Punjab University - Punjab

33468224 tender for 1) turnkey beekeeping and honey processing facility, 2) turnkey multi utility food processing line, 3) turnkey mushroom spawning unit, 4) multi material fdm based 3d printing machine, 5) 3d scanner, 6) stack monitoring kit, 7) flue gas analyser, 8) optical/metallurgical microscope with digital camera, 9) compression moulding machine, 10) hydraulic specimen molding press, 11) impact testing machine, 12) computer controlled electrochemical impedance spectroscopy setup, 13) single disc variable speed grinder/polisher, 14) low speed diamond saw/precision diamond cutter, 15) sputter deposition setup, 16) vacuum furnace, 17) homogenizer, 18) refrigerated centrifuge, 19) environmental chambers, 20) double door autoclave, 21) high pressure homogenizer, 22) hydraulic press for ir sampling, 23) multimode microplate reader, 24) probe son icator, 25) rheodyne manual injector kits, 26) supercritical fluid extraction system, 27) zebra fish housing and breeding system....

Punjab State Power Corporation Limited - Punjab

33052602 procurement of special steel sail hard for flue gas duct for unit 3 and 6 during annual overhauling for the year 2022 23 procurement of special steel sail hard for flue gas duct for unit 3 and 6 during annual overhauling for the year 2022 23 , sail hard/carbon steel plate, 6 mm sheet...

Punjab Biotechnology Incubator - Punjab

32836523 tender for supply, installation, testing and commissioning of laboratory equipment like hplc, lcmsms, biosatety cabinet class ii typre a2, flue gas analyser, ph & conductivity meter, digital weighing balances, cold room etc....

Punjab Biotechnology Incubator - Punjab

32317707 supply, installation, testing of laboratory equipment like fully automatic distillation digestion and titration system microwave digestion system , digital polarimeter, flue gas analyser, ph conductivity meter, digital weighing balance etc...

Department of Cooperation - Punjab

32288527 fabrication & erection jobs ( budhewal csm ) 1 budhewal csm 2 pipe linem.s1” to 12” diaa ) dismantling 3 b ) erection 4 replacementofpipe linem.sabove 12” dia ( other than vapour pipe of pan and quad ) 5 pipe linec.i.1”to 12” diaa ) dismantling 6 b ) erection 7 ibr steam pipe line .3”to 8” diaa ) dismantling 8 b ) erection 9 a ) bend m.supto 12” diaa ) dismantling 10 b ) erection 11 b ) bend m.s.above 12” dia ( other than vapour pipe line ofpans & quad ) a ) dismantling 12 b ) erection 13 bendofm .s.upto 12” dia ( other than vapour pipe line ofpans & quad ) a ) dismantling 14 b ) erection 15 nippleofm .s.upto 12” dia ( other than vapour pipe line ofpans & quad ) a ) dismantling 16 b ) erection 17 reducerofm .s.upto 12” dia ( other than vapour pipe line ofpans & quad ) a ) dismantling 18 b ) erection 19 bend, nipple, reducer ofm .s. above 12” dia ( other than vapour pipe line ofpans & quad ) 20 man holes of all sizesa ) dismantling 21 b ) fabrication 22 c ) erection 23 flanges of all sizea ) dismantling 24 b ) fabrication 25 c ) erection 26 m.steea ) dismantling 27 b ) erection 28 m.snipplea ) dismantling 29 b ) erection 30 m.scrossa ) dismantling 31 b ) erection 32 m.sreducers a ) dismantling 33 b ) erection 34 m.sblind a ) dismantling 35 b ) erection 36 dismantling, fabrication and erectionm.scoil of2” to 4” dia 37 replacement platform of any type 38 m.s. structure work ( factory building ) replacement 39 m.s.tank having round &rectangular bottomsreplacement 40 trusses, perlins, columns & beams ( factory building ) replacement 41 platform pipe line railing of all sizes a ) dismantling 42 b ) erection 43 electric panel, db and other machinery shed gi / acc / ms sheeta ) dismantling 44 b ) fabrication 45 c ) erection 46 dismantling, fabrication and erection of pump and motor bed of all size 47 valves sluice / angle / n.r. / butterflydismantling 48 b ) erection 49 conefromm.splatea ) dismantling 50 b ) fabrication 51 c ) erection 52 gutter from m.s plate 5mm a ) dismantling 53 b ) fabrication 54 c ) erection 55 crystallizerslide gatevalvea ) dismantling 56 b ) fabrication 57 c ) erection 58 fabrication and erection of m. s terminal box of any type 59 patch workof boiling house / mill house 60 replacementof sulphurfurnace scrubberfrom m. s. plate from 10mm ( including all connections with pipe lines ) 61 replacementofsulphurfurnace melter / receiver from m. s. plate from 10mm ( including all connections with pipe lines ) 62 sulphurfurnace chamberfrom m. s. plate from 10mm ( including all connections with pipe lines ) dismantling , fabrication&erection 63 dismantling , fabrication & erection of sulphur furnace nipples, bends 64 juice heater outer shellfrom m.s. plate 10mm including hydraulic testing at 50 psi for each juice heatera ) dismantling 65 b ) fabrication 66 c ) erection 67 fabrication & erection of mud mixture scroll & side plateswith proper alignment & commissioning 68 juice clarifier inside compartment coil from m.s. pipe 5” with all connections complete job ( as where it is ) dismantling, 69 b ) fabrication 70 c ) erection 71 dismantling, fabrication & erectionof juice heater angle valves , distance piece from m.s. plate 10mm of diameter 12” 72 dismantling, fabrication & erection of juice heater ( top & bottom ) compartment partition plate with rubber fitting channels from m.s / en 8 square bar & rubber seal fitting to make it leak proof ( to avoid short circuiting ) i ) top compartment 73 ii ) bottom compartment 74 dismantling fabrication & erection of ms channel of rubber strips of juice heater compartments with m.s / en 8 square to avoid short circuiting 75 quad body shell from m. s. plate12mm dismantling 76 b ) fabrication 77 c ) erection 78 top conefrom m. s. plate12mmdismantling 79 b ) fabrication 80 c ) erection 81 umbrelllafrom m.s. plate10mm dismantling 82 b ) fabrication 83 c ) erection 84 down take from m.s. plate12mmdismantling 85 b ) fabrication 86 c ) erection 87 save –allfrom m.s. plate10mmdismantling 88 b ) fabrication 89 c ) erection 90 pan ( capacity 40 ton ) body shell from m. s. plate12mm dismantling 91 b ) fabrication 92 c ) erection 93 top conefrom m. s. plate12mmdismantling 94 b ) fabrication 95 c ) erection 96 umbrelllafrom m.s. plate10mm dismantling 97 b ) fabrication 98 c ) erection 99 down take from m.s. plate12mmdismantling 100 b ) fabrication 101 c ) erection 102 save –allfrom m.s. plate10mmdismantling 103 b ) fabrication 104 c ) erection 105 vapour / exaustpipe line of quad and pan from m.s plate 8mma ) dismantling 106 b ) fabrication 107 c ) erection 108 dismantling , fabrication & erection of distance piece of vapor pipe of pan / quad & injection header length upto 1.5 mtra ) dia 1000mm 109 b ) dia 900mm 110 c ) dia 720 mm 111 d ) dia – 620 mm 112 e ) dia 400mm 113 dismantling, fabrication & erectionof steam jacket of evaporator / semi kestner including nipple, flange if any 114 syrup / molasses tank from m.s plate 8mm along with strengthening with m.s angle a ) dismantling , fabrication &erection 115 replacement / patch work of worn out body shell of final molasses storage tankwith m.s. plate 116 replacement / patch work of worn out roof of final molasses storage tankwith m.s. plate 117 a. dismantling, fabrication & erection of suction pipes of injection / spray pumps including reducer 118 b. dismantling, fabrication & erection of strainersof injection / spray pumps . 119 dismantling, fabrication & erection of cooling coilsof crystallizers including connection pipe if any 120 dismantling , fabrication and erection water weighing & receiving tanks 121 a ) dismantling, fabrication, erectionof magma mixturebodyincludingdriving units complete 122 b ) patch work of any magma mixture / pug mill 123 replacement of worn out round portion of crystallizer body 124 repairandfitting of bush to crystallizer ‘s central shaft 125 replacementofworn out condensatejuice receiving bottleswith all connection 126 dismantling, fabrication & erection of completescrapper hinge of juice clarifier 127 a ) dismantling, fabrication & erection of dorr’ s scrapper 128 b ) dismantlingfabrication & erection of flash tank of dorr with all nipple etc. 129 replacement of c.itailpipe of pan & quad with ms pipe line 130 replacementofcondenser jet box 131 dismantling, fabrication & erectionof the bottom portion of pug mill ( centrifugal machine ) 132 replacement of the outer shell of the dorr clarifier 133 replacement / repair of worn outportionof sugargraderside plates & chutes 134 replacement / repair of worn out portionofhopper 135 replacement of air tray of hopper 136 dismantling, fabrication & erection of worn out shaft of crystallizerincludingcomplete gear arrangement with complete commissioning 137 dismantling , fabrication & erection of ribbon type arms of crystallizer 138 complete replacement of ribbon type arms of crystallizer 139 dismantling , fabrication & erection of vacuum filter condenser 140 dismantling , fabrication & erection distribution plate of central shaft of juice clarifier 141 dismantling , fabrication & erection mud boot of juice clarifier 142 dismantling& erection of spraypump with all connection including distance piece 143 vacuum filter trough& agitator repair / patch work 144 dismantling, fabrication & erection of vacuum filter trough 145 strengthening of umbrella of pan / quad body 146 strengthening of save all of pan / quad body 147 dismantling, fabrication & erection of juice sulphitor chimney 148 dismantling, fabrication & erection ofcomplete a magma mixtureincluding fitting of central shaftwith arms & gear arrangement with commissioning 149 dismantling & erection of pug mill gear arrangement& replacement of bush , works includes fitting of radicons & commissioning 150 modification of exhaust blower including strengthening of bed & commissioning 151 modification of dry seed elevator bottom chute to avoid breakdown / jamming 152 dismantling, loading & transportation of discharge valve of pan from csm patiala & unloadingat csm budhewal 153 dismantling &erection of discharge valveof pan no 4 withmodification if any including trials & commissioning at csm budhewal 154 re tubing of evaporator body ( approx.1600tube ) including hydraulic testing at 50 psi 155 dismantling &erection of tube plates of 3rd body of evaporator 156 dismantling & erection of transient heater with all connection of pipe lines, valveswith modification if any including trials & commissioning 157 dismantling, loading & transportation of transient heater from csm patiala & unloading at csm budhewal 158 dismantling , fabrication & erection of venturi of condenser 159 dismantling, fabrication & erection of bottom sourcer of pan no 4 160 dismantling, fabrication& erection of chute of 5’ widthgrader for leak proof working 161 repair / replacement of bagacillo perforated plate of bagacillo blower for r.v.f 162 modification job of bottom saucer of evaporator 163 dismantling , fabrication & erection of ammonia coil of pan / quad 164 sulphur furnace heating element repair / replacement of jacketsincluding nipples 165 dismantling & erection of partition box of juice heater 166 replacement of worn out of m.s. runner of inter carrier, elevator, rbc, cross carrier & cane carrier chains 167 replacement of rail line of cane unloader with 50mm square bar 168 replacement of worn out ducting of boiler & apcdincluding angle, channel, flats & flanges 169 replacement of side plates of cane carrier chain / rbc trough / cross elevator / bagasse elevator 170 leveling of cross elevator chain trough 171 mill house screw conveyor assembly ( complete with bearings ) dismantling , 172 b ) fabrication 173 c ) erection 174 replacement of worn out portion of apcd includes casing / scrubberand flue gas entry connected to chimney portion etc. 175 cane cutter hood and chopper top plate from 12 mm thickm.s platea ) dismantling 176 b ) fabrication 177 c ) erection 178 dismantling, fabrication & erection of worn out portion of chute cane carrier to 1st mill 179 replacement runner ( flat size 50x8mm ) of cane carrier / cross elevator / rbc / baggase elevator 180 dismantling, fabrication, erection of juice tray of mill no. 1 & 2 from m.s plate 8mm 181 10 mm 182 dismantling, fabrication, erection of juice tray of mill no. 1 & 2 from s.s plate 8mm 183 10 mm 184 repair of rotary bagasse feeders of boilersa ) body 185 b ) rotor 186 replacement of casing of boiler ( both plate & supporting angle ) 187 i.d. fan worn out casing of both boilersdismantling 188 b ) fabrication 189 c ) erection 190 replacement of the expansion joints of boilers 191 replacement of worn out ductingthe boilers 192 erection and fabrication ofany thingfrom scrap 193 replacement of inter carrier side plates 194 replacement of scraper barside platessize : 1 meter square 195 replacement of the casing of air heater 196 replacement of worn out of m.s. runner of inter carrier, elevator, rbc, cross carrier & cane carrier chains 197 replacement of rail line of cane unloader with 50mm square bar 198 replacement of worn out ducting of boiler & apcdincluding angle, channel, flats & flanges 199 replacement of side plates of cane carrier chain / rbc trough / cross elevator / bagasse elevator 200 leveling of cross elevator chain trough 201 mill house screw conveyor assembly ( complete with bearings ) dismantling , 202 b ) fabrication 203 c ) erection 204 replacement of worn out portion of apcd includes casing / scrubberand flue gas entry connected to chimney portion etc. 205 cane cutter hood and chopper top plate from 12 mm thickm.s platea ) dismantling 206 b ) fabrication 207 c ) erection 208 dismantling, fabrication & erection of worn out portion of chute cane carrier to 1st mill 209 replacement runner ( flat size 50x8mm ) of cane carrier / cross elevator / rbc / baggase elevator 210 erection and fabrication from scrap 211 replacement of inter carrier side plates 212 replacement of inter cane carrier plates 213 replacement of scraper barside platessize : 1 meter square 214 replacement of air heater tubes ( approx.555tubes ) including hydraulic testing...

