above 12” dia 123 cutting & washing of old flanged 1 and above 124 dismantling of structure/platform 125 fabrication & erection of structure/platform 126 dismantling of railing 127 fabrication & erection of railing 128 dismantling, fabrication & fitting of jet box in m.s. material 129 dismantling, fabrication, fitting of jet box in s smaterial 130 dismantling, fabrication & fitting of nipples 8” to 10” dia for jet box of condenser 131 a) fabrication of vapour pipe bend 36” to 40” dia 132 b) dismantling & erection of vapour pipe bend 36” to 40” dia 133 dismantling, fabrication and erection of suction strainer of spray pump/injection pump. 134 dismantling, fabrication & erection of manhole with neck flange cover 16” to 24” dia 135 cutting & strengthing of old material 136 dismantling, fabrication & erection of worn out feeding header of pans 137 hoppers a) dismantling, fabrication & erection of deck piece & alignments of hopper 138 b) dismantling, fabrication & erection of hopper piece from deck piece to end of hopper 139 c) dismantling, fabrication & erection of hopper piece from deck piece to start of hopper including multi trays. 140 d) dismantling, fabrication & erection of hopper complete with deck piece and multi tray for hot/cold air blower. 141 replacement of c.i. cone (venture)of multijet condenser 142 dismantling, fabrication & erection of central tube with cooling coil (shaft) for water cooled crystallizer 40 tons 143 a) dismantling, fabrication & erection of cooling pipe coil in the crystallizermadefrom 4” dia pipe 144 b) patch work of crystallizer cooling shaft 145 dismantling, fabrication & erection of mud scroll/ screw conveyor 146 dismantling, fabrication & erection ofbagacillocyclone 147 coils fabricationof coil 148 dismantling & erection of coils 149 dismantling of existing condenser including their venture, tail pipe, bend etc. and thereafterinstallation ofefficient single entry new condensers including fabrication / erection of venture, tail pipe & bends etc. fabrication and erection of base frame and other associated fabrication & erection jobs. 150 dismantling, fabrication & erection of m.s.gutters. 151 fabrication of flange from m.s plate 152 dismantling of stone catcher strainers. 153 fabrication of stone catcher strainers from perforrated sheet 154 erection of stone catcher strainer 155 dismantling, fabrication & erection of molasses conditioner strirrer 156 dismantling of old transient heater & erection transient heater 157 a) dismantling of vapour pipe 900 mm/ 1000 mm dia 158 b) fabrication of vapour pipe 900/1000 mm dia 159 c) erection of vapour pipe 900/1000 mm dia 160 dismantling, fabrication & erection of save all from 10 mm to 12mm platea) pan 161 b) quad& vapour cell 162 dismantling, fabrication & erection of save all from 8mm to 10mm ms plate excluding outer shell 163 replacement of j pipe in vapour cell/ quad body/ pan 164 dismantling, fabrication & erection of umbrellaa) pan 165 b) quad& vapour cell 166 dismantling, fabrication & erection of bottom and top cone a) pan 167 b) quad & vapour cell 168 c) juice sulphiter / syrupsulphiterand cone of any other units above 12” dia 169 a) replacement of cooling jacket for the sulphur burning chamber. 170 b) replacementof sulphur furnace coolingscrubber complete withinternal8” cooling jacket, 6” gas pipe and 4” cooling pipe 171 c) dismantling, fabrication & erection of cooler made from 8” dia pipe for sulphur furnace 172 dismantling, fabrication & erection of sulphur burning chamber of sulphur furnace 173 dismantling, fabrication & erection of sulphur melt tank 174 dismantling, fabrication & erection of coil for sulphur melter 175 dismantling, fabrication & erection of condenser of vacuum filter 176 dismantling, fabrication & erection of vacuum filtera) mud trough 177 b) abgitator 178 replacement of vacuum filter drum complete including connected accessories 179 dismantling, fabrication & erection ofroof for final molasses tank 180 dismantling, fabrication & erection ofshell for final molasses tank 181 dismantling, fabrication & erection ofdsm screen complete. 182 dismantling, fabrication & erection ofinter connecting square box for juice heater double beat valve. 183 dismantling, fabrication & erection ofdischarge chute of batch type c/f machine. 184 dismantling, fabrication & erection of rectangular coil of molasses tank. 185 dismantling, fabrication & erection of de super heater coils. 186 dismantlingof angle valvesa)size 450 mm to 700 mm 187 size 700 mm to 1000 mm 188 erectionof angle valves /straight valve a)size 450 mm to 700 mm 189 size 700 mm to 1000 mm 190 patch work at boiling house and c/f house etc. 191 fabrication & erection of mud boots for dorr. 192 a. replacement of clarifiercenter tube 193 b. replacement of ms scrapper arms of clarifier center tubes. 194 c. replacement of clarifier juice distribution plates 195 a) replacement of clarifier bottom plate(compartment) 196 b) dismantling,fabrication & erection of clarifier 197 dismantling of coils in dorr/melter/centrifugal machines/steam coils etc. 198 fabrication of coils in dorr/melter/centrifugal machines/steam coils etc. 199 erection of coils in dorr/melter/centrifugal machines/steam coils etc. 200 dismantling, fabrication and erection of semi kestner bottom nipple 24” dia 201 replacement of quad / vapour cell down take 202 replacement of pan down take 203 patch work of worn our portion of pan / evaporatorbody shell 204 patch work of save all of pan / evaporator bodies 205 patch work of umbrella of pan/ evaporator bodies 206 strengthing of umbrella of pan / evaporator bodies 207 dismantling, fabrication & erection of body shell a) juice sulphitor 208 b) evaporator bodies 209 c) pans 210 dismantling, fabrication & erection of bottom/top taper portion ofa)pans 211 b) evaporator bodies 212 dismantling of ss tubes of a) pans 213 b) evaporator bodies 214 c) juice heater 215 fitting of ss tubes and to be tested at80 psi hyd. pressure a) pans 216 b) evaporator bodies 217 c) juice heater 218 a) dismantling of s.s tube of semi kestner 219 b) fitting of s.s tubes of semi kestner and to be tested 80 psi hyd. pressure 220 dismantling c/f machine including water, steam connection and discharge chute 221 erection c/f machine including water, steam connection and discharge chute includeing modification of staging/structure 222 dismantling and erection of sugar grader of side plate including modification of structure. 223 dismantling, fabrication and erection of circular bottom portion of magma mixer. 224 dismantling, fabrication and erection of shaft with arms of dry seed crystallizer / vacuum crystallizer. 225 dismantling, fabrication and erection of agitator arms of juice sulphitor/dry seed crystallizer / vacuum crystallizer. 226 replacement of ribbon type stirrer of air cooled crystallizer. 227 crystallizer central shaft with ribbon:a) dismantling 228 b) fabrication 229 c) erection 230 dismantling, fabrication and erection of condensate bottle big size(from 1.5mtr to 2.0mtr) 231 dismantling, fabrication and erection of condensate bottle big size(from 1.0mtr to 1.5mtr) 232 fabrication & erection of complete casing having outer dia for circular portion 32 approx as existing exhaust blower of batch type centrifugal machines 233 magma mixera) dismantling of magma mixer including shaft / arms / drive etc. 234 b) fabrication of magma mixer including shaft / arms / drive etc. 235 c) erection of magma mixer including shaft / arms / drive etc. 236 dismantling’ fabrication & erection of molasses gutter for centrifugal machines 237 dismantling and erection of existing syrup/ molasses/ magma pipe lines for their internal/external cleaning. 238 fabrication of bucket for sugar elevator / dry seed elevator 239 s.s bend/tee/reducer/nipple/crossa) dismantling 240 b)fabrication 241 c)erection 242 dismantling, fabrication and erection of segment of pan shell 243 dismantling, fabrication and erection of complete pan shell including sight glass, man hole, provision of key sample, vacuum gauge, ammonia pipes, glass washing pipe, cold water lineconnections and other accessories connectedto body shell, umbrella including welding of m.s. angles for supports etc., top taper cone including connections of washing steam pipes etc., save all including j pipes etc, vapour pipe outletnipple of save all, feed pipe connections etc. 244 fabrication & erection of foundation beds of pumps & motors/gear box & motors:a) weighed juice/sulphited juice/clear juice/high flow pump or other similar pump. 245 b) condensate pump/hot water pump/filtrate pump/mud pumps/vacuum pumps, juice, magma, molasses pumps and other similar pumps. 246 crystallizer gear box and motors 247 worm and worm wheel, gland housing of crystallizers: a)dismantling and erection of existing worm and worm wheel, gear box, motor and alignment work of worm and worm wheel, gear box and motor for satisfactory trial. 248 b) dismantling and erection of gland housing of crystallizer shaft. 249 for spray pond one sidea) fabrication of ss pipe line up to 12” dia from 4 mm thick ss plate 250 b) fabrication of ss cluster for fitting 2” sized pipes with nozzles ( as fitted in existing clusters) . 251 c) threading in 2” dia ss pipe line for fitting nozzles 252 vacuum crystallizer / dry seed crystallizer (i) dismantling, fabrication & erection of complete shell ( including side plates ) along with dismantling, erection & alignment of complete drive system 253 dismantling, fabrication & erection of complete shell ( excluding vertical side plates ) 254 1. lime hopper: dismantling 255 fabrication 256 erection alongwith connecting valves & pipes etc. 257 lifting of lime slacker along with connecting parts upto 2 ft height suitable for fitting lime hopper. 258 part b cutting and welding of boiler tubes for cleaning 259 cutting and welding ofheader capsfor cleaningof boiler tubes 260 seamless pipe ½’’to 8’’od & above(various lengths)a) dismantling 261 b) fabrication 262 c) erection 263 seamless pipe nippleup to8’’od& above a) dismantling 264 b) fabrication 265 c) erection 266 seamless pipe bendsup to8’’od& above a) dismantling 267 b) fabrication 268 c) erection 269 dismantling, and erection of air heater tubes 63.5 mm od x 8 feet length 270 dismantling, and erection of air heater tubes 63.5 mm od x 16 feet length 271 cutting,welding and fitting ofair heaterold tubes 272 dismantling ,fabrication and erection ofair heatercentre tube plate 273 dismantling ,fabrication, drilling and erection ofair heatertop and bottom tube plate 274 ibr valveup to36’’od a) dismantling 275 b) erection 276 ibr flange a) dismantling 277 b) fabrication 278 c) erection 279 ibr teea) dismantling 280 b) fabrication 281 c) erection 282 reducera) dismantling 283 b) fabrication 284 c) erection 285 boiler drum partition platesa) dismantling 286 b) fabrication 287 c) erection 288 d) repair 289 boiler drum water seprator a) dismantling 290 b) fabrication 291 c) erection 292 d) repair 293 boiler wet scrubber seive plate as per drawinga) dismantling 294 b) fabrication 295 c) drilliing 296 d) erection 297 ibr welding joint ...

Department of Cooperation - Punjab

37571833 tender for dismantling fabrication erection jobs 2 dismantling of ms pipe line with flanges, nipple, bend, reducers etc. ( for cleaningpurpose ) upto 12” 3 erection of ms pipe line with flanges, nipple, bend, reducers etc. ( for cleaningpurpose ) upto 12” 4 dismantling of ms pipe line upto 12” 5 erection of ms pipe line upto 12” 6 dismantling ms pipe line above 12” 7 fabrication & erection of ms pipe line above 12” 8 dismantling of ms bend, tee, nipple, reducers, flanges, blinds etc. 9 fabrication & erection of ms bend, tee, nipple, reducers, flanges, blinds etc. 10 dismantling ss pipe line upto 12” 11 erection of ss pipe line upto 12” 12 dismantling ss pipe line above 12” 13 erection of ss pipe line above 12” 14 dismantling of ss bend, tee, nipple, reducers, flanges, blinds upto 12” 15 fabrication & erection of ss bend, tee, nipple, reducers, flanges, blinds upto 12” 16 dismantling of ss bend, tee, nipple, reducers, flanges, blinds avobe 12” 17 fabrication & erection of ss bend, tee, nipple, reducers, flanges, blinds above 12” 18 dismantling of valves upto 12” 19 erection of valves upto 12” 20 dismantling of valves above 12” 21 erection of valves above 12” 22 dismantling of ms pipe leading to condenser of pan / quad 23 fabrication & erection of ms pipe leading to condenser of pan / quad 24 dismantling of ms bend leading to condenser of pan / quad a ) full bend 25 dismantling of ms bend leading to condenser of pan / quad. b ) half bend 26 fabrication & erection of ms bend leading to condenser of pan / qud a ) full bend 27 fabrication & erection of ms bend leading to condenser of pan / quad b ) half bend 28 dismantling of ms plateform. 29 fabrication & erection of ms plateform. 30 dismantling of manhole of all sizes including nipple, flanges, blinds etc. 31 fabrication & erection of manhole of all sizes including nipple, flanges, blinds etc. 32 all welding works / joints ( ms ) 33 all welding works / joints ( ss ) 34 replacement of ss / brass tubes of evaporators, juice heater, semikestner, vapour cell, pan during season and off season. 35 plugging of ss / brass tubes of evaporators, juice heater, semikestner, vapour cell, pan during season and off season. 36 dismantling, fabrication and erection of ss rubber seated valve of all sizes 37 dismantling, fabrication and erection of ms rubber seated valve of all sizes 38 fabrication and erection of liquidation tray for both mud line of dorr and its outlet pipe to be put into mud receiving tank of rvf. 39 dismantling, fabrication and erection of scroll of rvf mud mixture. 40 dismantling, fabrication and erection of mud tray of rvf. 41 dismantling, fabrication and erection of agitator of rvf. 42 dismantling, fabrication and erection of bagacillo cyclone. 43 dismantling, fabrication and erection of juice coil of dorr. 44 dismantling, fabrication and erection of grit catcher of pumps. 45 dismantling, fabrication and erection of strainer of pumps. 46 dismantling of juice / syrup / lime receiving tank ( cylindrical or square ) 47 fabrication and erection of juice / syrup / lime receiving tank ( cylindrical or square ) 48 dismantling, fabrication and erection of bottom of juice / syrup / lime receiving tank ( cylindrical or square ) . 49 dismantling and erection of double beat valve 50 dismantling, fabrication and erection of juice sulphited spurzer. 51 dismantling , fabrication and erection of bagacillo pipe line 52 dismantling, fabrication and erection of juice sulphiter tower. 53 dismantling of juice sulphiter 54 fabrication and erection of juice sulphiter complete in all respect 55 dismantling , fabrication and erection of vapour vent coil of juice heater / semikestner / vapour cell / evaporator / pan etc. 56 replacement of complete wornout ms partition plate including ms strips of juice heater. a ) top portion 57 replacement of complete wornout ms partition plate including ms strips of juice heater.b ) bottom portion 58 repair of complete wornout ms partition plate including ms strips of juice heater. a ) top portion 59 repair of complete wornout ms partition plate including ms strips of juice heater.b ) bottom portion 60 replacement of complete wornout ms square bar or ms strip of juice heater. a ) top portion 61 replacement of complete wornout ms square bar or ms strip of juice heater. b ) bottom portion 62 repair of complete wornout ms square bar or ms strip of juice heater.a ) top portion 63 repair of complete wornout ms square bar or ms strip of juice heater.b ) bottom portion 64 dismantling, fabrication and erection of primary cooler of sulphur furnace including water coil. 65 dismantling, fabrication and erection of secondary cooler of sulphur furnace including water coil. 66 dismantling of ms gutter ( round or square ) 67 fabrication and erection of ms gutter ( round or square ) 68 dismantling, fabrication and erection of save all of quad body. 69 dismantling of shell of quad body . 70 fabrication and erection of shell of quad body. 71 dismantling, fabrication and erection of sight glass of quad / pan 72 dismantling of old semikestner ( 450 sqr. mtr. ) 73 dismantling ofold damaged condensate storage tank ( round ) 74 strengthening of vapour pipe of pan / quad. 75 dismantling, fabrication and erection of ss nozzle box of condenser. 76 repair of vapour / exhaust valves of pan / quad / juice heater etc. above 12” 77 dismantling of shell of pan. 78 fabrication and erection of shell of pan 79 dismantling, fabrication and erection of top cone of pan complete 80 dismantling, fabrication and erection of bottom cone of pan complete 81 dismantling, fabrication and erection of venturey of condenser. 82 dismantling, fabrication and erection of umbrella of pan 83 replacement of wornout baffles plate of pan. 84 dismantling, fabrication and erection of feeding header of pan. 85 dismantling and erection of pan condenser complete. 86 dismantling of syrup / molasses storage tank at pan. 87 fabrication and erection of syrup / molasses storage tank at pan. 88 dismantling of worrn / worm wheel of crystallizer and fitting of planetary gear box with motor. 89 dismantling, fabrication and erection of damaged arms / scroll of crystallizer. 90 dismantling, fabrication and erection of central shaft of horizontal crystallizer. 91 dismantling, fabrication and erection of plain ms plate hoper. 92 dismantling, fabrication and erection of drive portion of ms hopper ( approximate 2 mtr. ) 93 dismantling, fabrication and erection of tray pieces of ms hoper. 94 dismantling of hot air blower and erection of new electrical type hot air blower including inlet air ducting in both nearby hoppers. 95 replacement of wornout bottom round portion of horizontal crystallizer. 96 fabrication and erection of shed for electric motor, panel boards and any other machinery 97 straightening of ms old plate to be used as platform. 98 dismantling, fabrication and erection of all wornout beam, channel, angle etc. 99 cutting of ss / brass tubes 100 dismantling and erection of air compressor with motor and bed frame. 101 fabrication and erection of bed frame for motor and pump 102 dismantling and erection of various sizes pumps and motors. 103 repair of ms fabricated valves having sizes 14” & above complete in all respect such as internal / external body, seat plate, ring, spindle etc. 104 repair of donally chute i.e. replacement of wornout plate. 105 dismantling and refitting of 02 nos. nk1100 continues cfg. machine at its existing position after strengthening of base girder, channels, angles etc. also to replace rubber pads, repair of bottom portion of machine etc. and master level position to be done to avoid any wobbling with satisfactory trial. 106 a suitable structure of ms beam, channel etc. to be made to remove basket of wil 1501 continue cfg. machine. 107 fabrication of inter & secondary carrier racks. 108 replacement of bottom of maceration water tank. 109 replacement of bottom cone of round and square tank of mill house. 110 replacement of wornout side plates of all carriers. 111 dismantling, fabrication and erection of hood chopper / leveller / fibrizer. 112 dismantling, fabrication and erection of wornout bottom boot of inter rack carrier 113 dismantling, fabrication and erection of side boxes of secondary / inter rack carrier and rbc. 114 replacement of wornout rbc / secondary cane carrier andinter carrier trough. 115 dismantling, fabrication and erection of radius portion of bagasse elevation chain / rbc chain complete. 116 dismantling and erectionflat of runner of all carriers. 117 replacement of m.s. plate of donga. 118 fabrication of resistance box with blade....

Department of Cooperation - Punjab

32750211 supply of cooling coils cooling coils , supply of cooling coil season 2022 23 , supply of cooling coil of c vertical crystallizer. as per drawing. dia of coil is 2½ c class ms pipe jindal / tata make, length of one coil is 73 mtr. to be tested at 50 lbs / sq inch....

Ajnala Cooperative Sugar Mills Limited - Punjab

32749475 purchase of 1) dc panel spares. 2) instrument spares. 3) cs coupling 4) various type of purchase items & contract jobs. 5) machinery spares. 6) single entry ss condenser (ape make) 07) ibr boiler tubes. 08) pump & pump spares. 09) cooling coil for vertical crystallizer. 10) erection work for cooling coils. 11) tarfelting work for sugar godown. 12) tarfelting material. 13) ibr boiler contract jobs....