Department of Cooperation - Punjab

32288422 fabrication and erection jobs of gurdaspur csm 1 gurdaspur csm 2 repair of cane unloader grab arms 3 replacement of sq. bar of cane unloader. 4 fabrication & erection of hydraulic grab of unloader complete. 5 repair, strenghening and alingment of bridge span of unloader no. 1 6 dismantling, fabrication and erection ofa ) mincer hood 7 b ) cutter hood 8 c ) chopper hood 9 replacement ofcane cutting knives of cutters 10 replacement ofcane cutting knives of mincer 11 fabrication & fitting of stationary knives structure withknives 12 replacement ofhammers of mincer 13 replacement of domite tipsof mincer 14 to build mill top rollers square end as per standard size 15 to build mill rollers crown pinion teeth as per standard template of teeth. 16 to build mill rollers coupling square section as per standard size 17 to build mill rollers journal as per standard size 18 to build millunder feeder rollers drive gear teeth as per standard template of teeth 19 fabrication and erection of mill rollers crown pinion guard 20 fabrication and erection of donnelly chute of mills 21 dismantling, fabrication and erection of worn out juice tray at mill house from 10 / 12 mm plate 22 dis. feb. & erection ofmill house screw conveyor 23 dis. feb. & erection of mill house screw conveyor trough along with dismantling and fitting of conveyor and drive system. 24 dismantling and erection of worn out runners of cane carrier, rbc, bagasse elevator and inter carrier. 25 dismantling, fabrication and erection of worn out side plates of cane carrier, rbc, bagasse elevator and inter carrier. 26 dismantling, fabrication and erection of worn out trough of rbc, bagasse elevator & rack carriers froma ) ms plate6 / 8 mm 27 b ) ss plate 4 / 5 mm 28 dismantlingfabrication and erectionstructure of cane carrier drive , rbc chain drive, rakecarrier and elevator chain drive 29 replacement of worn out bottom boot of intercarrier chain / secondary chain 30 replacement of angle and channel of cane carrier / rbc / rack carrier & elevator . 31 repair of secondarycane carrier chain and elevator chain rake 32 fabrication of secondarycane carrier chain and elevator chain rake 33 fabrication of rbc slates 34 repair of rbc slates 35 dis. and erection of bagassecillow blower 36 fabrication of bagassecillow blower 37 dismantling and erection of boiler bagasse feeding ci furnace mouth piece of wil make boiler. 38 dismantling and erection of boiler bagasse feeding ci furnace chute 39 replacement of furnace door frame of wil make boiler & texmaco make boiler 40 replacement of furnace doorof wil make boiler & texmaco make boiler 41 repair and fitting of furnace door frame of wil make boiler & texmaco make boiler 42 repair and fitting of furnace doorof wil make boiler & texmaco make boiler 43 replacement of furnace chamber door frame of wil make boiler & texmaco make boiler 44 replacement of furnace chamber door of wil make boiler & texmaco make boiler 45 repair and fitting of furnace chamber doorof wil make boiler& texmaco make boiler 46 repair and fitting of furnace chamber door frameof wil make boiler& texmaco make boiler 47 dismatling of boiler dampers 48 fabrication of boiler dampers 49 erection of boiler dampers 50 repair of boiler dampers 51 repair ofid fanofwil and texmaco make boiler 52 repair offd fanofwil and texmaco make boiler 53 dismantling, fabrication and erection of boiler bagasse feeding ms chute between boiler furnance and rbc chain 54 patch work 55 dis, feb, & errection of boiler flue gas ducting between fd fan, id fan& chimney. 56 dismantling, fabrication & erection of bend of boiler flue gas ducting between id fan and chimney from 6 / 8mm thick plate. 57 dismantling, fabrication & erection of side plate & top plates ( 4mm ) of boilers. 58 dismantling, fabrication & erection economiser top & side plates 59 dismantling, fabrication & erection air heatertop & side plates 60 dismantling and fitting of gi / acc sheet. a ) dismantling 61 b ) fitting 62 dismantling of machinery structure. 63 fabrication and erection of machinery structure. 64 dismantling & erection of fd fan casing 65 fabrication of fd fan casing 66 repair of fd fan casing 67 dismantling & erection of id fan casing 68 fabrication of id fan casing 69 repair of id fan casing 70 dismantling, fabrication & erection ( a ) pump and motor bed 71 b ) motor and radicon 72 c ) cutter motor bed 73 dismantling fabrication and erection ofwet scrubber cone 74 dismantling fabrication and erection ofwet scrubber side plates 75 dismantling fabrication and erection ofclarifier cone of boiler 76 dismantling fabrication and erection ofman hole 77 dismantling fabrication and erection ofman hole blind 78 dismantling of sieve plate of boiler no. 3 wet scrubber 79 fabrication of sieve plate of boiler no. 3 wet scrubber 80 drilling of sieve plate of boiler no. 3 wet scrubber 81 erection of sieve plate of boiler no. 3 wet scrubber 82 dismantling , fabrication and erection ofboiler no. 3 chimney ( top portion up to 18 20 mtr ) 83 repair and strenthing of the boiler no. 1 & 2 chimney 84 dismantling of boiler no. 3 air heater tubes 85 fabrication and erection of boiler no. 3 air heater tubes 86 erection of boiler no. 3 air heater tubes 87 dismantling air heater tube plate ( top and bottom ) 88 fabrication air heater tube plate ( top and bottom ) 89 drilling air heater tube plate ( top and bottom ) 90 erection air heater tube plate ( top and bottom ) 91 dismantling air heater centre tube plate 92 fabrication air heater centre tube plate 93 drilling air heater centre tube plate 94 erection air heater centre tube plate 95 fabrications mill roller bearing cover 96 dismantling of structure 97 fabrication of structure 98 erection of structure 99 dismantling of platform plates 100 fabrication of platform plates 101 erection of platform plates 102 dismantlingofrailing 103 fabrication & erection of railing 104 power house fabrication & erection of cable tray 105 replacement ofthimble ( any size ) 106 checking of cable connections, cleaning of thimbles and reconnection 107 replacement of switches / mccb 630 amp / 400amp / 250 amp 108 replacement / erection of changeover switch 630amp / 400amp / 250 amp 109 overhauling of spareelectricalmotorsa ) 0 50 hp 110 b ) above 50 hp 111 c ) three speed motors 112 d ) 150 hp motor 01 no. 113 e ) unloader motor 15 hp 02 nos. 114 f ) four speed motor 04 nos. 115 laying & connection of power & control cables from main panels to remote box and motor 03 no. jobs 116 dismantling of existing three speed electrical panel 117 erection of new four speed panel 118 a. extensionjuice tray of mill no. 1 119 b. extension juice tray of mill no. 2 120 fabrication and erection ofms stairs with railing 121 mill pinion guard ( bottom ) 122 open gear guard ( bottom ) of all chain 123 fabrication ofmotor protection cover 124 fabrication of shed ( any size ) with structure 125 repair of dsm screen 126 dismantling and erection of dsm screen 127 civil foundationrepair along with alignment of transmission gear bed of mill no. 4 128 repair offmg oil tank leakage 129 dismantling of m.s. round / squaretanks 130 fabrication of m.s. round square tanks 131 erection of m s round / square tanks 132 dismantling of m.s. / g.i. / c.i. / ss / rmp pipe from 1” to 12” dia 133 erect ion of ms / gi / ci / ss / rmp pipe 1” to 12” dia 134 fabrication of m s / ss pipe line above 12” dia from m.s. / ssplate 135 dismantling of m.s. / ss / c.i. pipe line above12” dia 136 erection of m.s. / c.ipipe line above 12” dia 137 a ) dismantling of nipple 1” to 12” dia up to 24” length 138 b ) fabrication of nipple 1” to 12” ø & up to 24” length 139 c ) erection of nipple 1” to 12”dia & up to24” length 140 a ) dismantling of nipple above 12” dia up to 1 mtr. length 141 b ) fabrication of nipple above 12” dia up to 1 mtr. length 142 c ) erection of nipple above 12” dia up to 1 mtr. length 143 a ) dismantling of bend 1” to 12” dia 144 b ) fabrication of bend 1” to 12” dia 145 c ) erection of bend 1” to 12” dia 146 dismantling , fabrication & erection of bend above 12” below 36” dia 147 dismantling of reducer / tee1” to 12” dia & up to 24” length 148 a ) dismantling of blind 1” to 12” dia 149 b ) fabrication of blind 1” to 12” dia 150 c ) erection of blind 1” to 12” dia 151 a ) dismantling ofabove12” dia 152 b ) fabrication of blind above 12”dia 153 c ) erection of blind above 12” dia 154 a ) dismantling of valve 1” to 12” dia 155 b ) erection of valves 1” to 12” dia 156 c ) dismantling of valve above 12” dia 157 d ) erection of valvesabove 12” dia 158 a ) dismantling of flange 1” to 12” dia 159 b ) fabrication of flange 1” to 12” dia 160 c ) erection of flange above 12” dia 161 dismantling, fabrication & fitting of jet box in m.s. material 162 dismantling, fabrication, fitting of jet box in s smaterial 163 dismantling, fabrication & fitting of nipples 8” to 10” dia for jet box of condenser 164 a ) fabrication of vapour pipe bend 36” to 40” dia 165 b ) dismantling & erection of vapour pipe bend 36” to 40” dia 166 dismantling and erection of existing syrup / molasses / magma pipe lines for their internal / external cleaning. 167 a ) dismantling of vapour pipe 900 mm / 1000 mm dia 168 b ) fabrication of vapour pipe 900 / 1000 mm dia 169 c ) erection of vapour pipe 900 / 1000 mm dia 170 dismantling, fabrication & erection of save all from 10 mm to 12mm platea ) pan 171 b ) quad& vapour cell 172 dismantling, fabrication & erection of save all from 8mm to 10mm ms plate excluding outer shell 173 replacement of j pipe in vapour cell / quad body / pan 174 dismantling, fabrication & erection of umbrellaa ) pan 175 b ) quad& vapour cell 176 dismantling, fabrication & erection of bottom and top cone a ) pan 177 b ) quad & vapour cell 178 c ) juice sulphiter / syrupsulphiterand cone of any other units above 12” dia 179 dismantlingof inter connecting square box for juice heater double beat valve and fabrication, erection with pipe ( modify ) 180 a ) replacement of cooling jacket for the sulphur burning chamber. 181 b ) replacementof sulphur furnace coolingscrubber complete withinternal8” cooling jacket, 6” gas pipe and 4” cooling pipe 182 c ) dismantling, fabrication & erection of cooler made from 8” dia pipe for sulphur furnace 183 dismantling, fabrication & erection of sulphur burning chamber of sulphur furnace 184 dismantling, fabrication & erection of sulphur melt tank 185 dismantling, fabrication & erection of coil for sulphur melter 186 1. lime hopper: fabrication& erection along with connecting valves &pipeswith its drive system etc. 187 2. lifting of lime slacker along with connecting parts up to 2 ft. height suitable for fitting lime hopper. 188 dismantling, fabrication&erection of condenser of vacuum filter 189 dismantling, fabrication & erection of vacuum filtera ) mud trough 190 b ) abgitator 191 replacement of vacuum filter drum complete including connected accessoriesa ) dismantling of existing rvf drum and to be shifted at scrap yard. 192 b ) new rvf drum to be erected at position including connected accessories etc. 193 1 ) dismantling, fabrication & erection of mud scroll / screw conveyor 194 2 ) dismantling, fabrication & erection of mud mixture 195 dismantling, fabrication & erection ofbagacillocyclone 196 dismantlingof angle valves / straight valve a ) size 450 mm to 700 mm 197 size 700 mm to 1000 mm 198 erectionof angle valves / straight valve a ) size 450 mm to 700 mm 199 size 700 mm to 1000 mm 200 patch work at boiling house and c / f house etc. 201 fabrication & erection of mud bootsfor dorr 202 a. replacement of clarifiercenter tube 203 b. replacement of ms scrapper arms of clarifier center tubes. 204 c. replacement of clarifier juice distribution plates 205 a ) replacement of clarifier bottom plate ( compartment ) 206 b ) dismantling, fabrication & erection of clarifier 207 coils in dorr / melter / centrifugal machines / steam coils etc: a ) dismantling 208 b ) fabrication 209 c ) erection 210 dismantling, fabrication and erection of semi kestner bottom nipple 24” dia 211 replacement of quad / vapour cell down take 212 replacement of pan down take 213 patch work of worn our portion of pan / evaporatorbody shell 214 patch work of save all of pan / evaporator bodies 215 patch work of umbrella of pan / evaporator bodies 216 a ) strengthing ofshell with coil type channel with cross by pipe / channel at two places of pan 217 b ) strengthing of umbrella of pan / evaporator bodies 218 dismantling, fabrication & erection of body shell a ) juice sulphitor 219 b ) evaporator bodies 220 c ) pans 221 dismantling, fabrication & erection of bottom / top taper portion ofa ) pans 222 b ) evaporator bodies 223 dismantling of ss tubes of a ) pans 224 b ) evaporator bodies 225 c ) juice heater 226 fitting of ss tubes and to be tested at80 psi hyd. pressure a ) pans 227 b ) evaporator bodies 228 c ) juice heater 229 a ) dismantling of s.s tube of semi kestner 230 b ) fitting of s.s tubes of semi kestner and to be tested 80 psi hyd. pressure 231 dismantling, fabrication and erection of shaft with arms of dry seed crystallizer / vacuum crystallizer. 232 dismantling, fabrication and erection of agitator arms of juice sulphitor / dry seed crystallizer / vacuum crystallizer. 233 replacement of ribbon type stirrer of air cooled crystallizer. 234 crystallizer central shaft with ribbon:a ) dismantling 235 b ) fabrication 236 c ) erection 237 dismantling, fabrication and erection of condensate bottle big size ( from 1.5mtr to 2.0mtr ) 238 dismantling, fabrication and erection of condensate bottle big size ( from 1.0mtr to 1.5mtr ) 239 dismantling, fabrication and erection of segment of pan shell 240 dismantling, fabrication and erection of complete pan shell including sight glass, man hole, provision of key sample, vacuum gauge, ammonia pipes , glass washing pipe, cold water lineconnections and other accessories connectedto body shell, umbrella including welding of m.s. angles for supports etc., top taper cone including connections of washing steam pipes etc., save all including j pipes etc, vapour pipe outletnipple of save all, feed pipe connections etc. 241 vacuum crystallizer / dry seed crystallizer ( i ) dismantling, fabrication & erection of complete shell ( including side plates ) along with dismantling, erection & alignment of complete drive system 242 dismantling, fabrication & erection of complete shell ( excluding vertical side plates ) 243 worm and worm wheel, gland housing of crystallizers: a ) dismantling and erection of existing worm and worm wheel, gear box, motor and alignment work of worm and worm wheel, gear box and motor for satisfactory trial. 244 b ) dismantling and erection of gland housing of crystallizer shaft. 245 s.s bend / tee / reducer / nipple / crossa ) dismantling 246 b ) fabrication 247 c ) erection 248 dismantling, fabrication & erection of manhole with neck flange cover 16” to 24” dia 249 cutting & strengthening of old material 250 dismantling, fabrication & erection of worn out feeding header of pans 251 dismantling, fabrication & erection of central tube with cooling coil ( shaft ) for water cooled crystallizer 40 tons 252 a ) dismantling, fabrication & erection of cooling pipe coil in the crystallizermadefrom 4” dia pipe 253 b ) patch work of crystallizer cooling shaft 254 coils fabricationof coil 255 dismantling & erection of coils 256 dismantling of existing condenser including their venture, tail pipe, bend etc. and thereafterinstallation ofefficient single entry new condensers including fabrication / erection of venture, tail pipe & bends etc. fabrication and erection of base frame and other associated fabrication & erection jobs. 257 dismantling, fabrication & erection of m.s.gutters. 258 replacement of c.i. cone ( venture ) of multijet condenser 259 dismantling c / f machine including water, steam connection and discharge chute 260 dismantling and erection of sugar grader of side plate including modification of structure. 261 hoppers a ) dismantling, fabrication & erection of deck piece & alignments of hopper 262 a ) dismantling, fabrication & erection of hopper piece from deck piece to end of hopper 263 b ) dismantling, fabrication & erection of hopper piece from deck piece to start of hopper including multi trays. 264 dismantling, fabrication & erection of hopper complete with deck piece and multi tray for hot / cold air blower. 265 magma mixera ) dismantling of magma mixer including shaft / arms / drive etc. 266 b ) fabrication of magma mixer including shaft / arms / drive etc. 267 c ) erection of magma mixer including shaft / arms / drive etc. 268 dismantling’ fabrication & erection of molasses gutter for centrifugal machines 269 dismantling and erection of existing syrup / molasses / magma pipe lines for their internal / external cleaning. 270 fabrication of bucket for sugar elevator / dry seed elevator 271 for spray pond a ) fabrication of ss pipe line up to 12” dia from 4 mm thick ss plate 272 a ) fabrication of ss cluster for fitting 2” sized pipes with nozzles ( as fitted in existing clusters ) . 273 threading in 2” dia ss pipe line for fitting nozzles 274 formation of purlin and structure at the height of 20 mtrs approx. with angle size 75x75x6mm and channel size 100x50x5 mm and 200x76x7.5 mm for the fitting of rooftop sheets 275 part b cutting and welding of boiler tubes for cleaning 276 cutting and welding ofheader capsfor cleaningof boiler tubes 277 seamless pipe ½’’to 8’’od & above ( various lengths ) a ) dismantling 278 b ) fabrication 279 c ) erection 280 seamless pipe nippleup to8’’od& above a ) dismantling 281 b ) fabrication 282 c ) erection 283 seamless pipe bendsup to8’’od& above a ) dismantling 284 b ) fabrication 285 c ) erection 286 dismantling, and erection of air heater tubes 63.5 mm od x 8 feet length 287 dismantling, and erection of air heater tubes 63.5 mm od x 16 feet length 288 cutting, welding and fitting ofair heaterold tubes 289 dismantling , fabrication and erection ofair heatercentre tube plate 290 dismantling , fabrication, drilling and erection ofair heatertop and bottom tube plate 291 ibr valveup to36’’oda ) dismantling 292 b ) erection 293 ibr flangea ) dismantling 294 b ) fabrication 295 c ) erection 296 ibr teea ) dismantling 297 b ) fabrication 298 c ) erection 299 reducera ) dismantling 300 b ) fabrication 301 c ) erection 302 boiler drum partition platesa ) dismantling 303 b ) fabrication 304 c ) erection 305 d ) repair 306 boiler drum water seprator a ) dismantling 307 b ) fabrication 308 c ) erection 309 d ) repair 310 boiler wet scrubber seive plate as per drawinga ) dismantling 311 b ) fabrication 312 c ) drilliing 313 d ) erection 314 ibr welding joint...

Punjab State Power Corporation Limited - Punjab

31722605 routine, preventive, breakdown and shutdown maintenance of c and i equipments instruments, measurement and interlock system, annunciation system, flue gas analyzers, steam and water analysis system etc., installed at 2x210mw stage i and 2x250mw stage ii, guru hargobind thermal plant (ghtp), lehra mohabbat...

Vedanta - Punjab

30781941 expression of interest for supply of imported non coking coal, services for road cum rail for co ordination, transportation and liaising with coal company, supply, installation, commissioning, operation and maintenance of 50 mw solar plant, engineering, procurement and construction of wet flue gas desulphurisation system....

Punjab State Power Corporation Limited - Punjab

29475587 e auction catalogue for disposal of 2x210 mw stage i units of ggsstp, pspcl, ropar dismantlement and disposal of decommissioned stage i units of ggsstp, ropar, pspcl, consisting of kwu make 2x210 mw units, including stage i plant & machinery, civil structure, pipe lines, cables, surplus spares of stage –i units etc. (except the listed exclusions). 1. all land belonging to pspcl/taken on lease by it inside and outside the premises of ggsstp, ropar 2. all trees in the vicinity of ggsstp. 3. main plant building of stage i upto structure at column d i.e tg hall and coal bunker area. 4. complete coal handling plant and marshalling yard. 5. fuel oil storage tanks and oil decantation system 6. eot crane of tg hall. 7. flue gas chimney of stage –i units 8. work shop and laboratory equipments 9. boundary wall with all gates and associated fencing. 10. all watch towers and poles being used for lighting purposes. 11. 220 kv substation and 66 kv sub station, its allied equipment/ spares/ consumables and its building etc. 12. dg set building, pakage boiler building, boiler mtc workshop and dm plant building 13. rain water disposal complete system (i.e pit, drainage pipes & motor room etc.) 14. any type of acs (window/split) except central ac system. 15. all types of pcs (except engineering station pc servers). all led screens including led screens in ucbs etc. 16. overhead rcc water supply tank 17. list of minor equipments to be used on stage ii & iii units as per annexure –p 3...

Institute of Nano Science and Technology - Punjab

29435600 annual rate contract for refiling of various analytical gases annual rate contract for refiling of various analytical gases as per nit document attached. , argon gas purity 99.999% , argon gas purity 99.9999% , carbon dioxide per kg gas purity 99.99% , carbon dioxide per kg gas purity 99.999% , carbon dioxide per kg gas purity 99.9999% , nh3 ( ammonia ) gas purity 99.999% , helium gas purity 99.999% , helium gas purity 99.9999% , hydrogen gas purity 99.999% , nitrogen gas purity 99.999% , nitrogen gas purity 99.9999% , oxygen gas purity 99.99% , oxygen gas purity 99.999% , oxygen gas purity 99.9999% , zero air gas purity 99.999% , zero air gas purity 99.9999% , ch4 methane 99.999% , ( argon 90% + hydrogen10 % ) 99.999% , ( argon 95% + hydrogen 05 % ) 99.999% , ( ammonia 10% + helium 90 % ) 99.999% , ethane gas purity 99.999% , ( argon 80% + hydrogen 20 % ) 99.999% , carbon monoxide gas purity 99.97% , flue gas ( 12% co2 + 7% o2 + 1500ppm so2 + 470 ppm nox + balance n2 ) , any other charges, if any ( a ) , any other charges, if any ( b ) , any other charges, if any ( c ) , any other charges, if any ( d ) ...