Ajnala Cooperative Sugar Mills Limited - Punjab

32507212 tender for purchase of dc panel spares, instrument spares, coupling, cs coupling, various type of purchase items and contract jobs, machinery spares, electrical goods and spares, vfd panel and spares, fd fan with shaft, plc for 4 speed c/f motor, cs crown pinion, tail bar for coupling, domite tips for knives and hammers zupper machine, replacement of acc/cgs /cc sheet, building materials, insulation works with materials, couling coil for vertical crystallizer....

Department of Cooperation - Punjab

32325753 fabrication and erection jobs of morinda csm 2 replacement of worn out of m.s. runner of pcc, scc, icc, elevator, rbc and cross carrier chains 3 replacement of s.s. tubes of all juice heaters, vapour line juice heater and semi kestner. 4 do but the number of tubes below 50 no. 5 do but all pans during off season 6 do but evaporators during off season 7 do – but in case of entire body of evaporator 8 welding joints of water, juice, vapour and exhaust pipe lines of all sizes. 9 pipe line upto 12” diaa ) dismantling 10 b ) erection 11 pipe line above 12”diafrom ms platea ) dismantling 12 b ) fabrication 13 c ) erection 14 bends from readymade pipe line up to 12 dia a ) dismantling 15 b ) fabrication 16 c ) erection 17 bends above 12” dia from ms platea ) dismantling 18 b ) fabrication 19 c ) erection 20 tee, nipples & crosses upto 12” dia a ) dismantling 21 b ) fabrication 22 c ) erection 23 tee, nipples & crosses above 12” dia from m.s platea ) dismantling 24 b ) fabrication 25 c ) erection 26 reducers of all sizes, a ) dismantling 27 b ) fabrication 28 c ) erection 29 flanges of all sizes, a ) dismantling 30 b ) fabrication 31 c ) erection 32 valves:a ) dismantling 33 b ) fabrication 34 c ) erection 35 man holes ofall sizesa ) dismantling 36 b ) fabrication 37 c ) erection 38 platform:a ) dismantling 39 b ) fabrication 40 c ) erection 41 m.s. structure worklighta ) dismantling 42 b ) fabrication 43 c ) erection 44 m.s. structure work heavya ) dismantling 45 b ) fabrication 46 c ) erection 47 m.s. tank completehaving round & conical & rectangular bottomsa ) dismantling 48 b ) fabrication 49 c ) erection 50 m.s rubber seated valves of any typesa ) dismantling 51 b ) fabrication 52 c ) erection 53 nrv of any type:a ) dismantling 54 b ) fabrication 55 c ) erection 56 platform pipe line railing of all sizesa ) dismantling 57 b ) erection 58 fabrication of s.s rubber seated valves and nrv of all sizes 59 m.s. patch work 60 fabrication and erection m.s. stair; a ) monkey tower type 61 b ) step type 62 repair of rubber seated valves above 12 dia 63 repair of nrv valves above 12 dia 64 straighteningm.s plate 65 strengthening of any structure with m.s angle / channel 66 s.s. to s.s. welding 67 fabrication and erection of all type of pump + motor bed. 68 repair of cane un loader grab arms 69 drilling and tapping of mill’s top roller of square end face having size 8 20m at 265 pcd and 50mm deep thread for fitting of ropeless coupling. 70 repair and overhauling of cane unloaders except hydraulic grab. 71 replacement of cane cutting knives of chopper 72 replacement of cane cutting knives of swing type cutter 73 replacement of fibrizer hammers with tip 74 do but only domite tips 75 dismantling, fabrication & erection ofmills juice tray ( m.s. plate ) 76 fabrication of scc and inter carrier chain’s rake. 77 repair of secondary cane carrier & inter carrier chain’s rake. 78 hard facing of trpf rollers 79 to build mills top rollers square end as per standard size 80 to build mills roller crown pinion teeth as per standard template of teeth. 81 do but mill roller coupling square section as per standard size 82 fabrication oftrpf juice tray 83 fabrication oftrpf top roller cover 84 dismantling, fabrication and erection of donnelly chute of mills 85 to build up the trpf roller journal as per standard size. 86 to build up the mill roller journal as per standard size. 87 fabrication and erection of mill roller crown pinion guard 88 fabrication and erection of trpf roller crown pinion guard 89 complete repair of trpf pressure chute, including replacement of worn out s.s. plate 90 fabrication of mill top roller scrapperassembly as per existingsize & design 91 fabrication of discharge roller scrapper assembly. 92 replacement of worn out bottom boot of inter carrier chain. 93 replacement of cast iron furnace chute of j.t. and texmaco boilers. 94 fabrication of rbc slats made out from 3 mm thick plate for both rbc chain 95 repair of rbc slat 96 replacement of m.s. bagasse chute of j.t. and texmaco boilers. 97 replacement of worn out furnace door ofj.t. boilers without frame 98 replacement of worn out furnace doorframe 99 repair & fitting of furnace door of texmaco / jt boiler 100 a ) fabrication of steam drum partition plates ofboilers 101 b ) repair of steam drum partition plates of boilers 102 boiler dampera ) dismantling 103 b ) fabrication 104 c ) erection 105 repair of id fan of j.t & texmaco boiler 106 repair of fd fan of j.t & texmaco boiler 107 replacement of worn out stainers of various types such as juice pump, lime pumps and syrup pumps. 108 complete replacement of worn out save all of evaporator bodies in all respects. 109 complete replacement of worn out save all of pans in all respects. 110 replacement of worn out vapour pipe of various sizes of pans going to condenser 111 replacement of worn out steam / water coil of ordinary designsize 1 / 2 to 3 112 do but 4 to 6 113 replacement of worn out steam / water coil of pure circular designsize 1 / 2 to 3 114 do but 4 to 6 115 dismantling, fabrication & erection of bends of pan’s vapour pipe line leading from body shell to condensers. rates to be quoted in terms of : full bend: size 900 mm 116 1100 mm 117 1250 mm 118 halfbend: size 900 mm 119 1100 mm 120 1250 mm 121 replacement of gutters a ) dismantling 122 b ) fabrication 123 c ) erection 124 a ) replacement of worn out stirrer arms ( straight type ) 125 b ) replacement of worn out stirrer arms ( worm type ) 126 replacement of worn out umbrella of pans 127 replacement of all pipe line of sulphur burners cooler, complete in all respect. 128 replacement of worn out portion of sulphur burner cooler inside pipeline. 129 complete replacement of worn out after burner of sulphur furnace i.e including the replacement of internal pipe line also 130 dismantling, fabrication and erection of sulphur burner melter of sulphur furnaces. 131 replacement of worn out bagacilo pipe line made out from g.i. plain sheet of standard size 132 replacement of y type steam connection for syrup and molasses tank at pan station 133 replacement of vacuum filter agitator 134 fitting & modification of planetary gear box along with dismantling of existing gear system. a ) 80 ton 135 b ) 60 ton 136 c ) 40 ton 137 replacement of worn out partition plates of headers of juice heaters, complete in all respect. 138 replacement of s.s pipeline of any size:a ) dismantling 139 b ) fabrication 140 c ) erection 141 lowering the height of evaporator body no. 1 similar to level of evaporator body no. 2 including water levelling and fitting of all connections. 142 repair of vapour line juice heater’s header cover:scope of work includes:a ) dismantling, facing / machining header cover.b ) s.s. lining of header cover by 6mm thick plate with duly facing and levelling. c ) fitting of existing cover plate after completion of the above mentioned work. 143 a ) replacement of hopper trough 144 b ) replacement of complete portion of hopper tray 145 replacement of molasses chute of ;a ) continuous centrifugal machine 146 b ) batch type centrifugal machine 147 replacement of any worn out shell portion of pug mills / magma mixers. 148 modification of cooling coils of overhead crystallizer into air cooled type. 149 fitting the complete magnetic separator system at sugar hopper tray. 150 dismantling of existing, obsolete aaw machines including all accessories i.e. pugmill, structure, elect. panel etc. along with motors. 151 dismantling of existing, obsolete afw machines including all accessories i.e. pugmill, structure, elect. panel etc. along with motors. 152 fabrication & erection of cable tray 153 replacement ofthimble ( any size ) 154 checking of cable connections, cleaning of thimbles & reconnection 155 replacement of switches / mccb 630 amp, 400 amp, 250 amp 156 replacement / erection of changeover switch 630 amp / 400 amp / 250 / amp...

Department of Cooperation - Punjab

32325749 fabrication and erection jobs of nakodar csm 2 replacement of worn out m.s. vertical supporting channels & side plate of final molasses storage tank no. 2 with m.s plate and channels. 3 strengthening of pans shell with angle and channels in round shape with ms angle 75x75mm and dia 4.34 mtr. ( two rounds ) 4 strengthening of evaporator shell with angle and channels in round shape with ms angle 75x75mm and dia 2.80 mtr. ( two rounds ) 5 dismantling, fabrication, erection of top cone below save all of evaporators. 6 dismantling, fabrication, erection of complete save all ( existing design ) of 2nd body evaporators including top plate, inner and outer shell. 7 dismantling, fabrication, erection of save all ( existing design ) inner plate of 2nd body evaporators 8 dismantling, fabrication, erection of umbrella of save all evaporator 4th body as per existing design including all supporting. 9 dismantling, fabrication and erection of quad condensate tank including all connection.size dia509mmxlength 1800mm 10 dismantling, fabrication, erection of hot water receiving tank of water weighing scale. the erection work for this job will also include all connections which are dismantled during dismantling. 11 dismantling, fabrication & erection of juice feed boxes of juice heater double bead valve. the erection work for this job will also include all connections which are dismantled during dismantling. 12 dismantling, fabrication & erection of absorption tower of syrup sulphiter. the erection work for this job will also include all connections which are dismantled during dismantling 13 dismantling, fabrication & erection of worn out stainer of juice sulphiter pump. 14 dismantling, fabrication & erection of worn out portion of bottom cone of juice sulphiter 15 dismantling, fabrication and erection of melter of sulphur furnace as per existing design. this work include dismantling and erection of all connections, man hole, flanges etc. 16 dismantling, fabrication and erection of scrubber of sulphur furnace as per existing design. this work include dismantling and erection of all connections, man hole, flanges etc . 17 dismantling, fabrication & erection of dorr coils ( nipple / flange / reducer rates as per general fabrication, erection rates ) 18 dismantling, fabrication & erection of dorr compartment shell with ms plate channel angles. the erection work for this job will also include all connections which are dismantled during dismantling. 19 dismantling, fabrication & erection of dorr compartment / chamber roof with ms plate channel angles supports. the erection work for this job will also include all connections which are dismantled during dismantling. 20 dismantling fabrication and erection of base plate of mud boot of dorr to make it leak proof. 21 replacement of sealing ring of dorr mud boot 22 dismantling, fabrication and erection of mud tank below rvf including all connections. 23 dismantling, fabrication and erection of clear juice feed box along its telescopic valve of dorr. 24 dismantling, fabrication and erection of worn out heavy / light vacuum tank of rvf including all connections. 25 dismantling, fabrication and erection of base plate of dorr compartment with their supporting angle / channel etc 26 dismantling, fabrication & erection of filter juice sealing bottles of receiving pit for vacuum filter. the erection work for this job will also include all connections which are dismantled during dismantling. 27 dismantling fabrication and erection of ms barometric condenser of rvf. this job will include all connections which are dismantled during dismantling. 28 dismantlingfabrication and erection of bagacillo pipeline from ms plate 3mm 29 dismantling, fabrication & erection of bagacillo cyclone. 30 dismantling, fabrication & erection of bagacillo chute. 31 dismantling, fabrication & erection of bottom trough of mud mixer for rvf 32 dismantling, fabrication & erection of screw conveyor of mud mixer 33 dismantling, fabrication and erection of ms vapour pipe of different sizes.1 ) dia 1050mm 34 1 ) dia 900mm , 35 2 ) dia 720mm 36 3 ) dia – 620mm 37 4 ) dia – 520mm 38 dia – 420mm 39 dismantling, fabrication & erection vapour / exhaust pipe bend 900mm dia 40 dismantling, fabrication and erection of distance piece of ms vapour pipe length up to 1.5 mtr.1 ) dia 1050mm 41 1 ) dia 900mm , 42 2 ) dia 720mm 43 3 ) dia – 620mm 44 4 ) dia – 520mm 45 dia – 420mm 46 dismantling of ms / ci condenser cone of pans 47 fabrication of ms condenser cone ofpans 48 erection of ms / ci condenser cone of pans 49 dismantling, fabrication, erection of umbrellas of pan save all as per existing design including all supporting. 50 replacement of worn out portion of bottom, side plate & supporting angle / channel of syrup and molasses tank at pan station 51 replacement of m.s plate gutter of crystallizer station and other factory units. 52 replacement of worn out portion ofpan soucer 53 dismantling, fabrication and erection of downtake of pan from 10 / 12mm plate 54 replacement of feed box of pans including all connections 55 dismantling, fabrication and erection distributor of pans 56 dismantling, fabrication & erection of worn out portion of molasses conditioner. this work includes dismantling and erection of all connection pipes and their drive unit. 57 dismantling, fabrication and erection of worn out bottom portion of crystallizer 58 fabrication and erection of catcher for c vacuum crystallizer. 59 replacement of crystallizer arms along with supports from 75x75mm m.s angle. ( a ) dismantling 60 ( b ) fabrication 61 ( c ) erection 62 dismantling, fabrication & erection of cooling coils of crystallizer including all connections. 63 dismantling and erection of branch pipes of spray pond. this work include all connections of clusters, 64 dismantling of ci / ms main pipeline spray pond 65 dismantling fabrication & erection of suction pipes of injection pumps with stainer. 66 dismantling fabrication & erection of suction pipes of spray pumps with stainer. 67 dismantling , fabricationerection of worn out bottom half portion of b magma mixture including allconnections. 68 dismantling, fabrication and erection of worn out bottom half portion of a pug mill including all connections. 69 dismantling, fabrication and erection of worn out portion of sugar hopper along with its alignment. size 4’ wide x 2 mtr length 70 dismantling, fabrication and erection of sugar melter pump stainer including all connections 71 fabrication and erection of bed for pump and motor of magma mixture along with suction and delivery pipe line connections, alignment of motor with pump etc. 72 modification of bagacillo screen for easy operation with fitting of ball bearings, wheels & guides in all respects. 73 dismantling, fabrication and erection of bottom discharge chute of continuous centrifugal machine 74 fabrication and erection of new syrup tank at pan station including all connections. 75 dismantling, fabrication and erection of ammonia coils of pans from ms pipedia 3”including all connection 76 dismantling and erection of tube plate ( top and bottom ) 2nd evaporator body including fabrication & erection of downtake including all connections 77 dismantling and erection of calendria with tube plate ( top and bottom ) of pan no. 4 including all connections alongwith fabrication & erection of downtake and dismantling & erection of distributor. 78 fabrication and erection of beds for pump and motor etc. 79 dismantling and erection of crystallizer shaft including arms and all connections, fittings. 80 dismantling, fabrication and erection of internal platesof catcher forsemi kestner 81 dismantling and erection of fabricated globe valve 30 “ in exhaust line of vapour cell. 82 dismantling, fabrication and erection of quad body outer shell including all connections. 83 dismantling, fabrication and erection cane cutter hoods from 8 10mm thick plate with ms angles etc. 84 dismantling and erection of expansion joint of power turbine exhaust line. 85 replacement of side plates of cane carrier chain / rbc and trough of rbc / bagasse elevator. 86 replacement of channel and i beam of rbc / cane carrier / bagasse elevator / cross rbc runner 87 dismantling, fabrication erection of juice tray of mill no. 2 from ms plate 88 fabrication of screw conveyor of mill house 89 dismantling, fabrication erection of ash hopper of boiler ( pyjamas ) cone with chute bottom portion ( cone tapper portion size 15” approximate ) 90 dismantling, fabrication of trough of screw conveyor, assembly of screw conveyor with trough & its erection. 91 repair of rotary bagasse feeders of boilersa ) body 92 b ) rotor 93 replacement of side plate 3mm / old ms plate of boiler ( with ms plate & supporting angle / flat ) 94 dismantling, fabrication & erection of worn out ducting of boiler & apcd including angle, channel, flats& flanges 95 dismantling, fabrication & erection damper of boiler ducting 96 dismantling fabrication & erection of expansion jointof boiler ducting ( 3.360 mtr x 1.260 mtr ) 97 replacement of ms gutter of apcd plant from wet scrubber to ash pits 98 dismantling fabrication & erection of damper of rotary bagasse feeder 99 dismantling, fabrication & erection of worn out portion of id and apcd fan casing 100 replacement of sieve plates of apcd scrubber. this job also includes 10 / 12mm holes ( 324 holes per square ft. ) drillingin plates 101 baffle plates ( ms flat 65 x 6mm ) of demister in wet scrubber 102 repair / replacement of wornout portion of wet scrubber of boiler no. 1 & 2 103 dismantling fabrication and erection of receiving tank / sum tank / sealing tank of wet scrubber. 104 replacement of g.i sheet gutter of factory building 105 replacement of worn out of m.s. runner of inter carrier, elevator, rbc , cross carrier & cane carrier chains 106 juice heater / v.l.j.h. tubes a ) dismantling 107 b ) fitting 108 semi kestner tubes a ) dismantling 109 b ) fitting 110 quad bodies ss tubes1st to 4th a ) dismantling 111 b ) fitting 112 pans tubesss 1st to 5th a ) dismantling 113 b ) fitting 114 welding joints of water , juice , vapor and exhaust pipe line of exhaust pipe lines of all sizes. 115 ms pipe line 1 / 2 to 12” diaa ) dismantling 116 b ) erection 117 ss pipe line 1 / 2 to 12” diaa ) dismantling 118 b ) fabrication 119 c ) erection 120 ci pipe line 1 / 2 to 12” diaa ) dismantling 121 b ) erection 122 ms pipe line above 12” dia from ms plate ( other than vapour pipe of pan and quad ) a ) dismantling 123 b ) fabrication 124 c ) erection 125 a ) ms bend upto 12” dia a ) dismantling 126 b ) fabrication 127 c ) erection 128 b ) ms bend above 12” dia from ms plate ( other than v.p. pans & quad ) a ) dismantling 129 b ) fabrication 130 c ) erection 131 ci bends sizes 1” to 6”a ) dismantling 132 b ) erection 133 dismantling, fabrication& erection of m.s ( all sizes ) a ) tee, 134 b ) nipples, 135 c ) crosses 136 d ) reducers 137 e ) elbow 138 dismantling, fabrication& erection of s.s ( all sizes ) a ) tee, 139 b ) nipples, 140 c ) crosses 141 d ) reducers 142 e ) flange 143 f ) elbow 144 g ) bend 145 replacement of wornout ms cone ( all sizes ) 146 ms flanges ( all sizes ) a ) dismantling 147 b ) fabrication 148 c ) erection 149 dismantling , fabrication and erection of manholes ( all sizes ) 150 a ) dismantling of platform plate 151 b ) fabrication & erection of platform plate 152 m.s. tankhaving round & conical & rectangular bottomsa ) dismantling 153 b ) fabrication 154 c ) erection 155 m.s structure trusses, perlins, columns & beams ( factory building ) a ) dismantling 156 b ) fabrication 157 c ) erection 158 platform railing from old pipe & angle a ) dismantling 159 b ) erection 160 patch work of any part of any equipment with 3mm to 10mm thick plate max. upto 1 sq meter 161 dismantling of sluice valve / angle valve / n.r.v. 162 erection of sluice valve / angle valve / n.r.v. , butterfly valve 163 replacement of rail line of caneunloaderwith 50mm square bar...