Department of Cooperation - Punjab

28402506 contract jobs of dismantling, fabrication and erection for the year 2021 22 2 dismentling of m.s. pipe, 1: to 12 dia 3 erection of m.s. pipe 1 to 12 dia 4 fabrication of m.s. pipe line above 12 dia from m.s. plate 5 dismentling of m.s. pipe line above 12 dia 6 erection of m.s. pipe line above 12 dia 7 fabrication of s.s. pipe line 6 to 24 dia from s.s.plate 8 dismentling of s.s. pipe line 6 to 24 dia 9 erection of s.s. pipe line 6 to 24 dia from s.s. plate 10 dismentling of nipple 1 to 12 dia 11 fabrication of nipple 1 to 12 dia 12 erection of nipple 1 to 12 dia 13 dismentling of nipple above 12 dia 14 fabrication of nipple above 12 dia 15 erection of nipple abvoe 12 dia 16 dismentling of bend 1 to 12 dia 17 fabrication of bend 1 to 12 dia 18 erection of bend 1 to 12 dia 19 dismentling, farbication and erection of bend above 12 dia 20 dismentling of reducer / tee 1 to 12 dia 21 fabrication and erection of reducer / tee 1 to 12 dia 22 dismentling of valve 1 to 12 dia 23 erection of valve 1 to 12 dia 24 dismentling of valve above 12 dia 25 erection of valve above 12 dia 26 cutting and fitting of old flanged / blind 1 and above 27 dismantling fabrication and erection of plateform 28 dismantling fabrication and erection of railing 29 replacement of worn out bottom plate of molasses / syrup storage tank 4 sq mtr area approx 30 fabrication of vapour pipe bend 36 to 40 dia 31 dismentling and erection of vapour pipe bend 36 to 40 dia 32 dismentling fabrication and erection of complete umbrella of quad body 33 dismentling fabrication and erection of complete umbrella of pan 34 dismentling fabrication and erection of strainers 35 dismentling fabrication and erection of foundation bed of any type of pumps 36 dismentling of vapour pipe 900 mm / 1000 mm dia 37 fabrication of vapour pipe 900mm / 1000mm dia 38 erection of vapour pipe 900 / 1000 mm dia 39 dismentling fabrication and erection of save all of pans / quads from 8mm to 12mm m.s. plate 40 dismentling fabrication and erection of top cover of save all of pan and quad 41 dismentling fabrication and erection of outer shell of save all of pan and quad 42 dismentling fabrication and erection of inner portion of save all of pan and quad 43 replacement of j pipe in vapour cell / quad body / fan 44 dismentling, farbication and erection of rectangular coil of molasses tank 45 patch work of save all of pan / evaporator bodies 46 patch work of umbralla of pan / evaporator bodies 47 stengthing of umbrella of pan / evaporator bodies 48 dismentling fabrication and erection of complete broken arms of dry seed crystallizer of similar other crystallizers 49 dismentling fabrication and erection of wornout shaft of crystallizer 50 fabrication and erection of distributor in down take of pans 51 replacement of bottom compartment grooves for fitting of rubber strips of juice heaters h.s.a 120m2 52 erection of super heater at centrifugal machine with all existing connections 53 dismentling erection of transient heater with all existing connections 54 dismantling fabrication and erection of injection header size800mm dia 16m long with 10mm plate 55 dismantling of pan body shell from calendria to top cone ( 40 ton ) capacity 56 fabrication and erection of pan body shell from calendria to top cone ( 40 ton ) capacity 57 dismentling, fabrication and erection of top cone of pans 58 replacement of flat / runner side plates ms railing & square bar etc. 59 replacement of runner along with supporting angle / channel for cane carrier chain / rbc / inter carrier chain 60 dismantling fabrication erection of ms plate of cane carrier side plates with supports 61 fabrication & fitting of platform from old scrap material 62 dismantling & erection of ibr pipeline above 6 dia 63 dismantling and erection of ibr valve upto 6” dia 64 dismantling & erection of ibr bends / reducers / nipple upto 6” dia 65 dismantling and erection of ibr valve upto 6” dia 66 fabrication and erection of flanged end observation / cleaning doors for economiser of boiler no. 2 67 dismantling, fabrication , erection of boiler no.2 id fan suction bend of flue gas ducting 68 patchwork of wet scrubber casing / ducting / bottom cone / clarifier 69 dismantling, fabrication erection of fd hot air ducting above furnace area of boiler no.2 with supports / damper , size 16 inch sq. , approx. length 50 feet 70 dismantling, fabrication erection of fd hot air ducting near air heater ash hopper of boiler no. 1 and no.2 with fitting of supports / damper 71 replacement of rbc bottom trough plate etc. 72 dismantling shifting refitting of id fan no. 1 from outside to inside on old foundation 73 fabrication and fitting of id fan suction bend for boiler no.1 74 dismantling and fitting of existing id fan delivery duct from id fan to wet scrubber along with supports etc for boiler no.1 75 patch work of outer front ms plate of chamber near bagasse feeder boiler no. 1 and 2 76 dismantling , fabrication and erection of ms ducting from wet scrubber outlet to chimney for boiler no. 2 77 dismantling , fabrication and erection of ms ducting one meter long at suction of wet scrubber for boiler no. 2 78 dismantling, cleaning, testing, painting and refitting of gilled type economiser elements. no. of elements are 48 no.s. hydraulic test also to be done after fitting of all elements. 79 dismantling, fabrication and erection of perforated plate of wet scrubber for boiler no.1 &2 80 fabrication and erection of staircase at cane unloader along with railing, platform etc. 81 dismentling, fabrication and erection of broken arm / ribbon of any crystalizer 82 replacement of old brass / ss tubes of with new ss tubes of second body of quad by dismantling, fitting and expansion of tubes, ( approx. quantity of tubes : 1100 no.s ) hydraulic testing after replacement of tubes 83 replacement of old brass / ss tubes of with new ss tubes of quad / vapour cell ( other than second body of quod ) by dismantling, fitting and expension of tubes 84 replacement of ss tube of juice heaters / vljh by dismantling, fitting and expension of tubes 85 replacement of brass / ss tube of any pan by dismantling, fitting and expension of tubes...

Department of Cooperation - Punjab

28066400 contract jobs of dismantling, fabrication and erection for the year 2021 22 1 contract jobs of dismentaling, fabrication and erection 2 dismentling of m.s. pipe, 1: to 12 dia 3 erection of m.s. pipe 1 to 12 dia 4 fabrication of m.s. pipe line above 12 dia from m.s. plate 5 dismentling of m.s. pipe line above 12 dia 6 erection of m.s. pipe line above 12 dia 7 fabrication of s.s. pipe line 6 to 24 dia from s.s.plate 8 dismentling of s.s. pipe line 6 to 24 dia 9 erection of s.s. pipe line 6 to 24 dia from s.s. plate 10 dismentling of nipple 1 to 12 dia 11 fabrication of nipple 1 to 12 dia 12 erection of nipple 1 to 12 dia 13 dismentling of nipple above 12 dia 14 fabrication of nipple above 12 dia 15 erection of nipple abvoe 12 dia 16 dismentling of bend 1 to 12 dia 17 fabrication of bend 1 to 12 dia 18 erection of bend 1 to 12 dia 19 dismentling, farbication and erection of bend above 12 dia 20 dismentling of reducer / tee 1 to 12 dia 21 fabrication and erection of reducer / tee 1 to 12 dia 22 dismentling of valve 1 to 12 dia 23 erection of valve 1 to 12 dia 24 dismentling of valve above 12 dia 25 erection of valve above 12 dia 26 cutting and fitting of old flanged / blind 1 and above 27 dismantling fabrication and erection of plateform 28 dismantling fabrication and erection of railing 29 replacement of worn out bottom plate of molasses / syrup storage tank 4 sq mtr area approx 30 fabrication of vapour pipe bend 36 to 40 dia 31 dismentling and erection of vapour pipe bend 36 to 40 dia 32 dismentling fabrication and erection of complete umbrella of quad body 33 dismentling fabrication and erection of complete umbrella of pan 34 dismentling fabrication and erection of strainers 35 dismentling fabrication and erection of foundation bed of any type of pumps 36 dismentling of vapour pipe 900 mm / 1000 mm dia 37 fabrication of vapour pipe 900mm / 1000mm dia 38 erection of vapour pipe 900 / 1000 mm dia 39 dismentling fabrication and erection of save all of pans / quads from 8mm to 12mm m.s. plate 40 dismentling fabrication and erection of top cover of save all of pan and quad 41 dismentling fabrication and erection of outer shell of save all of pan and quad 42 dismentling fabrication and erection of inner portion of save all of pan and quad 43 replacement of j pipe in vapour cell / quad body / fan 44 dismentling, farbication and erection of rectangular coil of molasses tank 45 patch work of save all of pan / evaporator bodies 46 patch work of umbralla of pan / evaporator bodies 47 stengthing of umbrella of pan / evaporator bodies 48 dismentling fabrication and erection of complete broken arms of dry seed crystallizer of similar other crystallizers 49 dismentling fabrication and erection of wornout shaft of crystallizer 50 fabrication and erection of distributor in down take of pans 51 replacement of bottom compartment grooves for fitting of rubber strips of juice heaters h.s.a 120m2 52 erection of super heater at centrifugal machine with all existing connections 53 dismentling erection of transient heater with all existing connections 54 dismantling fabrication and erection of injection header size800mm dia 16m long with 10mm plate 55 dismantling of pan body shell from calendria to top cone ( 40 ton ) capacity 56 fabrication and erection of pan body shell from calendria to top cone ( 40 ton ) capacity 57 dismentling, fabrication and erection of top cone of pans 58 replacement of flat / runner side plates ms railing & square bar etc. 59 replacement of runner along with supporting angle / channel for cane carrier chain / rbc / inter carrier chain 60 dismantling fabrication erection of ms plate of cane carrier side plates with supports 61 fabrication & fitting of platform from old scrap material 62 dismantling & erection of ibr pipeline above 6 dia 63 dismantling and erection of ibr valve upto 6” dia 64 dismantling & erection of ibr bends / reducers / nipple upto 6” dia 65 dismantling and erection of ibr valve upto 6” dia 66 fabrication and erection of flanged end observation / cleaning doors for economiser of boiler no. 2 67 dismantling, fabrication , erection of boiler no.2 id fan suction bend of flue gas ducting 68 patchwork of wet scrubber casing / ducting / bottom cone / clarifier 69 dismantling, fabrication erection of fd hot air ducting above furnace area of boiler no.2 with supports / damper , size 16 inch sq. , approx. length 50 feet 70 dismantling, fabrication erection of fd hot air ducting near air heater ash hopper of boiler no. 1 and no.2 with fitting of supports / damper 71 replacement of rbc bottom trough plate etc. 72 dismantling shifting refitting of id fan no. 1 from outside to inside on old foundation 73 fabrication and fitting of id fan suction bend for boiler no.1 74 dismantling and fitting of existing id fan delivery duct from id fan to wet scrubber along with supports etc for boiler no.1 75 patch work of outer front ms plate of chamber near bagasse feeder boiler no. 1 and 2 76 dismantling , fabrication and erection of ms ducting from wet scrubber outlet to chimney for boiler no. 2 77 dismantling , fabrication and erection of ms ducting one meter long at suction of wet scrubber for boiler no. 2 78 dismantling, cleaning, testing, painting and refitting of gilled type economiser elements. no. of elements are 48 no.s. hydraulic test also to be done after fitting of all elements. 79 dismantling, fabrication and erection of perforated plate of wet scrubber for boiler no.1 &2 80 fabrication and erection of staircase at cane unloader along with railing, platform etc. 81 dismentling, fabrication and erection of broken arm / ribbon of any crystalizer 82 replacement of old brass / ss tubes of with new ss tubes of second body of quad by dismantling, fitting and expansion of tubes, ( approx. quantity of tubes : 1100 no.s ) hydraulic testing after replacement of tubes 83 replacement of old brass / ss tubes of with new ss tubes of quad / vapour cell ( other than second body of quod ) by dismantling, fitting and expension of tubes 84 replacement of ss tube of juice heaters / vljh by dismantling, fitting and expension of tubes 85 replacement of brass / ss tube of any pan by dismantling, fitting and expension of tubes...