Department of Cooperation - Punjab

32298800 fabrication and erection jobs of bhogpur csm 1 bhogpur csm 2 fabrication and erection of cane unloader bridge platform 3 dis, feb, & errection of umbrella of pan along with its supports. 4 dismantling, fabrication & erection of vapour pipe 700mm and 900mm& 1000 mm from 8 / 10mm thick plate. 5 rmp pipes & clusters replacement of spray pond.pipe 6 b ) cluster 7 c ) reducer 8 d ) blind 9 dismantling of spray pump header, fabrication, erection and fitting ofpumps etc 10 fabrication & erection of bagasse elevator stair case & platform 11 replacement of brass / ss tubes of pans 12 dismantling and erection of various sizes of ms and gi pipe lines up to 1 3 / 4 dia 13 dismantling and erection of various sizes of ms / gi pipe lines from 2’’to12” dia. 14 dismantling, fabrication and erection of ms pipe above 12’’ dia from msplate and shifting / dragging it as per direction. 15 fab.and fitting of ms flange complete with holes by drilling up to 12’’dia 16 fab.and fitting of ms flange complete with holes by drilling above 12’’dia 17 dis. and cleaning of ms flange from old pipe lines. 18 fabrication and erection of following items from ms pipe up to 12” dia.a ) ms nipple 19 b ) ms bend 20 c ) m s tee 21 d ) ms cross 22 e ) ms reducer 23 f ) m s cone 24 fabrication and erection of following items from ms pipe up to 12” dia.a ) ms nipple 25 b ) ms bend 26 c ) m s tee 27 d ) ms cross 28 e ) ms reducer 29 f ) m s cone 30 dismantling and fitting of gi / acc sheet.dismantling 31 fitting 32 dismantling of machinery and structure as instruction of ce 33 fabrication and erection of machinery and structure. 34 erection of machinery 35 patch work of different equipments such as cane carrier, and intercarrier. 36 dismantling and erection of worn out runners of cane carrier, rbc, bagasse elevator and inter carrier 37 to straight the old damaged vapour pipe and round tank for platform. 38 dis, feb, & errection of steam coil of molasses storage tank at pan stationsize 1” to 2”. 39 dis, feb, & errection of juice coil of juice clarifier size 4”, 5” & 6” alongwith its nipple. 40 dis, feb, & errection of open & closed crystallizers arms 41 dis.feb & eraction of wt. juice sulphited juice stainer 42 dismantling, fab. & erection of ss pipe up to 12’’ 43 dismantling, fab. & erection of following items upto 12’’ of ssss nipple, 44 ss bend 45 ss tee 46 ss cross 47 ss reducer 48 ss cone 49 dismantling, fab. & erection of ms flat ( runner ) , cane carrier, rbc chainetc. 50 dismantling, fab. & erection of motor bed with alignment 51 dismantling of complete exiting calendria 600 m2 h.s. & each tube alsocomplete to be dismantling. 52 erection of milk of lime new hopper along with staging , platform &drive. fitting of wooden strips 53 fabrication & erection of 30 tons capacity sugar melter completescope of worka work to be completed as per drawing.b fabricate & erection of ms 10 mm thick plate of app size:3.5mx3.5 mc fitting of stirrer drive.d fitting of perforated plates having hole dia 1.5 mm allalong the platese drive stirrer to be mounted along with shaft & ss ball 2.0inch ball.f fabricate & erect of steam coil 02 nos. periphery insidethe drumg fabrication of staging on which drum to be mounted.h outlet pipe 12.0 inch dia tobe provided.i steam coil along with nrv & valves to be fitted.j hot water connection to be made along with valves.k dismantling of reduction gear & motor & to be fitted on itfrom old mill.l alignment of reduction gear to be made with motor.m repair of reduction gear.n water trial of complete unit.o fabrication & erection of platform 54 magma mixture for brown sugar reprocessingscope of worka dismantle the magma mixture from old mill and to erect atsuitable place at new mill.b dismantle & erection of magma pump, molasses pumpalong with pump beds.c fabrication of staging and platforms along with m.s. stairs.d dismantle of stirrer drive and erection of it along withmotor.e trial of complete unit. 55 dismantling & fitting of ss tubes in calendriasize: 45mm odx1.2mm thickx2010mm long 56 size:98 mmodx1.6mm thickx905 mm long 57 dismantling, fabrication and erection of pansave all top plate 58 shifting & erection of seed mixture at new millscope of worka dismantle of dry seed mixture from old factory.b erection of same along with drive at the top of dry seedcrystallizer at new millc proper staging to be made.d hot water connection to be made. 59 dismantling, fabrication and erection of drain gutter of sugar drierhouse 60 replacement of sugar hopper plates of all 03 nos.scope of worka dismantle of old worn out plates.b fabricate of new plate of hopper of 05 mm thick according toexisting size.c proper strengthening of plates.d erection of complete hopper along with accessoriese fitting of crank shaft with crank shaft.f fitting of rori jail along with frame.g fitting of powder sugar jali with frame. 61 shifting of old sugar hopperscope of worka dismantling of old sugar hopper from old factory along withdrive.b erection of hopper at new mill site in dryer house.c refurbishment of hopper plates.d fitting of wooden all stripse erection of connecting rod along with drive.f accessories to be made relating to hopper 62 planetary gear boxerection of planetary gear box at crystallizer 63 replacement of central shaft.fabrication & erection of shaft, along with helis type stirrer of b vacuumcrystallizer 64 erection of gear operated butterfly valve in place of discharge valve inpans 65 fabrication & erection of pneumatic shoot 66 erection of pneumatic clamps 67 replacement of old gate valve with new gate valve of crystallizers 68 dismantling of double beat valve and erection of same of juice heater at existing site. 69 shifting of nk 1100 continuous centrifugal machine along with pug mill, magma mixture, magma pump, molasses pump and pipe line from oldplant to new plant.scope of work:a dismantling of nk 1100 continuous centrifugal machine fromold mills at existing site along with magma pump, molassespump, drive, motor, foundation beds, pipe lines , pugmill alongwith drive, magma pump along with its drive from old mills.b dismantle of existing staging of machine, pug mill, magmamixture etc.c erection of nk 1100 continuous centrifugal machine along withaccessories at mill at suitable place.d rebufbishment of any parts seems weak to be carried out.e water level to be madef erection of motor bed along with motor.g erection of pugmill, magma mixture, magma pump, molassespump along with all drives , foundation bed relating to machine.h proper platform to be made.i complete water trial of unit 70 shifting & erection of cfw continuous centrifugal machine from old millto new millscope of worka dismantling of pug mill along with drive.b dismantling of centrifugal machine along with motor.c dismantling of magma mixture along with drive.d dismantling of magma pump & molasses pump along with foundation bed.e erection of machine in new mill along with motorf erection of pug mill along with drive.g erection of magma mixture along with drive.h erection of magma pump & molasses pump along with drive.i erection of staging & platform to be done.j complete trial of units. 71 shifting & erection of air compressors & super heater wash watersystem from old mill to new millscope of work:a dismantling of air compressors along with motors.b dismantling of its pumps & motorc dismantling of all accessoriesd erection of air compressors along with motorse erection of pumps and motors 72 shifting & erection of injection pump with motor from old mill tonew plant. 73 dismantling of mud mixture from old mill and to erect the same innew mill at vacuum filter station along with accessories with related connection. 74 dismantling of transient heater from old mill and to erect thesame in new mill at centrifugal station along with accessories withrelated connection. 75 dismantling , fab.& erection patch work of inter rake carrier side plate 76 dismantling , fab.& erection main bagasse carrier trough & side plate 77 fabrication & erection of bagasse elevator stair case &platform 78 fabrication & erection of factory structure complete window ( frame &grills ) 79 dismantling , fab. & erection of mill house & boiler house plate form 80 modification, & erection of mill house rotary screen inlet juice tank& platform 81 fabrication and erection of excess bagasse carrier to rbc as per thedirction of ce scope of work ( a ) fabrication and erection of column and structure for belt conveyor , along with drive system and discharge chute to rbc column and steelstructure 82 ( b ) dismantling of belt conveyor and its structure along with drivecomplete in all respect 83 dismantling , shifting & erection of old plant bagasse yard shed to new plant bagasse yard 84 fabrication and erection of cooling tower structure and shed 85 shifting & erection of cane unloder trolly gear box with motor old plant to new plant 86 fabrication and erection of excess bagasse carrier to rbc as per the dirction of ce scope of work 87 dismantling & erection of following items from c.i pipe up to 12” dia.a ) c.i bend 88 b ) c.i tee 89 c ) c.i cross 90 dismantling and erection of various sizes of c.i pipe lines from 2’’to 12” dia. 91 dismantling , shifting & erection of old plant cane carrier unloader shed to new plant unloder shed 92 dismantling , fab. & erection of mbc motor bed with alignment 93 fab. & erection of electrical poll 94 modification, & erection of boiler prds line 95 modification of mud mixture scope of worka to increase length 1.2 meter of mud mixture shell.b to increase stirrer length 1.2 meter lengthc to erect all connecting pipe lines.d to fabricate & erect scroll up to the length of mud mixture.e shifting of outlet mud withdrawal pipes. 96 filtrate juice receiving tank scope of worka filtrate juice tank dia1900mmx1260mm height to be fabricated and erected to increase the height of tank.b all connecting pipe lines ( having 3.0dia ) to be re erected after dismantling of lines, valve etc which were dismantled.c all suction connections of pumps to be made. 97 dismantling of syrup pipe line and re fitting after cleaning the same. a dismantling 98 b refitting 99 sugar hopper ( app.45meter ) a dismantling 100 b ) fabrication 101 c ) erection 102 butterfly valvea dismantling 10inch dia to 16.0 inch dia 103 b erection 10inch dia to 16.0 inch dia 104 sluice valvea dismantling 10inch dia to 16.0 inch dia 105 b erection 10inch dia to 16.0 inch dia 106 a dismantling and erection of transient heater from old mill to new mill 107 b dismantling of transient heater from existing site at new mill 108 fabrication of multi tray of sugar hopper wide 1.5 meter 109 erection of top &bottom tube plates of evaporator body along with tie rods. 110 fabrication & erection of calendria shell of 600 square meter along with down take, vapour pipe, non condensable gas pipe line, clear juice inlet outlet juice connection. 111 dismantling of reduction gear, motor, stirrer shaft of juice sulphiter from old mill to new mill. 112 fabrication and erection of monkey ladders 113 erection of flow meter valve dia 6.0 inches 114 erection of sludge pump along with pumps size: 4x4 inches 115 :6x6 inches 116 dismantling, fabrication & erection of gate valve of crystallizersize: 08 inches 117 size :10 inches dia 118 dismantling , fabrication and erection of distributor of pan 119 fabrication & erection of wire netting frame and its wire netting 120 fabrication & erection of sugar tray of hopper under neath hopper no.3. 121 dismantling , erection of butterfly valves in place of old discharge valve along with modifications of massecuite gutter. 122 erection of chimney of juice sulphiter ( 8.0 inch dia ) and clarifier ( 10.0 inch dia ) 123 modification of juice box of clarifier juice outlet pipes to be decreased by 200mm dia height ( 104 nos pipes ) 124 modification of syrup sulphiter scope of worka holes to be increased from existing perforated plates 03 nos. plates of recovery tower ( 600mm dia plate ) b holes to be increased from existing plates of drums ( big &small plates ) .c so2 gas pipe lines to be modified.d spurger of so2 gas inside the drum to be modified.e flanges to be provided inside the ss. pipes.f man holes having dia 500 mm 03 nos. to be provided.g dismantling of 2.0 inches dia. pipes and erection of 4.0 inches dia to be erected . ( app. length. 18 meter ) h dismantling and erection of bend of outlet syrup lines ( 12.0 inches dia ) 125 sulphur furnacescope of worka dismantling of top cover of furnace to be opened.b baffle plate to be shifted 400 mm from existing site .c new 6.0 inches widex1200 mm plate to be fitted.d dismantling and erection of ms after burner.e dismantling, repair and erection of coolers 02 nos. of so2 pipesf dismantling and erection of distributor pipeg dismantling and erection of so2 pipes 126 side catcher of juice sulphiterscope of worka dismantling & refitting of old top coverb dismantling of internal 12 inches pipe up to length of catcher.c dismantling, fabrication , erection of manhole along with cover 500mm dia. 127 pans 6 nos scope of worka brass tubes to be taken out after breaking out from expand.b fitting of ss tubes and to make leak proof from expand.c all tubes to be made leak proof from expand.d calendria to be hand over after testing of normal pressure for hydraulic testing to mill fitter. 128 m.s. manhole with blind coversdismantling 129 b ) fabrication 130 c ) erection 131 scroll for mud mixture app 3.0 meter long and scroll dia 600 mma dismantling 132 b ) fabrication 133 c ) erection 134 fabrication & erection of deflection cone in centrifugal machines with proper angle 135 fabrication of water header along with nipples for supply of hot or cold water to centrifugals 136 vapour line juice heaterscope of worka blind to be provided in both inlet and outlet vapour pipe of quad.b hydralic testing to be done.c after testing of vljh , blind to be taken out. 137 fabrication of window with double door along with hinges and kundi 138 pan condensate tankscope of worka dismantling of old condensate tank from old mill.b shifting this tank from old mill to new mill.c dismantling of worn out pan condensate tank from existing site of new mill.d erection of pan condensate along with modification . 139 spray pump 2000 m3 / hrscope of worka dismantling of old spray pump from old millb erection of same at new mill.c modification of strainer of tail pipe.d dismantling of ms pipe app lengthe erection of ms pipe pipe.f erection of butterfly valve. 140 modification in sugar grader scope of gradera modification in ss wirenetting framesb dismantling of worn out of sealing plates , fabrication and erection at existing place.c modifications in hooks. 141 shifting of ms stairs with modification of sugar grader 142 dismantling of stairs from unloader side old mill and erection at sugar grader at new mill after modification 143 fabrication of erection of double beat valve flange 8.0 inches dia 144 juice sulphiter receiving tanka fabrication and erection of cover plateb fabrication and erection of man hole with blind cover 500 mmdia.c ladder to be providedfrom ground floor uptothe height of receiver. 145 erection of railing 146 dismantling & shifting of valves from old mills and fitting at new mills 08, 10, 12, 14, 16, 18, 20, 22, 24 , 26, 28, 30 inches diaa dismantling 147 b ) fabrication 148 c ) erection 149 modification in telescope valve of mud side, replacement of worn out bottom plate. 150 cold air blowera modification in bed 151 b dismantling and erection of blower 152 strengthening of angle iron channel 153 erection of angle channel in side the sugar elevator / dry seed elevator. 154 shifting of pan condenserscope of worka dismantling of old pan condenser alongwith tail pipe from old millb dismantling of existing condenser of pan no. 5 from new mill.c erection of same in place of pan condenser of pan no.5 at new mill. 155 dismantling & erection work of m / c gutter 156 dismantling & erection of air compressor tank 157 erection of sugar elevator window both side 158 fabrication and erection of shed for etp station electrical panel and motor pump 159 fabrication and erection of shed for dryer housesize 85feet x35 feet 160 shifting and erection of continuous centrifugal machines without pug mill and magma mixture from old mill to new mill.scope of work.a dismantling of centrifugal machines along with motor.b erection of machines in new mill along with motorc erection of staging & platform to be doned complete trial of machines.e rotate the magma mixture 90 degree.f water connection to be made.g dismantling of magma pumps, molasses pumps along with pump beds from old mill.h erection of magma pumps, molasses pumps along with pump beds at new pump.i complete trials of the unit. 161 erection of molasses pump. scope of work.a. fabrication new structure bed.b. erection of molasses pumps along with valves and complete pipe line ( 6” ) from centrifugal section to pan floor receiving tank.c. complete trial of molasses pumps. 162 dismantling & erection of m / c gutter size 510mmx490mm. 163 dismantling , fabrication & erection modification of structure of reduction gear box grader with alignment 164 modification in drive foundation bed of reduction gear box and motor sugar elevator. 165 job work of juice sulphiter modification revised scope of worka work to be completed in side the drum as per drawingb dismantling of existing 1.5 meter dia inside first drum.c dismantling of existing 2.5 meter dia inside second drum from juice sulphiterd perforated ms plates having 3.0 meter dia 03 nos along with 2.0 inch hole dia to be made to be fitted at site.e m.s. channels 100 mm to be fitted inside the drum.f stirrer shaft to be mounted along with bearing housing with 2.0 inches ball.g erection of reduction gear of stirrer drive.h alignment with reduction gear & motori dismantling of reduction gear & motor from old mill juice sulphiter.j 03 nos.manhole to be provided at suitable positionk modify of sperger and its dome.l rearranging of so2 and juice lines 166 modification in juice heaterscope of work1. dismantling / removal of all tubes of juice heaters by breaking of expand from top & bottom tube plates.2. length of all tubes to be reduced from 4460mm to 4000mm.3. cut down the bottom tube plate4. calendria shell length to be reduced from 4660mm to 4000 mm5. erection of bottom tube plate with the shell according to the length of tubes.6. bottom cover to be set right.7. hydraulic testing of calendria to be done at 60 psig. complete water trials. 167 dis of ms pipe line 168 dismantling, fab. & erection of inter rake carrier as per direction ce. scope of worka. dismantling , fabrication & erection of inter rake carrier side plate b .dismantling & fabrication of inter rake carrier dive &tail shaft sprocket distance pecsc .dismantling , fabrication & erection of inter rake carrier runner boxd. complete trials of inter rake carrier 169 fitting of g.i coler coated trapezoidal sheet 12 mtr 170 do 6 mtr 171 dismantling, fab. & erection of structure colum binder 172 repair of structure colum binder 173 dismantling, fab. & erection of ms angle & channel 174 dismantling, fab. & erection of perling / stress hannel 100x50 175 fabrication & erection of shed gutter size 1’x1’x’1’ plate 3mm thk. 176 shifting , dismantling , fabrication and erection of gantry for rbc sprocket and gear 177 modification of both side chain sprocket bed for mbc and rbc 178 cleaning & double coat painting for cane unloader shed structure 179 dismantling , fabrication and erection of runner box for mbc, rbc, and bagasse elevator 180 fabrication and erection of chute for mill to mill bypass system 181 modification in hot air blowerscope of worka. dismantling of air blowerb. modification in bedc. erection of blower....

Department of Cooperation - Punjab

32288527 fabrication & erection jobs ( budhewal csm ) 1 budhewal csm 2 pipe linem.s1” to 12” diaa ) dismantling 3 b ) erection 4 replacementofpipe linem.sabove 12” dia ( other than vapour pipe of pan and quad ) 5 pipe linec.i.1”to 12” diaa ) dismantling 6 b ) erection 7 ibr steam pipe line .3”to 8” diaa ) dismantling 8 b ) erection 9 a ) bend m.supto 12” diaa ) dismantling 10 b ) erection 11 b ) bend m.s.above 12” dia ( other than vapour pipe line ofpans & quad ) a ) dismantling 12 b ) erection 13 bendofm .s.upto 12” dia ( other than vapour pipe line ofpans & quad ) a ) dismantling 14 b ) erection 15 nippleofm .s.upto 12” dia ( other than vapour pipe line ofpans & quad ) a ) dismantling 16 b ) erection 17 reducerofm .s.upto 12” dia ( other than vapour pipe line ofpans & quad ) a ) dismantling 18 b ) erection 19 bend, nipple, reducer ofm .s. above 12” dia ( other than vapour pipe line ofpans & quad ) 20 man holes of all sizesa ) dismantling 21 b ) fabrication 22 c ) erection 23 flanges of all sizea ) dismantling 24 b ) fabrication 25 c ) erection 26 m.steea ) dismantling 27 b ) erection 28 m.snipplea ) dismantling 29 b ) erection 30 m.scrossa ) dismantling 31 b ) erection 32 m.sreducers a ) dismantling 33 b ) erection 34 m.sblind a ) dismantling 35 b ) erection 36 dismantling, fabrication and erectionm.scoil of2” to 4” dia 37 replacement platform of any type 38 m.s. structure work ( factory building ) replacement 39 m.s.tank having round &rectangular bottomsreplacement 40 trusses, perlins, columns & beams ( factory building ) replacement 41 platform pipe line railing of all sizes a ) dismantling 42 b ) erection 43 electric panel, db and other machinery shed gi / acc / ms sheeta ) dismantling 44 b ) fabrication 45 c ) erection 46 dismantling, fabrication and erection of pump and motor bed of all size 47 valves sluice / angle / n.r. / butterflydismantling 48 b ) erection 49 conefromm.splatea ) dismantling 50 b ) fabrication 51 c ) erection 52 gutter from m.s plate 5mm a ) dismantling 53 b ) fabrication 54 c ) erection 55 crystallizerslide gatevalvea ) dismantling 56 b ) fabrication 57 c ) erection 58 fabrication and erection of m. s terminal box of any type 59 patch workof boiling house / mill house 60 replacementof sulphurfurnace scrubberfrom m. s. plate from 10mm ( including all connections with pipe lines ) 61 replacementofsulphurfurnace melter / receiver from m. s. plate from 10mm ( including all connections with pipe lines ) 62 sulphurfurnace chamberfrom m. s. plate from 10mm ( including all connections with pipe lines ) dismantling , fabrication&erection 63 dismantling , fabrication & erection of sulphur furnace nipples, bends 64 juice heater outer shellfrom m.s. plate 10mm including hydraulic testing at 50 psi for each juice heatera ) dismantling 65 b ) fabrication 66 c ) erection 67 fabrication & erection of mud mixture scroll & side plateswith proper alignment & commissioning 68 juice clarifier inside compartment coil from m.s. pipe 5” with all connections complete job ( as where it is ) dismantling, 69 b ) fabrication 70 c ) erection 71 dismantling, fabrication & erectionof juice heater angle valves , distance piece from m.s. plate 10mm of diameter 12” 72 dismantling, fabrication & erection of juice heater ( top & bottom ) compartment partition plate with rubber fitting channels from m.s / en 8 square bar & rubber seal fitting to make it leak proof ( to avoid short circuiting ) i ) top compartment 73 ii ) bottom compartment 74 dismantling fabrication & erection of ms channel of rubber strips of juice heater compartments with m.s / en 8 square to avoid short circuiting 75 quad body shell from m. s. plate12mm dismantling 76 b ) fabrication 77 c ) erection 78 top conefrom m. s. plate12mmdismantling 79 b ) fabrication 80 c ) erection 81 umbrelllafrom m.s. plate10mm dismantling 82 b ) fabrication 83 c ) erection 84 down take from m.s. plate12mmdismantling 85 b ) fabrication 86 c ) erection 87 save –allfrom m.s. plate10mmdismantling 88 b ) fabrication 89 c ) erection 90 pan ( capacity 40 ton ) body shell from m. s. plate12mm dismantling 91 b ) fabrication 92 c ) erection 93 top conefrom m. s. plate12mmdismantling 94 b ) fabrication 95 c ) erection 96 umbrelllafrom m.s. plate10mm dismantling 97 b ) fabrication 98 c ) erection 99 down take from m.s. plate12mmdismantling 100 b ) fabrication 101 c ) erection 102 save –allfrom m.s. plate10mmdismantling 103 b ) fabrication 104 c ) erection 105 vapour / exaustpipe line of quad and pan from m.s plate 8mma ) dismantling 106 b ) fabrication 107 c ) erection 108 dismantling , fabrication & erection of distance piece of vapor pipe of pan / quad & injection header length upto 1.5 mtra ) dia 1000mm 109 b ) dia 900mm 110 c ) dia 720 mm 111 d ) dia – 620 mm 112 e ) dia 400mm 113 dismantling, fabrication & erectionof steam jacket of evaporator / semi kestner including nipple, flange if any 114 syrup / molasses tank from m.s plate 8mm along with strengthening with m.s angle a ) dismantling , fabrication &erection 115 replacement / patch work of worn out body shell of final molasses storage tankwith m.s. plate 116 replacement / patch work of worn out roof of final molasses storage tankwith m.s. plate 117 a. dismantling, fabrication & erection of suction pipes of injection / spray pumps including reducer 118 b. dismantling, fabrication & erection of strainersof injection / spray pumps . 119 dismantling, fabrication & erection of cooling coilsof crystallizers including connection pipe if any 120 dismantling , fabrication and erection water weighing & receiving tanks 121 a ) dismantling, fabrication, erectionof magma mixturebodyincludingdriving units complete 122 b ) patch work of any magma mixture / pug mill 123 replacement of worn out round portion of crystallizer body 124 repairandfitting of bush to crystallizer ‘s central shaft 125 replacementofworn out condensatejuice receiving bottleswith all connection 126 dismantling, fabrication & erection of completescrapper hinge of juice clarifier 127 a ) dismantling, fabrication & erection of dorr’ s scrapper 128 b ) dismantlingfabrication & erection of flash tank of dorr with all nipple etc. 129 replacement of c.itailpipe of pan & quad with ms pipe line 130 replacementofcondenser jet box 131 dismantling, fabrication & erectionof the bottom portion of pug mill ( centrifugal machine ) 132 replacement of the outer shell of the dorr clarifier 133 replacement / repair of worn outportionof sugargraderside plates & chutes 134 replacement / repair of worn out portionofhopper 135 replacement of air tray of hopper 136 dismantling, fabrication & erection of worn out shaft of crystallizerincludingcomplete gear arrangement with complete commissioning 137 dismantling , fabrication & erection of ribbon type arms of crystallizer 138 complete replacement of ribbon type arms of crystallizer 139 dismantling , fabrication & erection of vacuum filter condenser 140 dismantling , fabrication & erection distribution plate of central shaft of juice clarifier 141 dismantling , fabrication & erection mud boot of juice clarifier 142 dismantling& erection of spraypump with all connection including distance piece 143 vacuum filter trough& agitator repair / patch work 144 dismantling, fabrication & erection of vacuum filter trough 145 strengthening of umbrella of pan / quad body 146 strengthening of save all of pan / quad body 147 dismantling, fabrication & erection of juice sulphitor chimney 148 dismantling, fabrication & erection ofcomplete a magma mixtureincluding fitting of central shaftwith arms & gear arrangement with commissioning 149 dismantling & erection of pug mill gear arrangement& replacement of bush , works includes fitting of radicons & commissioning 150 modification of exhaust blower including strengthening of bed & commissioning 151 modification of dry seed elevator bottom chute to avoid breakdown / jamming 152 dismantling, loading & transportation of discharge valve of pan from csm patiala & unloadingat csm budhewal 153 dismantling &erection of discharge valveof pan no 4 withmodification if any including trials & commissioning at csm budhewal 154 re tubing of evaporator body ( approx.1600tube ) including hydraulic testing at 50 psi 155 dismantling &erection of tube plates of 3rd body of evaporator 156 dismantling & erection of transient heater with all connection of pipe lines, valveswith modification if any including trials & commissioning 157 dismantling, loading & transportation of transient heater from csm patiala & unloading at csm budhewal 158 dismantling , fabrication & erection of venturi of condenser 159 dismantling, fabrication & erection of bottom sourcer of pan no 4 160 dismantling, fabrication& erection of chute of 5’ widthgrader for leak proof working 161 repair / replacement of bagacillo perforated plate of bagacillo blower for r.v.f 162 modification job of bottom saucer of evaporator 163 dismantling , fabrication & erection of ammonia coil of pan / quad 164 sulphur furnace heating element repair / replacement of jacketsincluding nipples 165 dismantling & erection of partition box of juice heater 166 replacement of worn out of m.s. runner of inter carrier, elevator, rbc, cross carrier & cane carrier chains 167 replacement of rail line of cane unloader with 50mm square bar 168 replacement of worn out ducting of boiler & apcdincluding angle, channel, flats & flanges 169 replacement of side plates of cane carrier chain / rbc trough / cross elevator / bagasse elevator 170 leveling of cross elevator chain trough 171 mill house screw conveyor assembly ( complete with bearings ) dismantling , 172 b ) fabrication 173 c ) erection 174 replacement of worn out portion of apcd includes casing / scrubberand flue gas entry connected to chimney portion etc. 175 cane cutter hood and chopper top plate from 12 mm thickm.s platea ) dismantling 176 b ) fabrication 177 c ) erection 178 dismantling, fabrication & erection of worn out portion of chute cane carrier to 1st mill 179 replacement runner ( flat size 50x8mm ) of cane carrier / cross elevator / rbc / baggase elevator 180 dismantling, fabrication, erection of juice tray of mill no. 1 & 2 from m.s plate 8mm 181 10 mm 182 dismantling, fabrication, erection of juice tray of mill no. 1 & 2 from s.s plate 8mm 183 10 mm 184 repair of rotary bagasse feeders of boilersa ) body 185 b ) rotor 186 replacement of casing of boiler ( both plate & supporting angle ) 187 i.d. fan worn out casing of both boilersdismantling 188 b ) fabrication 189 c ) erection 190 replacement of the expansion joints of boilers 191 replacement of worn out ductingthe boilers 192 erection and fabrication ofany thingfrom scrap 193 replacement of inter carrier side plates 194 replacement of scraper barside platessize : 1 meter square 195 replacement of the casing of air heater 196 replacement of worn out of m.s. runner of inter carrier, elevator, rbc, cross carrier & cane carrier chains 197 replacement of rail line of cane unloader with 50mm square bar 198 replacement of worn out ducting of boiler & apcdincluding angle, channel, flats & flanges 199 replacement of side plates of cane carrier chain / rbc trough / cross elevator / bagasse elevator 200 leveling of cross elevator chain trough 201 mill house screw conveyor assembly ( complete with bearings ) dismantling , 202 b ) fabrication 203 c ) erection 204 replacement of worn out portion of apcd includes casing / scrubberand flue gas entry connected to chimney portion etc. 205 cane cutter hood and chopper top plate from 12 mm thickm.s platea ) dismantling 206 b ) fabrication 207 c ) erection 208 dismantling, fabrication & erection of worn out portion of chute cane carrier to 1st mill 209 replacement runner ( flat size 50x8mm ) of cane carrier / cross elevator / rbc / baggase elevator 210 erection and fabrication from scrap 211 replacement of inter carrier side plates 212 replacement of inter cane carrier plates 213 replacement of scraper barside platessize : 1 meter square 214 replacement of air heater tubes ( approx.555tubes ) including hydraulic testing...

Department of Cooperation - Punjab

32288422 fabrication and erection jobs of gurdaspur csm 1 gurdaspur csm 2 repair of cane unloader grab arms 3 replacement of sq. bar of cane unloader. 4 fabrication & erection of hydraulic grab of unloader complete. 5 repair, strenghening and alingment of bridge span of unloader no. 1 6 dismantling, fabrication and erection ofa ) mincer hood 7 b ) cutter hood 8 c ) chopper hood 9 replacement ofcane cutting knives of cutters 10 replacement ofcane cutting knives of mincer 11 fabrication & fitting of stationary knives structure withknives 12 replacement ofhammers of mincer 13 replacement of domite tipsof mincer 14 to build mill top rollers square end as per standard size 15 to build mill rollers crown pinion teeth as per standard template of teeth. 16 to build mill rollers coupling square section as per standard size 17 to build mill rollers journal as per standard size 18 to build millunder feeder rollers drive gear teeth as per standard template of teeth 19 fabrication and erection of mill rollers crown pinion guard 20 fabrication and erection of donnelly chute of mills 21 dismantling, fabrication and erection of worn out juice tray at mill house from 10 / 12 mm plate 22 dis. feb. & erection ofmill house screw conveyor 23 dis. feb. & erection of mill house screw conveyor trough along with dismantling and fitting of conveyor and drive system. 24 dismantling and erection of worn out runners of cane carrier, rbc, bagasse elevator and inter carrier. 25 dismantling, fabrication and erection of worn out side plates of cane carrier, rbc, bagasse elevator and inter carrier. 26 dismantling, fabrication and erection of worn out trough of rbc, bagasse elevator & rack carriers froma ) ms plate6 / 8 mm 27 b ) ss plate 4 / 5 mm 28 dismantlingfabrication and erectionstructure of cane carrier drive , rbc chain drive, rakecarrier and elevator chain drive 29 replacement of worn out bottom boot of intercarrier chain / secondary chain 30 replacement of angle and channel of cane carrier / rbc / rack carrier & elevator . 31 repair of secondarycane carrier chain and elevator chain rake 32 fabrication of secondarycane carrier chain and elevator chain rake 33 fabrication of rbc slates 34 repair of rbc slates 35 dis. and erection of bagassecillow blower 36 fabrication of bagassecillow blower 37 dismantling and erection of boiler bagasse feeding ci furnace mouth piece of wil make boiler. 38 dismantling and erection of boiler bagasse feeding ci furnace chute 39 replacement of furnace door frame of wil make boiler & texmaco make boiler 40 replacement of furnace doorof wil make boiler & texmaco make boiler 41 repair and fitting of furnace door frame of wil make boiler & texmaco make boiler 42 repair and fitting of furnace doorof wil make boiler & texmaco make boiler 43 replacement of furnace chamber door frame of wil make boiler & texmaco make boiler 44 replacement of furnace chamber door of wil make boiler & texmaco make boiler 45 repair and fitting of furnace chamber doorof wil make boiler& texmaco make boiler 46 repair and fitting of furnace chamber door frameof wil make boiler& texmaco make boiler 47 dismatling of boiler dampers 48 fabrication of boiler dampers 49 erection of boiler dampers 50 repair of boiler dampers 51 repair ofid fanofwil and texmaco make boiler 52 repair offd fanofwil and texmaco make boiler 53 dismantling, fabrication and erection of boiler bagasse feeding ms chute between boiler furnance and rbc chain 54 patch work 55 dis, feb, & errection of boiler flue gas ducting between fd fan, id fan& chimney. 56 dismantling, fabrication & erection of bend of boiler flue gas ducting between id fan and chimney from 6 / 8mm thick plate. 57 dismantling, fabrication & erection of side plate & top plates ( 4mm ) of boilers. 58 dismantling, fabrication & erection economiser top & side plates 59 dismantling, fabrication & erection air heatertop & side plates 60 dismantling and fitting of gi / acc sheet. a ) dismantling 61 b ) fitting 62 dismantling of machinery structure. 63 fabrication and erection of machinery structure. 64 dismantling & erection of fd fan casing 65 fabrication of fd fan casing 66 repair of fd fan casing 67 dismantling & erection of id fan casing 68 fabrication of id fan casing 69 repair of id fan casing 70 dismantling, fabrication & erection ( a ) pump and motor bed 71 b ) motor and radicon 72 c ) cutter motor bed 73 dismantling fabrication and erection ofwet scrubber cone 74 dismantling fabrication and erection ofwet scrubber side plates 75 dismantling fabrication and erection ofclarifier cone of boiler 76 dismantling fabrication and erection ofman hole 77 dismantling fabrication and erection ofman hole blind 78 dismantling of sieve plate of boiler no. 3 wet scrubber 79 fabrication of sieve plate of boiler no. 3 wet scrubber 80 drilling of sieve plate of boiler no. 3 wet scrubber 81 erection of sieve plate of boiler no. 3 wet scrubber 82 dismantling , fabrication and erection ofboiler no. 3 chimney ( top portion up to 18 20 mtr ) 83 repair and strenthing of the boiler no. 1 & 2 chimney 84 dismantling of boiler no. 3 air heater tubes 85 fabrication and erection of boiler no. 3 air heater tubes 86 erection of boiler no. 3 air heater tubes 87 dismantling air heater tube plate ( top and bottom ) 88 fabrication air heater tube plate ( top and bottom ) 89 drilling air heater tube plate ( top and bottom ) 90 erection air heater tube plate ( top and bottom ) 91 dismantling air heater centre tube plate 92 fabrication air heater centre tube plate 93 drilling air heater centre tube plate 94 erection air heater centre tube plate 95 fabrications mill roller bearing cover 96 dismantling of structure 97 fabrication of structure 98 erection of structure 99 dismantling of platform plates 100 fabrication of platform plates 101 erection of platform plates 102 dismantlingofrailing 103 fabrication & erection of railing 104 power house fabrication & erection of cable tray 105 replacement ofthimble ( any size ) 106 checking of cable connections, cleaning of thimbles and reconnection 107 replacement of switches / mccb 630 amp / 400amp / 250 amp 108 replacement / erection of changeover switch 630amp / 400amp / 250 amp 109 overhauling of spareelectricalmotorsa ) 0 50 hp 110 b ) above 50 hp 111 c ) three speed motors 112 d ) 150 hp motor 01 no. 113 e ) unloader motor 15 hp 02 nos. 114 f ) four speed motor 04 nos. 115 laying & connection of power & control cables from main panels to remote box and motor 03 no. jobs 116 dismantling of existing three speed electrical panel 117 erection of new four speed panel 118 a. extensionjuice tray of mill no. 1 119 b. extension juice tray of mill no. 2 120 fabrication and erection ofms stairs with railing 121 mill pinion guard ( bottom ) 122 open gear guard ( bottom ) of all chain 123 fabrication ofmotor protection cover 124 fabrication of shed ( any size ) with structure 125 repair of dsm screen 126 dismantling and erection of dsm screen 127 civil foundationrepair along with alignment of transmission gear bed of mill no. 4 128 repair offmg oil tank leakage 129 dismantling of m.s. round / squaretanks 130 fabrication of m.s. round square tanks 131 erection of m s round / square tanks 132 dismantling of m.s. / g.i. / c.i. / ss / rmp pipe from 1” to 12” dia 133 erect ion of ms / gi / ci / ss / rmp pipe 1” to 12” dia 134 fabrication of m s / ss pipe line above 12” dia from m.s. / ssplate 135 dismantling of m.s. / ss / c.i. pipe line above12” dia 136 erection of m.s. / c.ipipe line above 12” dia 137 a ) dismantling of nipple 1” to 12” dia up to 24” length 138 b ) fabrication of nipple 1” to 12” ø & up to 24” length 139 c ) erection of nipple 1” to 12”dia & up to24” length 140 a ) dismantling of nipple above 12” dia up to 1 mtr. length 141 b ) fabrication of nipple above 12” dia up to 1 mtr. length 142 c ) erection of nipple above 12” dia up to 1 mtr. length 143 a ) dismantling of bend 1” to 12” dia 144 b ) fabrication of bend 1” to 12” dia 145 c ) erection of bend 1” to 12” dia 146 dismantling , fabrication & erection of bend above 12” below 36” dia 147 dismantling of reducer / tee1” to 12” dia & up to 24” length 148 a ) dismantling of blind 1” to 12” dia 149 b ) fabrication of blind 1” to 12” dia 150 c ) erection of blind 1” to 12” dia 151 a ) dismantling ofabove12” dia 152 b ) fabrication of blind above 12”dia 153 c ) erection of blind above 12” dia 154 a ) dismantling of valve 1” to 12” dia 155 b ) erection of valves 1” to 12” dia 156 c ) dismantling of valve above 12” dia 157 d ) erection of valvesabove 12” dia 158 a ) dismantling of flange 1” to 12” dia 159 b ) fabrication of flange 1” to 12” dia 160 c ) erection of flange above 12” dia 161 dismantling, fabrication & fitting of jet box in m.s. material 162 dismantling, fabrication, fitting of jet box in s smaterial 163 dismantling, fabrication & fitting of nipples 8” to 10” dia for jet box of condenser 164 a ) fabrication of vapour pipe bend 36” to 40” dia 165 b ) dismantling & erection of vapour pipe bend 36” to 40” dia 166 dismantling and erection of existing syrup / molasses / magma pipe lines for their internal / external cleaning. 167 a ) dismantling of vapour pipe 900 mm / 1000 mm dia 168 b ) fabrication of vapour pipe 900 / 1000 mm dia 169 c ) erection of vapour pipe 900 / 1000 mm dia 170 dismantling, fabrication & erection of save all from 10 mm to 12mm platea ) pan 171 b ) quad& vapour cell 172 dismantling, fabrication & erection of save all from 8mm to 10mm ms plate excluding outer shell 173 replacement of j pipe in vapour cell / quad body / pan 174 dismantling, fabrication & erection of umbrellaa ) pan 175 b ) quad& vapour cell 176 dismantling, fabrication & erection of bottom and top cone a ) pan 177 b ) quad & vapour cell 178 c ) juice sulphiter / syrupsulphiterand cone of any other units above 12” dia 179 dismantlingof inter connecting square box for juice heater double beat valve and fabrication, erection with pipe ( modify ) 180 a ) replacement of cooling jacket for the sulphur burning chamber. 181 b ) replacementof sulphur furnace coolingscrubber complete withinternal8” cooling jacket, 6” gas pipe and 4” cooling pipe 182 c ) dismantling, fabrication & erection of cooler made from 8” dia pipe for sulphur furnace 183 dismantling, fabrication & erection of sulphur burning chamber of sulphur furnace 184 dismantling, fabrication & erection of sulphur melt tank 185 dismantling, fabrication & erection of coil for sulphur melter 186 1. lime hopper: fabrication& erection along with connecting valves &pipeswith its drive system etc. 187 2. lifting of lime slacker along with connecting parts up to 2 ft. height suitable for fitting lime hopper. 188 dismantling, fabrication&erection of condenser of vacuum filter 189 dismantling, fabrication & erection of vacuum filtera ) mud trough 190 b ) abgitator 191 replacement of vacuum filter drum complete including connected accessoriesa ) dismantling of existing rvf drum and to be shifted at scrap yard. 192 b ) new rvf drum to be erected at position including connected accessories etc. 193 1 ) dismantling, fabrication & erection of mud scroll / screw conveyor 194 2 ) dismantling, fabrication & erection of mud mixture 195 dismantling, fabrication & erection ofbagacillocyclone 196 dismantlingof angle valves / straight valve a ) size 450 mm to 700 mm 197 size 700 mm to 1000 mm 198 erectionof angle valves / straight valve a ) size 450 mm to 700 mm 199 size 700 mm to 1000 mm 200 patch work at boiling house and c / f house etc. 201 fabrication & erection of mud bootsfor dorr 202 a. replacement of clarifiercenter tube 203 b. replacement of ms scrapper arms of clarifier center tubes. 204 c. replacement of clarifier juice distribution plates 205 a ) replacement of clarifier bottom plate ( compartment ) 206 b ) dismantling, fabrication & erection of clarifier 207 coils in dorr / melter / centrifugal machines / steam coils etc: a ) dismantling 208 b ) fabrication 209 c ) erection 210 dismantling, fabrication and erection of semi kestner bottom nipple 24” dia 211 replacement of quad / vapour cell down take 212 replacement of pan down take 213 patch work of worn our portion of pan / evaporatorbody shell 214 patch work of save all of pan / evaporator bodies 215 patch work of umbrella of pan / evaporator bodies 216 a ) strengthing ofshell with coil type channel with cross by pipe / channel at two places of pan 217 b ) strengthing of umbrella of pan / evaporator bodies 218 dismantling, fabrication & erection of body shell a ) juice sulphitor 219 b ) evaporator bodies 220 c ) pans 221 dismantling, fabrication & erection of bottom / top taper portion ofa ) pans 222 b ) evaporator bodies 223 dismantling of ss tubes of a ) pans 224 b ) evaporator bodies 225 c ) juice heater 226 fitting of ss tubes and to be tested at80 psi hyd. pressure a ) pans 227 b ) evaporator bodies 228 c ) juice heater 229 a ) dismantling of s.s tube of semi kestner 230 b ) fitting of s.s tubes of semi kestner and to be tested 80 psi hyd. pressure 231 dismantling, fabrication and erection of shaft with arms of dry seed crystallizer / vacuum crystallizer. 232 dismantling, fabrication and erection of agitator arms of juice sulphitor / dry seed crystallizer / vacuum crystallizer. 233 replacement of ribbon type stirrer of air cooled crystallizer. 234 crystallizer central shaft with ribbon:a ) dismantling 235 b ) fabrication 236 c ) erection 237 dismantling, fabrication and erection of condensate bottle big size ( from 1.5mtr to 2.0mtr ) 238 dismantling, fabrication and erection of condensate bottle big size ( from 1.0mtr to 1.5mtr ) 239 dismantling, fabrication and erection of segment of pan shell 240 dismantling, fabrication and erection of complete pan shell including sight glass, man hole, provision of key sample, vacuum gauge, ammonia pipes , glass washing pipe, cold water lineconnections and other accessories connectedto body shell, umbrella including welding of m.s. angles for supports etc., top taper cone including connections of washing steam pipes etc., save all including j pipes etc, vapour pipe outletnipple of save all, feed pipe connections etc. 241 vacuum crystallizer / dry seed crystallizer ( i ) dismantling, fabrication & erection of complete shell ( including side plates ) along with dismantling, erection & alignment of complete drive system 242 dismantling, fabrication & erection of complete shell ( excluding vertical side plates ) 243 worm and worm wheel, gland housing of crystallizers: a ) dismantling and erection of existing worm and worm wheel, gear box, motor and alignment work of worm and worm wheel, gear box and motor for satisfactory trial. 244 b ) dismantling and erection of gland housing of crystallizer shaft. 245 s.s bend / tee / reducer / nipple / crossa ) dismantling 246 b ) fabrication 247 c ) erection 248 dismantling, fabrication & erection of manhole with neck flange cover 16” to 24” dia 249 cutting & strengthening of old material 250 dismantling, fabrication & erection of worn out feeding header of pans 251 dismantling, fabrication & erection of central tube with cooling coil ( shaft ) for water cooled crystallizer 40 tons 252 a ) dismantling, fabrication & erection of cooling pipe coil in the crystallizermadefrom 4” dia pipe 253 b ) patch work of crystallizer cooling shaft 254 coils fabricationof coil 255 dismantling & erection of coils 256 dismantling of existing condenser including their venture, tail pipe, bend etc. and thereafterinstallation ofefficient single entry new condensers including fabrication / erection of venture, tail pipe & bends etc. fabrication and erection of base frame and other associated fabrication & erection jobs. 257 dismantling, fabrication & erection of m.s.gutters. 258 replacement of c.i. cone ( venture ) of multijet condenser 259 dismantling c / f machine including water, steam connection and discharge chute 260 dismantling and erection of sugar grader of side plate including modification of structure. 261 hoppers a ) dismantling, fabrication & erection of deck piece & alignments of hopper 262 a ) dismantling, fabrication & erection of hopper piece from deck piece to end of hopper 263 b ) dismantling, fabrication & erection of hopper piece from deck piece to start of hopper including multi trays. 264 dismantling, fabrication & erection of hopper complete with deck piece and multi tray for hot / cold air blower. 265 magma mixera ) dismantling of magma mixer including shaft / arms / drive etc. 266 b ) fabrication of magma mixer including shaft / arms / drive etc. 267 c ) erection of magma mixer including shaft / arms / drive etc. 268 dismantling’ fabrication & erection of molasses gutter for centrifugal machines 269 dismantling and erection of existing syrup / molasses / magma pipe lines for their internal / external cleaning. 270 fabrication of bucket for sugar elevator / dry seed elevator 271 for spray pond a ) fabrication of ss pipe line up to 12” dia from 4 mm thick ss plate 272 a ) fabrication of ss cluster for fitting 2” sized pipes with nozzles ( as fitted in existing clusters ) . 273 threading in 2” dia ss pipe line for fitting nozzles 274 formation of purlin and structure at the height of 20 mtrs approx. with angle size 75x75x6mm and channel size 100x50x5 mm and 200x76x7.5 mm for the fitting of rooftop sheets 275 part b cutting and welding of boiler tubes for cleaning 276 cutting and welding ofheader capsfor cleaningof boiler tubes 277 seamless pipe ½’’to 8’’od & above ( various lengths ) a ) dismantling 278 b ) fabrication 279 c ) erection 280 seamless pipe nippleup to8’’od& above a ) dismantling 281 b ) fabrication 282 c ) erection 283 seamless pipe bendsup to8’’od& above a ) dismantling 284 b ) fabrication 285 c ) erection 286 dismantling, and erection of air heater tubes 63.5 mm od x 8 feet length 287 dismantling, and erection of air heater tubes 63.5 mm od x 16 feet length 288 cutting, welding and fitting ofair heaterold tubes 289 dismantling , fabrication and erection ofair heatercentre tube plate 290 dismantling , fabrication, drilling and erection ofair heatertop and bottom tube plate 291 ibr valveup to36’’oda ) dismantling 292 b ) erection 293 ibr flangea ) dismantling 294 b ) fabrication 295 c ) erection 296 ibr teea ) dismantling 297 b ) fabrication 298 c ) erection 299 reducera ) dismantling 300 b ) fabrication 301 c ) erection 302 boiler drum partition platesa ) dismantling 303 b ) fabrication 304 c ) erection 305 d ) repair 306 boiler drum water seprator a ) dismantling 307 b ) fabrication 308 c ) erection 309 d ) repair 310 boiler wet scrubber seive plate as per drawinga ) dismantling 311 b ) fabrication 312 c ) drilliing 313 d ) erection 314 ibr welding joint...