Department of Cooperation - Punjab

27910822 fabrication and erection jobs 1 repair of cane unloader grab arms 2 replacement of sq. bar of cane unloader. 3 fabrication & erection of hydraulic grab of unloader complete. 4 dismantling, fabrication and erection of a ) mincer hood 5 b ) cutter hood 6 c ) chopper hood 7 replacement of cane cutting knives of cutters 8 replacement of cane cutting knives of mincer 9 replacement of hammers of mincer 10 replacement of domite tips of mincer 11 to build mill top rollers square end as per standard size 12 to build mill rollers crown pinion teeth as per standard template of teeth. 13 to build mill rollers coupling square section as per standard size 14 to build mill rollers journal as per standard size 15 to build mill under feeder rollers drive gear teeth as per standard template of teeth 16 fabrication and erection of mill rollers crown pinion guard 17 fabrication and erection of donnelly chute of mills 18 dismantling, fabrication and erection of worn out juice tray at mill house from 10 / 12 mm plate 19 dis. feb. & erection of mill house screw conveyor 20 dis. feb. & erection of mill house screw conveyor trough along with dismantling and fitting of conveyor and drive system. 21 dismantling and erection of worn out runners of cane carrier, rbc, bagasse elevator and inter carrier. 22 dismantling, fabrication and erection of worn out side plates of cane carrier, rbc, bagasse elevator and inter carrier. 23 dismantling, fabrication and erection of worn out trough of rbc, bagasse elevator & rack carriers from a ) ms plate 6 / 8 mm 24 b ) ss plate 4 / 5 mm 25 dismantling fabrication and erection structure of cane carrier drive , rbc chain drive, rake carrier and elevator chain drive 26 replacement of worn out bottom boot of intercarrier chain / secondary chain 27 replacement of angle and channel of cane carrier / rbc / rack carrier & elevator . 28 repair of secondary cane carrier chain and elevator chain rake 29 fabrication of secondary cane carrier chain and elevator chain rake 30 fabrication of rbc slates 31 repair of rbc slates 32 dis. and erection of bagassecillow blower 33 fabrication of bagassecillow blower 34 dismantling and erection of boiler bagasse feeding ci furnace mouth piece of wil make boiler. 35 dismantling and erection of boiler bagasse feeding ci furnace chute 36 replacement of furnace door frame of wil make boiler & texmaco make boiler 37 replacement of furnace door of wil make boiler & texmaco make boiler 38 repair and fitting of furnace door frame of wil make boiler& texmaco make boiler 39 repair and fitting of furnace door of wil make boiler& texmaco make boiler 40 replacement of furnace chamber door frame of wil make boiler & texmaco make boiler 41 replacement of furnace chamber door of wil make boiler & texmaco make boiler 42 repair and fitting of furnace chamber door of wil make boiler& texmaco make boiler 43 repair and fitting of furnace chamber door frame of wil make boiler& texmaco make boiler 44 dismatling of boiler dampers 45 dismatling of boiler dampers 46 dismatling of boiler dampers 47 dismatling of boiler dampers 48 repair of id fan of wil and texmaco make boiler 49 repair of fd fan of wil and texmaco make boiler 50 dismantling, fabrication and erection of boiler bagasse feeding ms chute between boiler furnance and rbc chain 51 patch work 52 dis, feb, & errection of boiler flue gas ducting between fd fan, id fan& chimney. 53 dismantling, fabrication & erection of bend of boiler flue gas ducting between id fan and chimney from 6 / 8mm thick plate. 54 dismantling, fabrication & erection of side plate & top plates ( 4mm ) of boilers. 55 dismantling, fabrication & erection economiser top & side plates 56 dismantling, fabrication & erection air heater top & side plates 57 dismantling and fitting of gi / acc sheet. a ) dismantling 58 b ) fitting 59 dismantling of machinery structure. 60 fabrication and erection of machinery structure. 61 dismantling & erection of fd fan casing 62 fabrication of fd fan casing 63 repair of fd fan casing 64 dismantling & erection of id fan casing 65 fabrication of id fan casing 66 repair of id fan casing 67 dismantling, fabrication & erection ( a ) pump and motor bed 68 b ) motor and radicon 69 c ) cutter motor bed 70 dismantling fabrication and erection of wet scrubber cone 71 dismantling fabrication and erection of wet scrubber side plates 72 dismantling fabrication and erection of clarifier cone of boiler 73 dismantling fabrication and erection of man hole 74 dismantling fabrication and erection of man hole blind 75 fabrications mill roller bearing cover 76 dismantling of structure 77 fabrication of structure 78 erection of structure 79 disnatling of platforms plates 80 fabrication platforms plates 81 erection of platforms plates 82 dismantling of railing 83 fabrication & erection of railing 84 a ) dismantling, loading & shifting of following material from zira sugar mill 1.mill reversing redicon with motor 01 set 85 2.mill reversing redicon with motor 01 set 86 3. gun metal liner 10 nos 87 4.ibr valves ( different sizes ) 20 nos. 88 5. batch type centrifugal machine ( 1 ton ) with motor, structure and panel 02 set 89 6. head and tail shaft with plummer block and sprocket a ) cane carrier 01 set 90 b ) secondary carrier 01 set 91 c ) bagasse elevator 01 set 92 d ) rbc 01 set 93 7. m.s structure ( angle, channel, beam ) 10 tons 94 8. seamless pipe ( different sizes ) 150 mtrs 95 9. exhaust / vapour pipe line ( different sizes ) 100 mtrs 96 10. cane carrier, rbc runner with channel 250 mtrs 97 11. chequered plate 04 tons 98 12. bagacillo blower with motor 01 no. 99 13.alternator ( 2.5 mw ) radiator 03 nos. 100 14.turbine cooler 1.5 mw 02 nos. 101 15.mill turbine cooler 01 no. 102 16.bagasse feeder with radicon and motor 03 sets 103 b ) loading & shifting of following material from zira sugar mill a ) air circuit breaker 600a / 800a 03 nos. 104 b ) submersible pump with motor 02 nos 105 c ) feed pump 65 / 6 01 no. 106 d ) welding set 03 nos. 107 e ) vacuum pump 01 no. 108 f ) mccb 60a / 800 amp 02 nos. 109 g ) hrc fuse of different sizes 100 nos. 110 h ) motors a. 15 hp 1440 rpm 02 nos. 111 b. 20 hp 960 rpm 02 nos. 112 c. 20 hp 1440 rpm 02 nos. 113 d. 50 hp 960 rpm 01 no. 114 c ) dismantling, loading & shifting of following material from bhougpur sugar mill 1. centrifugal machine with motor structure & panel – 01 set 115 2. condenser 03 nos. 116 3. megma pump & vacumm pump – 02 nos 117 4. continuous machine with motor, panel and structure 02 nos. 118 power house 1.fabrication & erection of cable tray 119 2.replacement of thimble ( any size ) 120 3.checking of cable connections, cleaning of thimbles and reconnection 121 4.replacement of switches / mccb 630 amp / 400amp / 250 amp 122 5.replacement / erection of changeover switch 630amp / 400amp / 250 amp 123 6 ) overhauling of spare electrical motors a ) 0 50 hp 124 b ) above 50 hp 125 c ) three speed motors 126 d ) 150 hp motor 01 no. 127 e ) unloader motor 15 hp 02 nos. 128 f ) four speed motor 04 nos. 129 7. laying & connection of power & control cables from main panels to remote box and motor 03 no. jobs 130 8.dismantling of existing three speed electrical panel 131 9.erection of new four speed panel 132 a. extension juice tray of mill no. 1 133 b. extension juice tray of mill no. 2 134 fabrication and erection of ms stairs with railing 135 fabrication & fitting of stationary knives structure with knives 136 mill pinion guard ( bottom ) 137 open gear guard ( bottom ) of all chain 138 fabrication of motor protection cover 139 fabrication of shed ( any size ) with structure 140 repair of dsm screen 141 dismantling and refitting of mill no. 1 head stock after repair of foundation and supporting of base plate ( civil work done by mill 142 rcc drilling between mill no 1 & 2 143 fabrication and erection of ms box additional supporting between mill no – 1 head stock with mill no 2 head stock 144 repair of fmg oil tank leakage 145 dismantling of m.s. round / square tanks 146 fabrication of m.s. round square tanks 147 erection of m s round / square tanks 148 dismantling of m.s. / g.i. / c.i. / ss / rmp pipe from 1” to 12” dia 149 erect ion of ms / gi / ci / ss / rmp pipe 1” to 12” dia 150 fabrication of m s / ss pipe line above 12” dia from m.s. / ss plate 151 dismantling of m.s. / ss / c.i. pipe line above 12” dia 152 erection of m.s. / c.i pipe line above 12” dia 153 a ) dismantling of nipple 1” to 12” dia up to 24” length 154 b ) fabrication of nipple 1” to 12” ø & up to 24” length 155 c ) erection of nipple 1” to 12”dia & up to 24” length 156 a ) dismantling of nipple above 12” dia up to 1 mtr. length 157 b ) fabrication of nipple above 12” dia up to 1 mtr. length 158 c ) erection of nipple above 12” dia up to 1 mtr. length 159 a ) dismantling of bend 1” to 12” dia 160 b ) fabrication of bend 1” to 12” dia 161 c ) erection of bend 1” to 12” dia 162 dismantling , fabrication & erection of bend above 12” below 36” dia 163 dismantling of reducer / tee 1” to 12” dia & up to 24” length 164 a ) dismantling of blind 1” to 12” dia 165 b ) fabrication of blind 1” to 12” dia 166 c ) erection of blind 1” to 12” dia 167 a ) dismantling of above12” dia 168 b ) fabrication of blind above 12”dia 169 c ) erection of blind above 12” dia 170 a ) dismantling of valve 1” to 12” dia 171 b ) erection of valves 1” to 12” dia 172 c ) dismantling of valve above 12” dia 173 d ) erection of valves above 12” dia 174 a ) dismantling of flange 1” to 12” dia 175 b ) fabrication of flange 1” to 12” dia 176 c ) erection of valve above 12” dia 177 dismantling, fabrication & fitting of jet box in m.s. material 178 dismantling, fabrication, fitting of jet box in s s material 179 dismantling, fabrication & fitting of nipples 8” to 10” dia for jet box of condenser 180 a ) fabrication of vapour pipe bend 36” to 40” dia 181 b ) dismantling & erection of vapour pipe bend 36” to 40” dia 182 erection of m s round / square tanks 183 dismantling and erection of existing syrup / molasses / magma pipe lines for their internal / external cleaning. 