Department of Cooperation - Punjab

32288381 fabrication and erection jobs of batala csm 1 batala csm 2 mspipeline up to 10” dia.a ) dismantling 3 b ) fabrication 4 pipe line above 10” dia including vapour & exhaust pipe.a ) dismantling 5 b ) fabrication 6 c ) erection 7 seamlesspipeline up to 12” dia.a ) dismantling 8 b ) erection 9 seamlessbend up to 12” dia.a ) dismantling 10 b ) erection 11 cross, reducer, tee, nippleup to 12” dia :a ) dismantling 12 b ) fabrication 13 c ) erection 14 cross, reducer, tee, nippleabove 12” dia :a ) dismantling 15 b ) fabrication 16 c ) erection 17 valve up to12” dia : a ) dismantling 18 b ) erection 19 valve above12” dia : a ) dismantling 20 b ) erection 21 bend up to12” dia : a ) dismantling 22 b ) fabrication 23 c ) erection 24 bend above 12” dia : a ) dismantling 25 b ) fabrication 26 c ) erection 27 flange of all size a ) dismantling 28 b ) fabrication 29 c ) erection 30 square & round tanks with flat bottom of any size ;a ) dismantling 31 b ) fabrication 32 c ) erection 33 roof gutter for rain water from gi sheets. a ) dismantling 34 b ) fabrication 35 c ) erection 36 platform of any size .a ) dismantling 37 b ) fabrication 38 c ) erection 39 fabrication of ladder / stair case from angle / channel / flat / pipe plate. 40 trouses coloumn , beam related to roof. a ) dismantling 41 b ) fabrication 42 c ) erection 43 purlin . a ) dismantling 44 b ) erection 45 m.s. patch work max.up to 20 sq.ft at individual station ( above this will be taken in mt ) 46 dismantling and erection of 2” square bar / oldrail on cane unloader bridge 47 replacement of runnerflat of cc, rc, inter carrier, be, rbc, sugarseed elevator chain.& cross carrier.a ) dismantling 48 b ) fitting of new 49 replacement of angle / channel of cc, rc, intercarrier, be, rbc, sugar seed elevator chain.& cross carrier.a ) dismantling 50 b ) fitting of new 51 replacement side plate of cc, rc, be, rbc , hopper& cross carrier 52 replacement of bottom trough hopper, be, rc.rbc., cross carrier. 53 dismantling, fabrication and erection of donnelly chute of mills. 54 dismantling, fabrication & erection of any bed of motor , pump & gear boxa ) below 50 hp 55 b ) above 50 hp 56 replacement ofrack carrier boot. 57 m.s. screw conveyora ) fabrication 58 b ) erection 59 fabricationof racks of rack carrier, bagasse elevator 60 dismantling, fabrication & erection of juice gutter & juice tank boiler 61 replacement of worn out ducting. 62 replacement of boiler fans.a ) id 63 b ) fd 64 c ) sa 65 dismantling , fabrication & erectionof boiler id / fd fan damper 66 dismantling, fabrication and erection of worn out portion of wet scrubber. 67 dismantling, fabrication and erection of a ) clarifier cone. 68 b ) round portion 69 dismantling, fabrication and erection of bagasse fedder chute 70 replacement of worn out raw juice / sulphited juice pump. strainer. 71 replacement of worn out weight juice / water receiving tank. 72 down take of pan, quad & vapour cell from m.s. platea ) dismantling 73 b ) fabrication 74 c ) erection 75 m.s. scrubber of sulphur furnance.a ) dismantling 76 b ) fabrication 77 c ) erection along with connecting valve & pipes etc. 78 molasses conditionara ) dismantling 79 b ) fabrication 80 c ) erection 81 fabrication & erection of man hole with blind cover. 82 coil in dorr / melter / centrifugal machine / steam coils etc.a ) dismantling 83 b ) fabrication 84 c ) erection 85 replacement of foot valve of spray pump.a ) dismantling 86 b ) erection 87 s.s. bend / tee / reducer / nipple / cross.a ) dismantling 88 b ) fabrication 89 c ) erection 90 d ) fabrication & erection of all sizess.s. pipe from s.s. plate. 91 dismantling , fabrication & erection of condensate bottle of any size 92 replacement of pan body shell ( capacity 50 ton ) from tube plate calendria to saveall including its taper portion. 93 repair & strengting of main structure coloumn upto 1mtr..height 94 main structure column / beam upto 10 mtr. height.a ) dismantling 95 b ) fabrication 96 c ) erection 97 main structure column / beam above 10 mtr. height.a ) dismantling 98 b ) fabrication 99 c ) erection 100 replacement of compartment tray / mud boot of juice clarifier ( dorr ) .a ) dismantling 101 b ) fabrication 102 c ) erection 103 dismantling of crystallizer / pugmill arms. 104 fabrication of crystallizer / pugmill arms. 105 erection of crystallizer / pugmill arms. 106 fabrication & erection of sugar grader chute. 107 fabrication & erection of sugar elevator / seed chain bucket. 108 dismantling, fabrication & erection of hopper including alignement & trial. ( size : 44 x4.5 x 1 ) 109 dismantling, fabrication & erection of c / f machine internal liner plate. 110 replacement ofworn outof saveall ofevaporator bodies ( including inner shell, outer shell, impeller& top plate ) 111 replacement ofworn outof saveall of pans ( including inner shell, outer shell, impeller& top plate ) . 112 replacementof only impeller ofpans & quad 113 replacement of only top / bottom taperplate ofpans &quad 114 replacement of only umbrella ofpans / quad . 115 dismantling, fabrication & erection of j –pipe for saveall of any body. 116 replacement of tube plate ofany body of quad / pan. 117 fab. & erection ofside glass for pan / quad. 118 dismantling, fabrication & erection of condensate water receiving pocket for cylindria of pan and quad 119 replacement ofbrass / s.s tubes ofjuice heater / vapour line juice heater a ) dismantling 120 b ) fitting 121 replacement ofbrass / s.s tubes ofquad / vapour cell & pan station..a ) dismantling 122 b ) fitting 123 replacement ofjh partition plate . 124 replacement of worn out groove out partition plate 125 replacement of coils in dorr 126 dismantling, fabrication & erection of bagacillo cyclone. 127 replacementofworn out bagacillo pipeline made out from gi plain sheet 128 dismantling, fabrication & erection of agitator of oc filter. 129 dismantling, fabrication & erection of bottom portion of oc filter / crystallizer. 130 impeller ofbagacillo blowera ) dismantling 131 b ) fabrication 132 c ) erection with drive system complete 133 m s casing ofbagacillo blowera ) dismantling 134 b ) fabrication 135 c ) erection 136 bagacilloscreen :a ) dismantling 137 b ) replacement ofnew screen & erection. 138 c ) fabrication frame 139 replacement of cooler of sulphur burners. 140 replacement ofsulphur cooler burner pipeline. 141 replacement of worn outburner of sulphur furnace. 142 dismantling, fabrication & erection of sulphur burner melter for sulphur furnace. 143 crystallizer central shaft with ribbona ) dismantling 144 b ) fabrication 145 c ) erection 146 m.s ribbon strip in crystallzera ) dismantling 147 b ) fabrication 148 c ) erection 149 replacement of worm &worm wheelfor crystallizer 150 replacement of hopper trough. 151 dismantling, fabrication & erection of batch typec / f machine discharge chute. 152 dismantling & erection of m.s / ci / s.s cluster with nozzle. 153 dismantling, fabrication & erection of spray pump strainer. 154 fabrication & erection of street light four pole tower with suitable platfram & painting appx. height 30 ft 155 dismantling & erection of flow meter. 156 dismantling, fabrication & erection of sulphur furnance chamber. 157 dismantling, fabrication & erection of cutter hood. 158 fabrication & erection of any shed ( from old m.s tube / angle ) up to 5mtr.height. 159 dismantling & erection of big valve ( above 900mm ) in exhaust & vapour pipe line / header etc 160 dismantling, fabrication & erection of m.s. gutter for massecuite & syrup....

Cooperative Sugar Mills Societies - Punjab

32246792 contract jobs (1) repair and maintenance of thermax make high pressure boiler (steam pressure 32 km/cm2) (2) repair of cane unloader (3) dismantling, cleaning and assembly of cane carrier chain (4) mill head stock wear plate & key way fitting (5) repair of quad & juice heater section (6) repair of pan station & crystallizer section (7) repair of ci sluice valves (8) dynamic balancing of c/f machines & various equipment (9) overhauling service and alignment of triveni” make turbines (10) electrical contract jobs 8 motor rewinding jobs (11) ultrasonic testing of various equipment (12) civil contract jobs (13) contract jobs of engineering & manufacturing departments (14) insulation contract job (15) chemical cleaning of boilers....

Department of Cooperation - Punjab

28402506 contract jobs of dismantling, fabrication and erection for the year 2021 22 2 dismentling of m.s. pipe, 1: to 12 dia 3 erection of m.s. pipe 1 to 12 dia 4 fabrication of m.s. pipe line above 12 dia from m.s. plate 5 dismentling of m.s. pipe line above 12 dia 6 erection of m.s. pipe line above 12 dia 7 fabrication of s.s. pipe line 6 to 24 dia from s.s.plate 8 dismentling of s.s. pipe line 6 to 24 dia 9 erection of s.s. pipe line 6 to 24 dia from s.s. plate 10 dismentling of nipple 1 to 12 dia 11 fabrication of nipple 1 to 12 dia 12 erection of nipple 1 to 12 dia 13 dismentling of nipple above 12 dia 14 fabrication of nipple above 12 dia 15 erection of nipple abvoe 12 dia 16 dismentling of bend 1 to 12 dia 17 fabrication of bend 1 to 12 dia 18 erection of bend 1 to 12 dia 19 dismentling, farbication and erection of bend above 12 dia 20 dismentling of reducer / tee 1 to 12 dia 21 fabrication and erection of reducer / tee 1 to 12 dia 22 dismentling of valve 1 to 12 dia 23 erection of valve 1 to 12 dia 24 dismentling of valve above 12 dia 25 erection of valve above 12 dia 26 cutting and fitting of old flanged / blind 1 and above 27 dismantling fabrication and erection of plateform 28 dismantling fabrication and erection of railing 29 replacement of worn out bottom plate of molasses / syrup storage tank 4 sq mtr area approx 30 fabrication of vapour pipe bend 36 to 40 dia 31 dismentling and erection of vapour pipe bend 36 to 40 dia 32 dismentling fabrication and erection of complete umbrella of quad body 33 dismentling fabrication and erection of complete umbrella of pan 34 dismentling fabrication and erection of strainers 35 dismentling fabrication and erection of foundation bed of any type of pumps 36 dismentling of vapour pipe 900 mm / 1000 mm dia 37 fabrication of vapour pipe 900mm / 1000mm dia 38 erection of vapour pipe 900 / 1000 mm dia 39 dismentling fabrication and erection of save all of pans / quads from 8mm to 12mm m.s. plate 40 dismentling fabrication and erection of top cover of save all of pan and quad 41 dismentling fabrication and erection of outer shell of save all of pan and quad 42 dismentling fabrication and erection of inner portion of save all of pan and quad 43 replacement of j pipe in vapour cell / quad body / fan 44 dismentling, farbication and erection of rectangular coil of molasses tank 45 patch work of save all of pan / evaporator bodies 46 patch work of umbralla of pan / evaporator bodies 47 stengthing of umbrella of pan / evaporator bodies 48 dismentling fabrication and erection of complete broken arms of dry seed crystallizer of similar other crystallizers 49 dismentling fabrication and erection of wornout shaft of crystallizer 50 fabrication and erection of distributor in down take of pans 51 replacement of bottom compartment grooves for fitting of rubber strips of juice heaters h.s.a 120m2 52 erection of super heater at centrifugal machine with all existing connections 53 dismentling erection of transient heater with all existing connections 54 dismantling fabrication and erection of injection header size800mm dia 16m long with 10mm plate 55 dismantling of pan body shell from calendria to top cone ( 40 ton ) capacity 56 fabrication and erection of pan body shell from calendria to top cone ( 40 ton ) capacity 57 dismentling, fabrication and erection of top cone of pans 58 replacement of flat / runner side plates ms railing & square bar etc. 59 replacement of runner along with supporting angle / channel for cane carrier chain / rbc / inter carrier chain 60 dismantling fabrication erection of ms plate of cane carrier side plates with supports 61 fabrication & fitting of platform from old scrap material 62 dismantling & erection of ibr pipeline above 6 dia 63 dismantling and erection of ibr valve upto 6” dia 64 dismantling & erection of ibr bends / reducers / nipple upto 6” dia 65 dismantling and erection of ibr valve upto 6” dia 66 fabrication and erection of flanged end observation / cleaning doors for economiser of boiler no. 2 67 dismantling, fabrication , erection of boiler no.2 id fan suction bend of flue gas ducting 68 patchwork of wet scrubber casing / ducting / bottom cone / clarifier 69 dismantling, fabrication erection of fd hot air ducting above furnace area of boiler no.2 with supports / damper , size 16 inch sq. , approx. length 50 feet 70 dismantling, fabrication erection of fd hot air ducting near air heater ash hopper of boiler no. 1 and no.2 with fitting of supports / damper 71 replacement of rbc bottom trough plate etc. 72 dismantling shifting refitting of id fan no. 1 from outside to inside on old foundation 73 fabrication and fitting of id fan suction bend for boiler no.1 74 dismantling and fitting of existing id fan delivery duct from id fan to wet scrubber along with supports etc for boiler no.1 75 patch work of outer front ms plate of chamber near bagasse feeder boiler no. 1 and 2 76 dismantling , fabrication and erection of ms ducting from wet scrubber outlet to chimney for boiler no. 2 77 dismantling , fabrication and erection of ms ducting one meter long at suction of wet scrubber for boiler no. 2 78 dismantling, cleaning, testing, painting and refitting of gilled type economiser elements. no. of elements are 48 no.s. hydraulic test also to be done after fitting of all elements. 79 dismantling, fabrication and erection of perforated plate of wet scrubber for boiler no.1 &2 80 fabrication and erection of staircase at cane unloader along with railing, platform etc. 81 dismentling, fabrication and erection of broken arm / ribbon of any crystalizer 82 replacement of old brass / ss tubes of with new ss tubes of second body of quad by dismantling, fitting and expansion of tubes, ( approx. quantity of tubes : 1100 no.s ) hydraulic testing after replacement of tubes 83 replacement of old brass / ss tubes of with new ss tubes of quad / vapour cell ( other than second body of quod ) by dismantling, fitting and expension of tubes 84 replacement of ss tube of juice heaters / vljh by dismantling, fitting and expension of tubes 85 replacement of brass / ss tube of any pan by dismantling, fitting and expension of tubes...

Department of Cooperation - Punjab

28066400 contract jobs of dismantling, fabrication and erection for the year 2021 22 1 contract jobs of dismentaling, fabrication and erection 2 dismentling of m.s. pipe, 1: to 12 dia 3 erection of m.s. pipe 1 to 12 dia 4 fabrication of m.s. pipe line above 12 dia from m.s. plate 5 dismentling of m.s. pipe line above 12 dia 6 erection of m.s. pipe line above 12 dia 7 fabrication of s.s. pipe line 6 to 24 dia from s.s.plate 8 dismentling of s.s. pipe line 6 to 24 dia 9 erection of s.s. pipe line 6 to 24 dia from s.s. plate 10 dismentling of nipple 1 to 12 dia 11 fabrication of nipple 1 to 12 dia 12 erection of nipple 1 to 12 dia 13 dismentling of nipple above 12 dia 14 fabrication of nipple above 12 dia 15 erection of nipple abvoe 12 dia 16 dismentling of bend 1 to 12 dia 17 fabrication of bend 1 to 12 dia 18 erection of bend 1 to 12 dia 19 dismentling, farbication and erection of bend above 12 dia 20 dismentling of reducer / tee 1 to 12 dia 21 fabrication and erection of reducer / tee 1 to 12 dia 22 dismentling of valve 1 to 12 dia 23 erection of valve 1 to 12 dia 24 dismentling of valve above 12 dia 25 erection of valve above 12 dia 26 cutting and fitting of old flanged / blind 1 and above 27 dismantling fabrication and erection of plateform 28 dismantling fabrication and erection of railing 29 replacement of worn out bottom plate of molasses / syrup storage tank 4 sq mtr area approx 30 fabrication of vapour pipe bend 36 to 40 dia 31 dismentling and erection of vapour pipe bend 36 to 40 dia 32 dismentling fabrication and erection of complete umbrella of quad body 33 dismentling fabrication and erection of complete umbrella of pan 34 dismentling fabrication and erection of strainers 35 dismentling fabrication and erection of foundation bed of any type of pumps 36 dismentling of vapour pipe 900 mm / 1000 mm dia 37 fabrication of vapour pipe 900mm / 1000mm dia 38 erection of vapour pipe 900 / 1000 mm dia 39 dismentling fabrication and erection of save all of pans / quads from 8mm to 12mm m.s. plate 40 dismentling fabrication and erection of top cover of save all of pan and quad 41 dismentling fabrication and erection of outer shell of save all of pan and quad 42 dismentling fabrication and erection of inner portion of save all of pan and quad 43 replacement of j pipe in vapour cell / quad body / fan 44 dismentling, farbication and erection of rectangular coil of molasses tank 45 patch work of save all of pan / evaporator bodies 46 patch work of umbralla of pan / evaporator bodies 47 stengthing of umbrella of pan / evaporator bodies 48 dismentling fabrication and erection of complete broken arms of dry seed crystallizer of similar other crystallizers 49 dismentling fabrication and erection of wornout shaft of crystallizer 50 fabrication and erection of distributor in down take of pans 51 replacement of bottom compartment grooves for fitting of rubber strips of juice heaters h.s.a 120m2 52 erection of super heater at centrifugal machine with all existing connections 53 dismentling erection of transient heater with all existing connections 54 dismantling fabrication and erection of injection header size800mm dia 16m long with 10mm plate 55 dismantling of pan body shell from calendria to top cone ( 40 ton ) capacity 56 fabrication and erection of pan body shell from calendria to top cone ( 40 ton ) capacity 57 dismentling, fabrication and erection of top cone of pans 58 replacement of flat / runner side plates ms railing & square bar etc. 59 replacement of runner along with supporting angle / channel for cane carrier chain / rbc / inter carrier chain 60 dismantling fabrication erection of ms plate of cane carrier side plates with supports 61 fabrication & fitting of platform from old scrap material 62 dismantling & erection of ibr pipeline above 6 dia 63 dismantling and erection of ibr valve upto 6” dia 64 dismantling & erection of ibr bends / reducers / nipple upto 6” dia 65 dismantling and erection of ibr valve upto 6” dia 66 fabrication and erection of flanged end observation / cleaning doors for economiser of boiler no. 2 67 dismantling, fabrication , erection of boiler no.2 id fan suction bend of flue gas ducting 68 patchwork of wet scrubber casing / ducting / bottom cone / clarifier 69 dismantling, fabrication erection of fd hot air ducting above furnace area of boiler no.2 with supports / damper , size 16 inch sq. , approx. length 50 feet 70 dismantling, fabrication erection of fd hot air ducting near air heater ash hopper of boiler no. 1 and no.2 with fitting of supports / damper 71 replacement of rbc bottom trough plate etc. 72 dismantling shifting refitting of id fan no. 1 from outside to inside on old foundation 73 fabrication and fitting of id fan suction bend for boiler no.1 74 dismantling and fitting of existing id fan delivery duct from id fan to wet scrubber along with supports etc for boiler no.1 75 patch work of outer front ms plate of chamber near bagasse feeder boiler no. 1 and 2 76 dismantling , fabrication and erection of ms ducting from wet scrubber outlet to chimney for boiler no. 2 77 dismantling , fabrication and erection of ms ducting one meter long at suction of wet scrubber for boiler no. 2 78 dismantling, cleaning, testing, painting and refitting of gilled type economiser elements. no. of elements are 48 no.s. hydraulic test also to be done after fitting of all elements. 79 dismantling, fabrication and erection of perforated plate of wet scrubber for boiler no.1 &2 80 fabrication and erection of staircase at cane unloader along with railing, platform etc. 81 dismentling, fabrication and erection of broken arm / ribbon of any crystalizer 82 replacement of old brass / ss tubes of with new ss tubes of second body of quad by dismantling, fitting and expansion of tubes, ( approx. quantity of tubes : 1100 no.s ) hydraulic testing after replacement of tubes 83 replacement of old brass / ss tubes of with new ss tubes of quad / vapour cell ( other than second body of quod ) by dismantling, fitting and expension of tubes 84 replacement of ss tube of juice heaters / vljh by dismantling, fitting and expension of tubes 85 replacement of brass / ss tube of any pan by dismantling, fitting and expension of tubes...