184 a ) dismantling of vapour pipe 900 mm / 1000 mm dia 185 b ) fabrication of vapour pipe 900 / 1000 mm dia 186 c ) erection of vapour pipe 900 / 1000 mm dia 187 dismantling, fabrication & erection of save all from 10 mm to 12mm plate a ) pan 188 b ) quad & vapour cell 189 dismantling, fabrication & erection of save all from 8mm to 10mm ms plate excluding outer shell 190 replacement of j pipe in vapour cell / quad body / pan 191 dismantling, fabrication & erection of umbrella a ) pan 192 b ) quad & vapour cell 193 dismantling, fabrication & erection of bottom and top cone a ) pan 194 b ) quad & vapour cell 195 c ) juice sulphiter / syrup sulphiter and cone of any other units above 12” dia 196 dismantling of inter connecting square box for juice heater double beat valve and fabrication, erection with pipe ( modify ) 197 a ) replacement of cooling jacket for the sulphur burning chamber. 198 b ) replacement of sulphur furnace cooling scrubber complete with internal 8” cooling jacket, 6” gas pipe and 4” cooling pipe 199 c ) dismantling, fabrication & erection of cooler made from 8” dia pipe for sulphur furnace 200 dismantling, fabrication & erection of sulphur burning chamber of sulphur furnace 201 dismantling, fabrication & erection of sulphur melt tank 202 dismantling, fabrication & erection of coil for sulphur melter 203 1. lime hopper: fabrication & erection along with connecting valves &pipes with its drive system etc. 204 2. lifting of lime slacker along with connecting parts up to 2 ft. height suitable for fitting lime hopper. 205 dismantling, fabrication & erection of condenser of vacuum filter 206 dismantling, fabrication & erection of vacuum filter a ) mud trough 207 b ) abgitator 208 replacement of vacuum filter drum complete including connected accessories a ) dismantling of existing rvf drum and to be shifted at scrap yard. 209 b ) new rvf drum to be erected at position including connected accessories etc. 210 1 ) dismantling, fabrication & erection of mud scroll / screw conveyor 211 2 ) dismantling, fabrication & erection of mud mixture 212 dismantling, fabrication & erection of bagacillo cyclone 213 dismantling of angle valves / straight valve a ) size 450 mm to 700 mm 214 size 700 mm to 1000 mm 215 erection of angle valves / straight valve a ) size 450 mm to 700 mm 216 size 700 mm to 1000 mm 217 patch work at boiling house and c / f house etc. 218 fabrication & erection of mud boots for dorr 219 a. replacement of clarifier center tube 220 b. replacement of ms scrapper arms of clarifier center tubes. 221 c. replacement of clarifier juice distribution plates 222 a ) replacement of clarifier bottom plate ( compartment ) 223 b ) dismantling, fabrication & erection of clarifier 224 coils in dorr / melter / centrifugal machines / steam coils etc: a ) dismantling 225 b ) fabrication 226 c ) erection 227 dismantling, fabrication and erection of semi kestner bottom nipple 24” dia 228 replacement of quad / vapour cell down take 229 replacement of pan down take 230 patch work of worn our portion of pan / evaporator body shell 231 patch work of save all of pan / evaporator bodies 232 patch work of umbrella of pan / evaporator bodies 233 a ) strengthing of shell with coil type channel with cross by pipe / channel at two places of pan 234 b ) strengthing of umbrella of pan / evaporator bodies 235 dismantling, fabrication & erection of body shell a ) juice sulphitor 236 b ) evaporator bodies 237 c ) pans 238 dismantling, fabrication & erection of bottom / top taper portion of a ) pans 239 b ) evaporator bodies 240 dismantling of ss tubes of a ) pans 241 b ) evaporator bodies 242 c ) juice heater 243 fitting of ss tubes and to be tested at 80 psi hyd. pressure a ) pans 244 b ) evaporator bodies 245 c ) juice heater 246 a ) dismantling of s.s tube of semi kestner 247 b ) fitting of s.s tubes of semi kestner and to be tested 80 psi hyd. pressure 248 dismantling, fabrication and erection of shaft with arms of dry seed crystallizer / vacuum crystallizer. 249 dismantling, fabrication and erection of agitator arms of juice sulphitor / dry seed crystallizer / vacuum crystallizer. 250 replacement of ribbon type stirrer of air cooled crystallizer. 251 crystallizer central shaft with ribbon: a ) dismantling 252 b ) fabrication 253 c ) erection 254 dismantling, fabrication and erection of condensate bottle big size ( from 1.5mtr to 2.0mtr ) 255 dismantling, fabrication and erection of condensate bottle big size ( from 1.0mtr to 1.5mtr ) 256 dismantling, fabrication and erection of segment of pan shell 257 dismantling, fabrication and erection of complete pan shell including sight glass, man hole, provision of key sample, vacuum gauge, ammonia pipes , glass washing pipe, cold water line connections and other accessories connected to body shell, umbrella including welding of m.s. angles for supports etc., top taper cone including connections of washing steam pipes etc., save all including j pipes etc, vapour pipe outlet nipple of save all, feed pipe connections etc. 258 vacuum crystallizer / dry seed crystallizer ( i ) dismantling, fabrication & erection of complete shell ( including side plates ) along with dismantling, erection & alignment of complete drive system 259 dismantling, fabrication & erection of complete shell ( excluding vertical side plates ) 260 worm and worm wheel, gland housing of crystallizers: a ) dismantling and erection of existing worm and worm wheel, gear box, motor and alignment work of worm and worm wheel, gear box and motor for satisfactory trial. 261 b ) dismantling and erection of gland housing of crystallizer shaft. 262 s.s bend / tee / reducer / nipple / cross a ) dismantling 263 b ) fabrication 264 c ) erection 265 dismantling, fabrication & erection of manhole with neck flange cover 16” to 24” dia 266 cutting & strengthening of old material 267 dismantling, fabrication & erection of worn out feeding header of pans 268 dismantling, fabrication & erection of central tube with cooling coil ( shaft ) for water cooled crystallizer 40 tons 269 a ) dismantling, fabrication & erection of cooling pipe coil in the crystallizer made from 4” dia pipe 270 b ) patch work of crystallizer cooling shaft 271 coils fabrication of coil 272 dismantling & erection of coils 273 dismantling of existing condenser including their venture, tail pipe, bend etc. and thereafter installation of efficient single entry new condensers including fabrication / erection of venture, tail pipe & bends etc. fabrication and erection of base frame and other associated fabrication & erection jobs. 274 dismantling, fabrication & erection of m.s. gutters. 275 replacement of c.i. cone ( venture ) of multijet condenser 276 dismantling c / f machine including water, steam connection and discharge chute 277 dismantling of continuous c / f machine 278 erection of continuous c / f machine with structure complete in all respect 279 dismantling of batch type c / f machine 280 2. erection of batch type c / f machine ( 750 kg / 01 ton ) along with its accessories and structure complete in all respect. 281 3. overhauling / repair of batch type centrifugal machine ( 1ton ) 02 nos. ( spares will be provided by mill ) 282 4. shifting and adjustment of pug mill with structure, gearbox and motor. 283 5.fabrication, installation of masc.chut with two 10’’ / 12’’ butterfly valves 03 nos. 284 6. fabrication, installation of a heavy / a light molasses separator with 2 nos. butterfly valves 6’’ 285 7.fabrication and erection of bottom chute 286 dismantling of old transient heater & erection of new transient heater along with its accessories. 287 erection c / f machine including water, steam connection and discharge chute including modification of staging / structure 288 dismantling and erection of sugar grader of side plate including modification of structure. 289 dismantling, fabrication and erection of circular bottom portion of magma mixer. 290 fabrication and erection of complete casing having outer dia for circular portion 32” approx as existing exhaust blower of batch type centrifugal machines. 291 hoppers a ) dismantling, fabrication & erection of deck piece & alignments of hopper 292 a ) dismantling, fabrication & erection of hopper piece from deck piece to end of hopper 293 b ) dismantling, fabrication & erection of hopper piece from deck piece to start of hopper including multi trays. 294 dismantling, fabrication & erection of hopper complete with deck piece and multi tray for hot / cold air blower. 295 magma mixer a ) dismantling of magma mixer including shaft / arms / drive etc. 296 b ) fabrication of magma mixer including shaft / arms / drive etc. 297 c ) erection of magma mixer including shaft / arms / drive etc. 298 dismantling’ fabrication & erection of molasses gutter for centrifugal machines 299 dismantling and erection of existing syrup / molasses / magma pipe lines for their internal / external cleaning. 300 fabrication of bucket for sugar elevator / dry seed elevator 301 for spray pond a ) fabrication of ss pipe line up to 12” dia from 4 mm thick ss plate 302 a ) fabrication of ss cluster for fitting 2” sized pipes with nozzles ( as fitted in existing clusters ) . 303 threading in 2” dia ss pipe line for fitting nozzles 304 formation of purlin and structure at the height of 20 mtrs approx. with angle size 75x75x6mm and channel size 100x50x5 mm and 200x76x7.5 mm for the fitting of rooftop sheets 305 aluminum panel for electrical cabin 306 part b cutting and welding of boiler tubes for cleaning 307 cutting and welding of header caps for cleaning of boiler tubes 308 seamless pipe ½’’to 8’’od & above ( various lengths ) a ) dismantling 309 b ) fabrication 310 c ) erection 311 seamless pipe nipple up to 8’’od & above a ) dismantling 312 b ) fabrication 313 c ) erection 314 seamless pipe bends up to 8’’od & above a ) dismantling 315 b ) fabrication 316 c ) erection 317 dismantling, and erection of air heater tubes 63.5 mm od x 18 feet length 318 cutting, welding and fitting of air heater old tubes 319 dismantling , fabrication and erection of air heater centre tube plate 320 ibr valve up to 36’’od a ) dismantling 321 b ) erection 322 ibr flange a ) dismantling 323 b ) fabrication 324 c ) erection 325 ibr tee a ) dismantling 326 b ) fabrication 327 c ) erection 328 reducer a ) dismantling 329 b ) fabrication 330 c ) erection 331 boiler drum partition plates a ) dismantling 332 b ) fabrication 333 c ) erection 334 d ) repair 335 boiler drum water seprator a ) dismantling 336 b ) fabrication 337 c ) erection 338 d ) repair 339 boiler wet scrubber seive plate as per drawing a ) dismantling 340 b ) fabrication 341 c ) drilliing 342 d ) erection 343 ibr welding joint...