Department of Cooperation - Punjab

27910822 fabrication and erection jobs 1 repair of cane unloader grab arms 2 replacement of sq. bar of cane unloader. 3 fabrication & erection of hydraulic grab of unloader complete. 4 dismantling, fabrication and erection of a ) mincer hood 5 b ) cutter hood 6 c ) chopper hood 7 replacement of cane cutting knives of cutters 8 replacement of cane cutting knives of mincer 9 replacement of hammers of mincer 10 replacement of domite tips of mincer 11 to build mill top rollers square end as per standard size 12 to build mill rollers crown pinion teeth as per standard template of teeth. 13 to build mill rollers coupling square section as per standard size 14 to build mill rollers journal as per standard size 15 to build mill under feeder rollers drive gear teeth as per standard template of teeth 16 fabrication and erection of mill rollers crown pinion guard 17 fabrication and erection of donnelly chute of mills 18 dismantling, fabrication and erection of worn out juice tray at mill house from 10 / 12 mm plate 19 dis. feb. & erection of mill house screw conveyor 20 dis. feb. & erection of mill house screw conveyor trough along with dismantling and fitting of conveyor and drive system. 21 dismantling and erection of worn out runners of cane carrier, rbc, bagasse elevator and inter carrier. 22 dismantling, fabrication and erection of worn out side plates of cane carrier, rbc, bagasse elevator and inter carrier. 23 dismantling, fabrication and erection of worn out trough of rbc, bagasse elevator & rack carriers from a ) ms plate 6 / 8 mm 24 b ) ss plate 4 / 5 mm 25 dismantling fabrication and erection structure of cane carrier drive , rbc chain drive, rake carrier and elevator chain drive 26 replacement of worn out bottom boot of intercarrier chain / secondary chain 27 replacement of angle and channel of cane carrier / rbc / rack carrier & elevator . 28 repair of secondary cane carrier chain and elevator chain rake 29 fabrication of secondary cane carrier chain and elevator chain rake 30 fabrication of rbc slates 31 repair of rbc slates 32 dis. and erection of bagassecillow blower 33 fabrication of bagassecillow blower 34 dismantling and erection of boiler bagasse feeding ci furnace mouth piece of wil make boiler. 35 dismantling and erection of boiler bagasse feeding ci furnace chute 36 replacement of furnace door frame of wil make boiler & texmaco make boiler 37 replacement of furnace door of wil make boiler & texmaco make boiler 38 repair and fitting of furnace door frame of wil make boiler& texmaco make boiler 39 repair and fitting of furnace door of wil make boiler& texmaco make boiler 40 replacement of furnace chamber door frame of wil make boiler & texmaco make boiler 41 replacement of furnace chamber door of wil make boiler & texmaco make boiler 42 repair and fitting of furnace chamber door of wil make boiler& texmaco make boiler 43 repair and fitting of furnace chamber door frame of wil make boiler& texmaco make boiler 44 dismatling of boiler dampers 45 dismatling of boiler dampers 46 dismatling of boiler dampers 47 dismatling of boiler dampers 48 repair of id fan of wil and texmaco make boiler 49 repair of fd fan of wil and texmaco make boiler 50 dismantling, fabrication and erection of boiler bagasse feeding ms chute between boiler furnance and rbc chain 51 patch work 52 dis, feb, & errection of boiler flue gas ducting between fd fan, id fan& chimney. 53 dismantling, fabrication & erection of bend of boiler flue gas ducting between id fan and chimney from 6 / 8mm thick plate. 54 dismantling, fabrication & erection of side plate & top plates ( 4mm ) of boilers. 55 dismantling, fabrication & erection economiser top & side plates 56 dismantling, fabrication & erection air heater top & side plates 57 dismantling and fitting of gi / acc sheet. a ) dismantling 58 b ) fitting 59 dismantling of machinery structure. 60 fabrication and erection of machinery structure. 61 dismantling & erection of fd fan casing 62 fabrication of fd fan casing 63 repair of fd fan casing 64 dismantling & erection of id fan casing 65 fabrication of id fan casing 66 repair of id fan casing 67 dismantling, fabrication & erection ( a ) pump and motor bed 68 b ) motor and radicon 69 c ) cutter motor bed 70 dismantling fabrication and erection of wet scrubber cone 71 dismantling fabrication and erection of wet scrubber side plates 72 dismantling fabrication and erection of clarifier cone of boiler 73 dismantling fabrication and erection of man hole 74 dismantling fabrication and erection of man hole blind 75 fabrications mill roller bearing cover 76 dismantling of structure 77 fabrication of structure 78 erection of structure 79 disnatling of platforms plates 80 fabrication platforms plates 81 erection of platforms plates 82 dismantling of railing 83 fabrication & erection of railing 84 a ) dismantling, loading & shifting of following material from zira sugar mill 1.mill reversing redicon with motor 01 set 85 2.mill reversing redicon with motor 01 set 86 3. gun metal liner 10 nos 87 4.ibr valves ( different sizes ) 20 nos. 88 5. batch type centrifugal machine ( 1 ton ) with motor, structure and panel 02 set 89 6. head and tail shaft with plummer block and sprocket a ) cane carrier 01 set 90 b ) secondary carrier 01 set 91 c ) bagasse elevator 01 set 92 d ) rbc 01 set 93 7. m.s structure ( angle, channel, beam ) 10 tons 94 8. seamless pipe ( different sizes ) 150 mtrs 95 9. exhaust / vapour pipe line ( different sizes ) 100 mtrs 96 10. cane carrier, rbc runner with channel 250 mtrs 97 11. chequered plate 04 tons 98 12. bagacillo blower with motor 01 no. 99 13.alternator ( 2.5 mw ) radiator 03 nos. 100 14.turbine cooler 1.5 mw 02 nos. 101 15.mill turbine cooler 01 no. 102 16.bagasse feeder with radicon and motor 03 sets 103 b ) loading & shifting of following material from zira sugar mill a ) air circuit breaker 600a / 800a 03 nos. 104 b ) submersible pump with motor 02 nos 105 c ) feed pump 65 / 6 01 no. 106 d ) welding set 03 nos. 107 e ) vacuum pump 01 no. 108 f ) mccb 60a / 800 amp 02 nos. 109 g ) hrc fuse of different sizes 100 nos. 110 h ) motors a. 15 hp 1440 rpm 02 nos. 111 b. 20 hp 960 rpm 02 nos. 112 c. 20 hp 1440 rpm 02 nos. 113 d. 50 hp 960 rpm 01 no. 114 c ) dismantling, loading & shifting of following material from bhougpur sugar mill 1. centrifugal machine with motor structure & panel – 01 set 115 2. condenser 03 nos. 116 3. megma pump & vacumm pump – 02 nos 117 4. continuous machine with motor, panel and structure 02 nos. 118 power house 1.fabrication & erection of cable tray 119 2.replacement of thimble ( any size ) 120 3.checking of cable connections, cleaning of thimbles and reconnection 121 4.replacement of switches / mccb 630 amp / 400amp / 250 amp 122 5.replacement / erection of changeover switch 630amp / 400amp / 250 amp 123 6 ) overhauling of spare electrical motors a ) 0 50 hp 124 b ) above 50 hp 125 c ) three speed motors 126 d ) 150 hp motor 01 no. 127 e ) unloader motor 15 hp 02 nos. 128 f ) four speed motor 04 nos. 129 7. laying & connection of power & control cables from main panels to remote box and motor 03 no. jobs 130 8.dismantling of existing three speed electrical panel 131 9.erection of new four speed panel 132 a. extension juice tray of mill no. 1 133 b. extension juice tray of mill no. 2 134 fabrication and erection of ms stairs with railing 135 fabrication & fitting of stationary knives structure with knives 136 mill pinion guard ( bottom ) 137 open gear guard ( bottom ) of all chain 138 fabrication of motor protection cover 139 fabrication of shed ( any size ) with structure 140 repair of dsm screen 141 dismantling and refitting of mill no. 1 head stock after repair of foundation and supporting of base plate ( civil work done by mill 142 rcc drilling between mill no 1 & 2 143 fabrication and erection of ms box additional supporting between mill no – 1 head stock with mill no 2 head stock 144 repair of fmg oil tank leakage 145 dismantling of m.s. round / square tanks 146 fabrication of m.s. round square tanks 147 erection of m s round / square tanks 148 dismantling of m.s. / g.i. / c.i. / ss / rmp pipe from 1” to 12” dia 149 erect ion of ms / gi / ci / ss / rmp pipe 1” to 12” dia 150 fabrication of m s / ss pipe line above 12” dia from m.s. / ss plate 151 dismantling of m.s. / ss / c.i. pipe line above 12” dia 152 erection of m.s. / c.i pipe line above 12” dia 153 a ) dismantling of nipple 1” to 12” dia up to 24” length 154 b ) fabrication of nipple 1” to 12” ø & up to 24” length 155 c ) erection of nipple 1” to 12”dia & up to 24” length 156 a ) dismantling of nipple above 12” dia up to 1 mtr. length 157 b ) fabrication of nipple above 12” dia up to 1 mtr. length 158 c ) erection of nipple above 12” dia up to 1 mtr. length 159 a ) dismantling of bend 1” to 12” dia 160 b ) fabrication of bend 1” to 12” dia 161 c ) erection of bend 1” to 12” dia 162 dismantling , fabrication & erection of bend above 12” below 36” dia 163 dismantling of reducer / tee 1” to 12” dia & up to 24” length 164 a ) dismantling of blind 1” to 12” dia 165 b ) fabrication of blind 1” to 12” dia 166 c ) erection of blind 1” to 12” dia 167 a ) dismantling of above12” dia 168 b ) fabrication of blind above 12”dia 169 c ) erection of blind above 12” dia 170 a ) dismantling of valve 1” to 12” dia 171 b ) erection of valves 1” to 12” dia 172 c ) dismantling of valve above 12” dia 173 d ) erection of valves above 12” dia 174 a ) dismantling of flange 1” to 12” dia 175 b ) fabrication of flange 1” to 12” dia 176 c ) erection of valve above 12” dia 177 dismantling, fabrication & fitting of jet box in m.s. material 178 dismantling, fabrication, fitting of jet box in s s material 179 dismantling, fabrication & fitting of nipples 8” to 10” dia for jet box of condenser 180 a ) fabrication of vapour pipe bend 36” to 40” dia 181 b ) dismantling & erection of vapour pipe bend 36” to 40” dia 182 erection of m s round / square tanks 183 dismantling and erection of existing syrup / molasses / magma pipe lines for their internal / external cleaning. 184 a ) dismantling of vapour pipe 900 mm / 1000 mm dia 185 b ) fabrication of vapour pipe 900 / 1000 mm dia 186 c ) erection of vapour pipe 900 / 1000 mm dia 187 dismantling, fabrication & erection of save all from 10 mm to 12mm plate a ) pan 188 b ) quad & vapour cell 189 dismantling, fabrication & erection of save all from 8mm to 10mm ms plate excluding outer shell 190 replacement of j pipe in vapour cell / quad body / pan 191 dismantling, fabrication & erection of umbrella a ) pan 192 b ) quad & vapour cell 193 dismantling, fabrication & erection of bottom and top cone a ) pan 194 b ) quad & vapour cell 195 c ) juice sulphiter / syrup sulphiter and cone of any other units above 12” dia 196 dismantling of inter connecting square box for juice heater double beat valve and fabrication, erection with pipe ( modify ) 197 a ) replacement of cooling jacket for the sulphur burning chamber. 198 b ) replacement of sulphur furnace cooling scrubber complete with internal 8” cooling jacket, 6” gas pipe and 4” cooling pipe 199 c ) dismantling, fabrication & erection of cooler made from 8” dia pipe for sulphur furnace 200 dismantling, fabrication & erection of sulphur burning chamber of sulphur furnace 201 dismantling, fabrication & erection of sulphur melt tank 202 dismantling, fabrication & erection of coil for sulphur melter 203 1. lime hopper: fabrication & erection along with connecting valves &pipes with its drive system etc. 204 2. lifting of lime slacker along with connecting parts up to 2 ft. height suitable for fitting lime hopper. 205 dismantling, fabrication & erection of condenser of vacuum filter 206 dismantling, fabrication & erection of vacuum filter a ) mud trough 207 b ) abgitator 208 replacement of vacuum filter drum complete including connected accessories a ) dismantling of existing rvf drum and to be shifted at scrap yard. 209 b ) new rvf drum to be erected at position including connected accessories etc. 210 1 ) dismantling, fabrication & erection of mud scroll / screw conveyor 211 2 ) dismantling, fabrication & erection of mud mixture 212 dismantling, fabrication & erection of bagacillo cyclone 213 dismantling of angle valves / straight valve a ) size 450 mm to 700 mm 214 size 700 mm to 1000 mm 215 erection of angle valves / straight valve a ) size 450 mm to 700 mm 216 size 700 mm to 1000 mm 217 patch work at boiling house and c / f house etc. 218 fabrication & erection of mud boots for dorr 219 a. replacement of clarifier center tube 220 b. replacement of ms scrapper arms of clarifier center tubes. 221 c. replacement of clarifier juice distribution plates 222 a ) replacement of clarifier bottom plate ( compartment ) 223 b ) dismantling, fabrication & erection of clarifier 224 coils in dorr / melter / centrifugal machines / steam coils etc: a ) dismantling 225 b ) fabrication 226 c ) erection 227 dismantling, fabrication and erection of semi kestner bottom nipple 24” dia 228 replacement of quad / vapour cell down take 229 replacement of pan down take 230 patch work of worn our portion of pan / evaporator body shell 231 patch work of save all of pan / evaporator bodies 232 patch work of umbrella of pan / evaporator bodies 233 a ) strengthing of shell with coil type channel with cross by pipe / channel at two places of pan 234 b ) strengthing of umbrella of pan / evaporator bodies 235 dismantling, fabrication & erection of body shell a ) juice sulphitor 236 b ) evaporator bodies 237 c ) pans 238 dismantling, fabrication & erection of bottom / top taper portion of a ) pans 239 b ) evaporator bodies 240 dismantling of ss tubes of a ) pans 241 b ) evaporator bodies 242 c ) juice heater 243 fitting of ss tubes and to be tested at 80 psi hyd. pressure a ) pans 244 b ) evaporator bodies 245 c ) juice heater 246 a ) dismantling of s.s tube of semi kestner 247 b ) fitting of s.s tubes of semi kestner and to be tested 80 psi hyd. pressure 248 dismantling, fabrication and erection of shaft with arms of dry seed crystallizer / vacuum crystallizer. 249 dismantling, fabrication and erection of agitator arms of juice sulphitor / dry seed crystallizer / vacuum crystallizer. 250 replacement of ribbon type stirrer of air cooled crystallizer. 251 crystallizer central shaft with ribbon: a ) dismantling 252 b ) fabrication 253 c ) erection 254 dismantling, fabrication and erection of condensate bottle big size ( from 1.5mtr to 2.0mtr ) 255 dismantling, fabrication and erection of condensate bottle big size ( from 1.0mtr to 1.5mtr ) 256 dismantling, fabrication and erection of segment of pan shell 257 dismantling, fabrication and erection of complete pan shell including sight glass, man hole, provision of key sample, vacuum gauge, ammonia pipes , glass washing pipe, cold water line connections and other accessories connected to body shell, umbrella including welding of m.s. angles for supports etc., top taper cone including connections of washing steam pipes etc., save all including j pipes etc, vapour pipe outlet nipple of save all, feed pipe connections etc. 258 vacuum crystallizer / dry seed crystallizer ( i ) dismantling, fabrication & erection of complete shell ( including side plates ) along with dismantling, erection & alignment of complete drive system 259 dismantling, fabrication & erection of complete shell ( excluding vertical side plates ) 260 worm and worm wheel, gland housing of crystallizers: a ) dismantling and erection of existing worm and worm wheel, gear box, motor and alignment work of worm and worm wheel, gear box and motor for satisfactory trial. 261 b ) dismantling and erection of gland housing of crystallizer shaft. 262 s.s bend / tee / reducer / nipple / cross a ) dismantling 263 b ) fabrication 264 c ) erection 265 dismantling, fabrication & erection of manhole with neck flange cover 16” to 24” dia 266 cutting & strengthening of old material 267 dismantling, fabrication & erection of worn out feeding header of pans 268 dismantling, fabrication & erection of central tube with cooling coil ( shaft ) for water cooled crystallizer 40 tons 269 a ) dismantling, fabrication & erection of cooling pipe coil in the crystallizer made from 4” dia pipe 270 b ) patch work of crystallizer cooling shaft 271 coils fabrication of coil 272 dismantling & erection of coils 273 dismantling of existing condenser including their venture, tail pipe, bend etc. and thereafter installation of efficient single entry new condensers including fabrication / erection of venture, tail pipe & bends etc. fabrication and erection of base frame and other associated fabrication & erection jobs. 274 dismantling, fabrication & erection of m.s. gutters. 275 replacement of c.i. cone ( venture ) of multijet condenser 276 dismantling c / f machine including water, steam connection and discharge chute 277 dismantling of continuous c / f machine 278 erection of continuous c / f machine with structure complete in all respect 279 dismantling of batch type c / f machine 280 2. erection of batch type c / f machine ( 750 kg / 01 ton ) along with its accessories and structure complete in all respect. 281 3. overhauling / repair of batch type centrifugal machine ( 1ton ) 02 nos. ( spares will be provided by mill ) 282 4. shifting and adjustment of pug mill with structure, gearbox and motor. 283 5.fabrication, installation of masc.chut with two 10’’ / 12’’ butterfly valves 03 nos. 284 6. fabrication, installation of a heavy / a light molasses separator with 2 nos. butterfly valves 6’’ 285 7.fabrication and erection of bottom chute 286 dismantling of old transient heater & erection of new transient heater along with its accessories. 287 erection c / f machine including water, steam connection and discharge chute including modification of staging / structure 288 dismantling and erection of sugar grader of side plate including modification of structure. 289 dismantling, fabrication and erection of circular bottom portion of magma mixer. 290 fabrication and erection of complete casing having outer dia for circular portion 32” approx as existing exhaust blower of batch type centrifugal machines. 291 hoppers a ) dismantling, fabrication & erection of deck piece & alignments of hopper 292 a ) dismantling, fabrication & erection of hopper piece from deck piece to end of hopper 293 b ) dismantling, fabrication & erection of hopper piece from deck piece to start of hopper including multi trays. 294 dismantling, fabrication & erection of hopper complete with deck piece and multi tray for hot / cold air blower. 295 magma mixer a ) dismantling of magma mixer including shaft / arms / drive etc. 296 b ) fabrication of magma mixer including shaft / arms / drive etc. 297 c ) erection of magma mixer including shaft / arms / drive etc. 298 dismantling’ fabrication & erection of molasses gutter for centrifugal machines 299 dismantling and erection of existing syrup / molasses / magma pipe lines for their internal / external cleaning. 300 fabrication of bucket for sugar elevator / dry seed elevator 301 for spray pond a ) fabrication of ss pipe line up to 12” dia from 4 mm thick ss plate 302 a ) fabrication of ss cluster for fitting 2” sized pipes with nozzles ( as fitted in existing clusters ) . 303 threading in 2” dia ss pipe line for fitting nozzles 304 formation of purlin and structure at the height of 20 mtrs approx. with angle size 75x75x6mm and channel size 100x50x5 mm and 200x76x7.5 mm for the fitting of rooftop sheets 305 aluminum panel for electrical cabin 306 part b cutting and welding of boiler tubes for cleaning 307 cutting and welding of header caps for cleaning of boiler tubes 308 seamless pipe ½’’to 8’’od & above ( various lengths ) a ) dismantling 309 b ) fabrication 310 c ) erection 311 seamless pipe nipple up to 8’’od & above a ) dismantling 312 b ) fabrication 313 c ) erection 314 seamless pipe bends up to 8’’od & above a ) dismantling 315 b ) fabrication 316 c ) erection 317 dismantling, and erection of air heater tubes 63.5 mm od x 18 feet length 318 cutting, welding and fitting of air heater old tubes 319 dismantling , fabrication and erection of air heater centre tube plate 320 ibr valve up to 36’’od a ) dismantling 321 b ) erection 322 ibr flange a ) dismantling 323 b ) fabrication 324 c ) erection 325 ibr tee a ) dismantling 326 b ) fabrication 327 c ) erection 328 reducer a ) dismantling 329 b ) fabrication 330 c ) erection 331 boiler drum partition plates a ) dismantling 332 b ) fabrication 333 c ) erection 334 d ) repair 335 boiler drum water seprator a ) dismantling 336 b ) fabrication 337 c ) erection 338 d ) repair 339 boiler wet scrubber seive plate as per drawing a ) dismantling 340 b ) fabrication 341 c ) drilliing 342 d ) erection 343 ibr welding joint...

Department of Cooperation - Punjab

24334134 purchase of planetary gear box e tender for purchase of planetary gear box , supply of planetary reduction gearbox with motor suitable for crystallizer of 85 t capacity driven by existing 25 h . p . motor , shaft size 220 mm . rpm 1 make: top gear/elecon , supply of planetary reduction gearbox with motor suitable for crystallizer of 65 t capacity driven by existing 15 h . p . motor , shaft size 166 mm . rph 20 make: top gear/elecon , supply of planetary reduction gearbox with motor suitable for crystallizer of 45 t capacity driven by existing 15 h . p . motor , shaft size 140 mm . rph 40 make: top gear/elecon , supply of planetary reduction gearbox for vertical mixer of 5 mt capacity flang mounted ( verticla downward ) power 5 hp , 960 rpm , output speed 16 rpm , rated torque 5076 nm , service factor 2 make top gear/elecon/...

Department of Cooperation - Punjab

24320429 tender for fabrication and erection jobs 1 dismantling of m.s./g.i./ c.i./ ss / rmp pipe from 1” to 12” dia 2 erection of ms/gi/ci/ss/ rmp pipe 1” to 12” dia 3 dismantling of m.s. / ss/c.i. pipe line above 12” dia 4 fabrication & erection of m s / ss pipe line above 12” dia from m.s. / ss plate 5 erection of c.i pipe line above 12” dia 6 fabrication & erection of nipple 1” to 12” 7 fabrication & erection of nipple above 12’’ dia 8 fabrication & erection of bend 1” to 12” 9 fabrication & erection of bend above 12’’ dia 10 dismantling of reducer/tee 1” to 12” dia 11 a) dis,fab & erection of blind 1” to 12” dia 12 a) dis,fab & erection of blind above 12” dia 13 a) dis,fab & erection of valve 14 cutting & washing of old flange 15 dismantling of structure/platform 16 fabrication & erection of structure/platforms 17 dis & erection of railing 18 dismantling of m.s. round/square/conical bottom tanks 19 fabrication& erection of m.s. round/ square /conical bottom tanks 20 dismantling, fabrication & erection of suction strainer of spray pump / injection pump 21 dismantling, fabrication & erection of manhole with neck flange cover 22 cutting & strengthening of old material 23 dismantling,fabri & erection of coils 24 dismantling, fabrication & erection of m.s. gutters. 25 fabrication of flange from m.s. plate with drill 26 dismantling & erection of angle valves size 450 mm & above 27 dismantling fabrication and erection of foundation bed of pumps/gear box with their drives 28 patch work at mill house ,boiling house and c/f house etc. 29 dismantling, fabrication & erection of grab of unloader complete. 30 fabrication & erection of grab arm 31 dismantling fabrication and erection of grab box of unloader 32 dismantling, fabrication & erection of unloader bridge rail 33 dismantling, fabrication & erection of sq. bar of cane unloader. 34 dismantling and erection of worn out runners of cane carrier, rbc, bagasse elevator and inter carrier 35 dismantling and erection of worn out angle and channels of runners of cane carrier, rbc, bagasse elevator and inter carrier 36 dismantling, fabrication and erection of worn out trough of rbc, bagasse elevator & rack carriers from a) m s plate 6/8 mm 37 b) s s plate 4/5 mm 38 dismantling, fabrication and erection of worn out side plate of cane carrier & rack carriers from a) m s plate 6/8 mm 39 b) s s plate 4/5 mm 40 fabrication of rake for rake carrier 41 dis. feb. & erection of rack carrier trough tail end side complete 42 dis. feb. & erection of rack carrier trough tail or rear end side complete 43 fabrication and erection of donnelly chute of rack carrier 44 dismantling fabrication and erection structure of cane carrier drive 45 dismantling, fabrication and erection of a) mincer hood 46 b) cutter hood 47 c) chopper hood 48 dismantling, fabrication and erection of worn out juice tray at mill house from 10/12 mm plate 49 dis. feb. & erection of mill house screw conveyor 50 dis. feb. & erection of mill house screw conveyor trough 51 dismantling, fabrication and erection of economiser side plates and top plates (from 6 mm plate) 52 dis,feb,& erection of boiler flue gas ducting between boiler & chimney (from 6mm/8mm plate.) 53 dismantling, fabrication & erection of bend of boiler flue gas ducting between boiler and chimney ( from 6/8mm thick plate.) 54 dismantling and erection of boiler bagasse feeding ci mouth piece. 55 dismantling ,fabrication and erection of new wet scrubber 56 dismantling & erection of wet scrubber of sieve plate 57 dismantling ,fabrication and erection of worn out plate of wet scrubber 58 dismantling ,fabrication and erection of worn out plate of feed tank(from 10 mm plate) 59 dismantling ,fabrication and erection of feed tank(from 10 mm plate) 60 dis. & erection of fd and id fan casing 61 fabrication of fd and id fan casing 62 dis. fabrication and erection of bagasse cillow blower 63 dismantling & erection of boilers furnace c.i door frame and door. 64 dismantling .feb & erection of dampers of boilers 65 dismantling .feb & erection of bagasse feeder dampers 66 patch work of worn our portion of pan / evaporator body shell 67 patch work of save all & umbrella of pan / evaporator bodies 68 dismantling, fabrication & erection of de super heater coils 69 dismantling fabrication and erection of inter connecting square box for juice heater double beat valve 70 dismantling, fabrication & erection of mud scroll / screw conveyor 71 dismantling, fabrication & erection of bagacillo cyclone 72 dismantling ,fabrication &erection of stone catcher strainer 73 dismantling, fabrication & erection of save all from 10 mm to 12mm ms plate a) pan 74 b) quad & vapour cell 75 dismantling, fabrication & erection of umbrella a) pan 76 b) quad & vapour cell 77 dismantling, fabrication & erection of bottom and top cone a) pan 78 b) quad & vapour cell 79 c) juice sulphiter / syrup sulphiter and cone of any other units above 12” dia 80 a) replacement of cooling jacket for the sulphur burning chamber 81 b) replacement of sulphur furnace cooling scrubber complete with internal 8” cooling jacket, 6” gas pipe and 4” cooling pipe 82 c) dismantling, fabrication & erection of cooler made from 8” dia pipe for sulphur furnace 83 dismantling, fabrication & erection of sulphur burning chamber of sulphur furnace(satwik type) 84 dismantling, fabrication & erection of sulphur melt tank 85 dismantling, fabrication & erection of coil for sulphur melter 86 dismantling, fabrication & erection of condenser of vacuum filter 87 dismantling, fabrication & erection of vacuum filter a) mud trough 88 b) agitator 89 fabrication & erection of mud boots for dorr 90 a. replacement of clarifier center tube 91 b. replacement of ms scrapper arms of clarifier center tubes. 92 c. replacement of clarifier juice distribution plates 93 replacement of clarifier bottom plate complete 94 replacement of clarifier bottom plate complete 95 vapour cell a) dismantling of vapour cell tube plate 96 b) erection of vapour cell tube plate 97 dismantling, fabrication & erection of calendria shell of vapour cell with 12 mm m.s. plates. 98 dismantling and erection of semi kestner top/ bottom saucer for its tube replacement 99 replacement of quad / vapour cell down take 100 strengthing of umbrella of pan / evaporator bodies 101 dismantling, fabrication & erection of body shell a) juice sulphitor 102 b) evaporator bodies 103 c) pan 104 dismantling of brass/ss tubes of a) pans 105 b) evaporator bodies 106 c) juice heater 107 d) semi kestner 108 fitting of brass/ss tubes and to be tested at 80 psi hyd. pressure a) pans 109 b) evaporator bodies 110 c) juice heater 111 d) semi kestner 112 dismantling, fabrication and erection of flash tank for juice clarifier. 113 replacement of worn out compartment plate& square grooves of juice heaters a) damaged top compartment plates 114 b) damaged bottom compartment plates 115 juice heater covers a) dismantling and erection of top cover of juice heater. 116 b) dismantling and erection of bottom covers of juice heater. 117 strengthening of pan /quad shell with ms angle an channel(circular type ms channel and cross by angle 118 replacement of j pipe in vapour cell/ quad body/ pan 119 dismantling, fabrication and erection of clear juice over flow box for juice clarifier including all accessories. 120 dismantling, fabrication & fitting of jet box in m.s. material 121 dismantling, fabrication, fitting of jet box in s s material 122 dismantling, fabrication & fitting of nipples 8” to 10” dia for jet box of condenser 123 dismantling, fabrication & erection of vapour pipe bend 36” to 40” dia from ms plate 124 pan a) dismantling & erection of pan tube plate 125 b) dismantling, fabrication & erection of calendria shell with 12 mm m.s. plates pan 126 dismantling, fabrication and erection of segment of pan shell 127 dismantling, fabrication and erection of complete pan shell including sight glass, man hole, provision of key sample, vacuum gauge, ammonia pipes ,glass washing pipe, cold water line connections and other accessories connected to body shell, umbrella including welding of m.s. angles for supports etc., top taper cone including connections of washing steam pipes etc., save all including j pipes etc, vapour pipe outlet nipple of save all, feed pipe connections etc. 128 dismantling, fabrication & erection of worn out feeding header of pans 129 replacement of c.i. cone (venture)of multijet condenser 130 dismantling’ fabrication & erection of molasses / m/c gutter 131 lifting of syrup sulphiter & connected pipe lines etc.to1.0mtr approx. height above the top level of syrup / molasses storage tanks at pan station. 132 dismantling, fabrication & erection of over head water tank, syrup/molasses tank complete in all respects i.e. welding of ms angles for strengthening of tanks, dismantling and erection of platform , ladders, railings. 133 replacement of pan down take 134 dismantling, fabrication & erection of rectangular coil of molasses tank 135 dismantling, fabrication & erection of save all from 8mm to 10mm 136 dismantling, fabrication & erection of save all from 8mm to 10mm ms plate excluding outer shell 137 dismantling ,fabrication & erection of vapour pipe 36’’ 40’’ dia 138 dismantling, fabrication & erection of molasses conditioner stirrer 139 a) dismantling . fabrication & erection of crystallizer cooling shaft 140 a) dismantling, fabrication & erection of cooling pipe coil in the crystallizer made from 4” dia pipe 141 b) patch work of crystallizer cooling shaft 142 vacuum crystallizer / dry seed crystallizer (i) dismantling, fabrication & erection of complete shell or its part along with dismantling, erection & alignment of complete drive system 143 installation, fabrication and erection jobs of plentary gear box: na)dismantling of existing gear box, motors, .worm and worm wheel &fabrication of foundation bed and erection of plentary gear box. n 144 worm and worm wheel, gland housing of crystallizers: a)dismantling and erection of existing worm and worm wheel, gear box, motor and alignment work of worm and worm wheel, gear box and motor for satisfactory trial. 145 b)dismantling and erection of gland housing of crystallizer shaft. 146 dismantling, fabrication and erection of shaft with arms of dry seed crystallizer / vacuum crystallizer. 147 dismantling, fabrication and erection of agitator arms of juice sulphitoror dry seed crystallizer or vacuum crystallizer. 148 replacement of all arms of air cooled crystallizer. 149 dismantling, fabrication and erection of circular bottom portion of magma mixer. 150 magma mixer ndismantling ,fabrication &erection of magma mixer including shaft / arms / drive etc. n 151 dismantling and erection of existing syrup/ molasses/ magma pipe lines for their internal/external cleaning 152 replacement of transient heater tubes with tube plates 153 dismantling of old transient heater and erection of new transent heater 154 hoppers a) dismantling, fabrication & erection of deck piece & alignments of hopper 155 b) dismantling, fabrication & erection of hopper piece 156 dismantling, fabrication & erection of hopper piece including multi trays. 157 d) dismantling, fabrication & erection of hopper complete. 158 fabrication of bucket for sugar elevator / dry seed elevator 159 for spray pond one side na) fabrication of ss pipe line up to 12” dia from 4 mm thick ss plate n 160 b) fabrication of ss cluster for fitting 2” size pipe with nozzles n ( as fitted in existing clusters) n 161 c) threading in 2” dia ss pipe line for fitting nozzles 162 fabrication of balanced single/double stage fan / impeller having outer dia up to 18” and width up to 5” for air blower of hopper as per existing. 163 fabrication of balanced fan/impeller for exhaust blower having od 23” & width 14” approx. as existing for batch type centrifugal machines. 164 fabrication and erection of complete casing having outer dia for circular portion from 20” to 22” approx. as existing for hot / cold air blower of hoppers. 165 fabrication and erection of complete casing having outer dia for circular portion 32” approx as existing exhaust blower of batch type centrifugal machines. 166 dismantling and erection of sugar grader of side plate including modification of structure. 167 dismantling, fabrication & erection of discharge chute of batch type c/f machine 168 replacement of transient heater tubes with tube plates 169 dismantling of old transient heater and erection of new transent heater 170 fabrication & erection of new heating unit of hot air blower including its shell and tube plate, fitted with new tubes for hopper no. 2 171 dismantling c/f machine including water, steam connection and discharge chute 172 erection c/f machine including water, steam connection and discharge chute including modification of staging / structure 173 dismantling of juice heater along with connected pipe line and valve up to 2 mtr. 174 dismantling, fabrication & erection of roof for final molasses tank 175 dismantling, fabrication & erection of shell for final molasses tank ...

Department of Cooperation - Punjab

24240177 suuply of planetary gear supply of planetary gear box , supply of planetary gear box , make: top gear/kavitsu/elicon/any make approve by nfcsf planetary gear box suitable for 40 ton a massecuite 1 rpm , air cooled crystallizer ratio 1440:1 speed 1 rpm input 3 hp , 1440 rpm generated torque 16710 nm rated torque 43000 nm s . f 2 . 75 shaft horizontal , planetary gear box suitable for 30 ton a massecuite 1 rpm , air cooled crystallizer ratio 1440:1 speed 1 rpm input 3 hp , 1440 rpm generated torque 16710 nm rated torque 43000 nm s . f 2 . 75 shaft horizontal...

Department of Cooperation - Punjab

24201558 job work for fabrication dismantling fabrication and errectionm jobs , contract jobs of dismentaling , fabrication and erection , dismentling of m . s . pipe , 1: to 12 dia , dismentling of c . i . 1 to 12 dia and above , erection of m . s . pipe 1 to 12 dia , erection of c . i . 1 to 12 dia and above , fabrication of m . s . pipe line above 12 dia from m . s . plate , dismentling of m . s . pipe line above 12 dia , erection of m . s . pipe line above 12 dia , fabrication of s . s . pipe line 6 to 24 dia from s . s . plate , dismentling of s . s . pipe line 6 to 24 dia , erection of s . s . pipe line 6 to 24 dia from s . s . plate , dismentling of nipple 1 to 12 dia upto 24 length , fabrication of nipple 1 to 12 dia and upto 24 length , erection of nipple 1 to 12 dia and upto 24 length , dismentling of nipple above 12 dia upto 24 length , fabrication of nipple above 12 dia and upto 24 length , erection of nipple abvoe 12 dia and upto 24 length , dismentling of bend 1 to 12 dia , fabrication of bend 1 to 12 dia , erection of bend 1 to 12 dia , dismentling , farbication and erection of bend above 12 dia , dismentling of reducer/tee 1 to 12 dia and upto 24 length , fabrication and erection of reducer/tee 1 to 12 dia and upto 24 length , dismentling of blind 1 to 12 dia , fabrication of blind 1 to 12 dia , erection of blind 1 to 12 dia , dismentling of blind above 12 dia , fabrication of blind above 12 dia , erection of blind above 12 dia , dismentling of valve 1 to 12 dia , erection of valve 1 to 12 dia , dismentling of valve above 12 dia , erection of valve above 12 dia , cutting and washing of old flanged 1 and above , dismentling of structure/platform , fabrication and erection of structure/platform , dismentling of railing , fabrication and erection of railing , dismentling of molasses/syrup storage tank of pan station , dismentling of bottom with one meter worn out height of molasses/syrup storage tank , fabrication of molasses/syrup storage tank of pan station , fabrication of bottom plate with one meter wornout height of molasses/syrup storage tank , erection and strengthing with m . s . angle of molasses/syrup storage tank of pan station , bottom with one meter worn out height of molasses/syrup storage tank , dismantaling and erection of valves with nipples and tee etc . , dismentling , fabrication and erection of weighedjuice tanks bottom and side plates up to one meter height , fabrication of vapour pipe bend 36 to 40 dia , dismentling and erection of vapour pipe bend 36 to 40 dia , dismentling , fabrication and erection of discharge valves of crystilizer , dismentling , fabrication and erection of complete save all of quad body/pans , dismentling , fabrication and erection of complete umbrella of quad body , dismentling fabrication and erection of strainers , dismentling fabrication and erection of fundation bed of any type of pumps . , modification of pipe lines , cutter , sluice valves of pan no . 3&4 for use of the pans on a , b&c massecuite pans , modification of exhaust washing line for use at vapour washing , dismentling of vapour pipe 900 mm / 1000 mm dia , fabrication of vapour pipe 900/1000 mm dia , erection of vapour pipe 900/1000 mm dia , dismentling , fabrication and erection of save all of pans from 8 mm to 12 mm m . s . plate , dismentling , fabrication and erection of umbrella of pan from 6 mm m . s . plate , dismentling , fabrication and erection of top cover of save all of pan and quad , dismentling , fabrication and erection of outer shell of save all of pan and quad , dismentling , fabrication and erection of inner portion of save all of pan and quad , replacement of j pipe in vapour cell/quad body/pan , patch work at boiling house and centrifugal house etc . , dismentling , fabrication and erection of rectangular coil of molasses tank , patch work of save all of pan/ evaporator bodies , patch work of umbralla of pan/ evaporator bodies , stengthing of umbrella of pan/ evaporator bodies , dismentling , fabrication and erection of complete broken arms of dry seed crystallizer of similar other crystallizers , replacement of worn out shaft of dry seed crystallizer with en 8 shaft , dismantaling of cold water overhead storage tank at pan station , fabrication of cold water over head tank at pan station , erection of cold water over head tank at pan station with strenghing , dismantling , fabrication and erection of juice sulphitrer bottom cone and working heigh of juice sulphiter ( 2 . 5mtrapprox ) , replacement of damaged final molasses 6 pipe lines of molasses storage tanks starting from pan station to both final molasses tank , fabrication and erection of distributor in down take of pans , repair/fabrication/replacement of worn out ss pipe lines , nipples , tee etc . of spray pond pipe lines , dismantling , fabrication and erection of inter carrier chain casing complete with supports , angles , runner etc . , replacement of flat , runner , m . s . railing and square bar etc , replacement of runner along with supporting angle/ channel for cane carrier chain/rbc , replacement of runner along with supporting angle / channel for inter carrier chain , dismentling , fabrication and erection of m . s . plate of cane carrier with supports , febrication & fitting of plateform , dismantling & erection of ibr pipe line/above 6dia , dismantling & erection of ibr pipe line/ upto 6 dia , dismantling & erection of ibr bends/ reducers upto 6 dia , dismantling of ibr nipple upto 6 dia , dismantling , fabrication , erection of exhaust line from desuper heating system outlet to juice heater inlet/ header with bends/ nipples , dismentling fabrication and erection of boiler no 2 airheater outlet to inlet of id fan casing , dismentling fabrication and erection of boiler blow down line from chamber area to blow down tank , patch work of wet scrubeer casing /ducting/bottom cone/clarifier , dismantling , cleaning , testing , painting , and refitting of gilled type economiser...

Department of Cooperation - Punjab

20606873 e tender dismantling, fabrication and erection jobs. 50. replacement of worn out various types of juice pump strainers. 51. replacement of worn out various types of strainers that of lime pumps, un sulphured, syrup pumps. 52. complete replacement of worn out save all of evaporator bodies in all respects. 53. complete replacement of worn out save all of pans in all respects. 54. replacement of worn out vapour pipe of various sizes of pans going to condenser 55. patching / repair work inside various boiling house equipments like pans, evaporator bodies and clarifier etc. (area only upto 4m2 will be considered as patch work) 56. patching / repair work inside various boiling house equipments like pans, evaporator bodies and clarifier etc. (area more than 4m2 ) 57. replacement of worn out steam/general coil of ordinary design size 1/2 to 3 do but 4 to 6 58. replacement of worn out steam/general coil of pure circular design size 1/2 to 3 do but 4 to 6 59. dismantling, fabrication & erection of pans vapour pipe line bends leading from body shell to condensers. rates to quoted in terms of : full bend: 900 mm, 1100 mm, 1250 mm. half bend: 900 mm, 60. injection pumps nrv : a) dismantling b) fabrication c) erection d) repair of valve 61. replacement of gutters a) dismantling b) fabrication c) erection 62. a) replacement of worn out stirrer arms (straight type) b) replacement of worn out stirrer arms (worm type) 63. replacement of complete cooling coil of overhead crystallizer. 64. replacement of worn out umbrella of pans 65. replacement of worn out shell of sulphur furnace complete in all aspects 66. a) replacement of entire cooler unit of sulphur burners, complete in all respect. b) replacement of worn out portion of sulphur burner cooler inside pipeline. => open tender...

Nakodar Co-Operative Sugar Mills Ltd - Punjab

20490187 supply of iron and steel ms sheet, ms plate, ms chequered plates, ms medium channel, ms angle, ms flat, en 8 flat, spring steel flat, ms square, round tor steel, s.s round, high carbon steel, en 8 round, pipe and fittings, m.s. bends/flanges and pvc pipe, m.s flange table, pvc joint socket, pvc flange and socket, m.s long radius bend heavy duty, pvc solvent cement tube, ss plate, ss pipe, s.s. tubes, pump and pump spares, high flow pumps and its spares, material for spray pond rmp heavy duty cluster/junction box, rmp nozzles, rmp 90 short bend, rmp branch pipe, spares for centrifugal machine en 8 basket shaft for centrifugal machine, two way solenoid valve hand operated, three way solenoid valve hand operated, brake spring, wire braided pipe 14 x 1 mtr both side nuts, masseculte chute spring, brake liner w x 8 make hindustan composite/farado, brass nut & ferrule ¼’, solenoid valve aluminium body, pneumatic valve rubber seat, brass nipple, push button knob assembly copper pipe, ss nozzle ,4”, pneumatic pipe, pneumatic connector, control valve, mist lubricator for batch type cf machine, exhaust blower for batch type machine, bearing housing, brass spray nozzle — 1/4 with controller, s.s spray nozzle 1/4 with controller, spares for centrifugal machine n.k. 1100 n.h.e.c make, electrical motors, crystallizer shaft, dorr central shaft/tube, top and bottom cover of juice heater, hydraulic grab, planetary gear box, ss hydro cyclone etc....

Deemed University - Punjab

16526793 supply of equipments. 1. oil free vacuum pump 01 2. overhead stirrer 01 3. viscometer: 01 4. redwood viscometer 01 5. reciprocating pump test rig 01 6. pitot tube 01 7. centrifugal pump test rig 1hp 01 8. gear pump test rig 01 9. multistage centrifugal test rig 01 10. rotary air compressor rig 01 11. single stage air compressor test rig 01 12. two stage air compressor test rig 01 13. working model of belt conveyor 01 14. working model of bucket conveyor 01 15. working model of chain conveyor 01 16. working model of screw conveyor 01 17. reynolds experiment 01 18. electric heater rod 03 19. thermocouple 25 20. mono bloc pump 03 21. magnetic drive pump 02 22. drop wise / film wise condensation 01 23. open pan evaporator 01 24. liquid liquid extraction in packed bed 01 25. batch crystallizer 01 26. ph meter 01 27. autoclave (vertical model) 01 28. temperature process controller using heat exchanger 01...

Department of Cooperation - Punjab

16440543 tender for dismantling fabrication erection job 175 complete alignment of cane unloader bridge ( both sides ) . 50% payment will be released after completion of job. 50% payment will be released after close of crushing season. 176 replacement of existing shell of burners of so2 furnaces alongwith connection. 177 replacement of tube plates of 40 ton pan no. 9. 178 patch work of molasses tanks no. 1, 2 & 4. 179 dismantling / shifting and erection of boulogue type molasses measurement scale from other sugar mills. 180 fabrication and erection of rubber seated valve for cut over lines pans. 181 replacement of wornout bottom half portion of crystallizer no. 2 182 replacement of wornout side plates of 2 nos. juice compartment of clarifier 183 modification of flash tank of dorr clarifier. 184 dismantling of d.c. 10 cfg. machine ( 2 nos. ) and shifting of machines to the required place. 185 dismantling of 3 nos. nk. 1100 continuous cfg. machine from patiala coop.sugar mills including in transportation and erection of all machine at mills side ( in place of dc machines ) this job will also include modification of platform / structure as per requirement. 186 dismantling of s.s. pipe line above 12 for spray pond. 187 fabrication / erection of s.s. pipe line above 12 for spray pond 188 fabrication of s.s. nipple, tee 189 erection of s.s. nipple, tee. 190 fabrication of s.s. flange 191 erection of s.s. flange 192 fabrication of s.s. bend and reducer 193 erection of s.s. bend and reducer...

Department of Cooperation - Punjab

16440534 tender for dismantling fabrication erection job 128 erection of pneumatic type cut over valve. 129 erection of pneumatic type discharge valve. 130 dismantling, fabrication & erection top of juice sulphiter 131 dismantling, fabrication & erection of shell of juice sulphiter. 132 replacement of worn out shell of vacuum crystallizers 133 dismantling and erection of rail line of cane unloader. 134 dismantling, fabrication and erection of vapour/exhaust pipe line above 300 mm dia 135 dismantling and erection of dsm screen (including fitting of wedge wire screen) complete in all respects. 136 fabrication and erection of s.s. discharge valve for melter and receiver of each sulphur furnace. 137 replacement of chemical dosing tank of syrup clarifier. 138 replacement of syrup receiving tank of syrup clarifier. 139 dismantling, fabrication and erection of flash tank of dorr clarifier. 140 dismantling and erection of air heater tubes of j.t. boiler no. 2 ( including cutting both ends of old tubes)141 dismantling, fabrication & erection of bottom of dorr clarifier alongwith cone. 142 dismantling, fabrication & erection of bottom of dorr clarifier alongwith cone including shell of height app. 12” to 18” as requirement during dismantling. 143 fabrication & erection of juice coils of dorr. 144 dismantling & erection of baffle of wet scrubber of apcd. 145 dismantling of worm/worm wheel of crystallizer & fitting of planetary gear box. 146 dismantling of old d.s.m. screen and fitting of new d.s.m. screen mill house. 147 to set right the scrappers of dorr compartment. 148 dismantling, fabrication & erection of shell of quad body no. 4. 149 dismantling, fabrication & erection of front half portion of pan no. 1 2. 150 dismantling, fabrication & erection of shell of apcd wet scrubber. 151 dismantling of old radiator of hopper and erection of new radiator alongwith hot air blower. ...

Department of Cooperation - Punjab

16440531 tender for dismantling fabrication erection job 103 bottom cone to be replaced of a.p.c.d. clarifier. 104 dismantling, fabrication & erection of wornout plate of a.p.c.d. clarifier. 105 repair of cane unloader grabes. 106 broken shaft of magma mixer, pug mill, sugar melter, juice sulphiter, brown sugar crystallizer to be repaired. 107 dismantling, fabrication & erection of juice sulphiter tower/syrup sulphiter tower/cyclone of bagacillo. 108 replacement of wornout worm wheel worm of crystallizers. 109 replacement of wornout inter carrier trough with runner. 110 replacement of wornout plates of sugar hopper. 111 dismantling, fabrication & erection of radius portion of bagasse elevator chain/ rbc chain complete112 dismantling, fabrication & erection of top/bottom cone of wet scrubber complete. 113 fabrication of street lights poles from old pipes. 114 dismantling, fabrication & erection of juice box of double beat valve. 115 dismantling of shell plate of molasses storage tanks. 116 fabrication & erection of shell plate of molasses storage tanks 117 repair work of wornout roof of molasses storage tanks by carpeting 3 mm plate on entire roof. 118 dismantling, fabrication & erection of m.s. tank at filtrate pit. 119 dismantling, fabrication & erection of nipples of juice heaters (between juice heater body & double beat valve) 120 fabrication & erection of casing of f.d. fan. 121 repair of juice heater covers (by fixing 12 mm plate on its face). 122 fabrication & erection of shed for electric motors, panel boards and any other machinery parts. 123 dismantling, fabrication & erection of molasses separator of centrifugal machine 124 dismantling, fabrication & erection of top cover of nhec make centrifugal machines 125 dismantling, fabrication & erection of bottom cone of pan. 126 dismantling of covers of old juice heater to be fitted at new juice heater 127 erection of cold air blower ...