Punjab Biotechnology Incubator - Punjab

27897286 supply, installation, testing & commissioning laboratory equipment, microwave digestion system (mds), ph & conductivity meter, flue gas analyser...

Punjab State Power Corporation Limited - Punjab

27681015 routine/ preventive , breakdown and shutdown maintenance of ci equipments/instruments , measurement and interlock system , annunciation system , flue gas analyzers , steam and water analysis system , etc , installed at stage i and ii , ghtp , lehra mohabbat...

Dr Br Ambedkar National Institute Of Technology - Punjab

25762506 purchase of flue gas analyzer , supply of the equipment/material/software , flue gas analyzer ( strictly as per specifications mentioned in tender document . the equipment must be supplied alongwith all necessary/required accessories as per tender specifications ) ...

Punjab State Power Corporation Limited - Punjab

25560357 design, engineering, manufacture, shop fabrication, preassembly, shop testing/type testing at manufacturer’s works, packing, transportation, unloading, handling and conservation of equipment at site, complete services of construction including erection, supervision, pre commissioning, commissioning and performance testing of equipments under bidder’s scope of work of dry sorbent injection (dsi) system using sodium bicarbonate as reagent and its associated auxiliaries including all associated electrical, control & instrumentation, civil, structural and architecture works as detailed in tender specifications for flue gas desulphurisation (fgd) system package at 4x 210 mw units(stage ii & iii) of ggsstp, roopnagar...

Punjab State Power Corporation Limited - Punjab

24493789 design, engineering, manufacture, shop fabrication, preassembly, shop testing/type testing at manufacturer’s works, packing, transportation, unloading, handling and conservation of equipment at site, complete services of construction including erection, supervision, pre commissioning, commissioning and performance testing of equipments under bidder’s scope of work of dry sorbent injection (dsi) system using sodium bicarbonate as reagent and its associated auxiliaries including all associated electrical, control & instrumentation, civil, structural and architecture works as detailed in tender specifications for flue gas desulphurisation (fgd) system package at 4x 210 mw units(stage ii & iii) of ggsstp, roopnagar....

Department of Cooperation - Punjab

24320429 tender for fabrication and erection jobs 1 dismantling of m.s./g.i./ c.i./ ss / rmp pipe from 1” to 12” dia 2 erection of ms/gi/ci/ss/ rmp pipe 1” to 12” dia 3 dismantling of m.s. / ss/c.i. pipe line above 12” dia 4 fabrication & erection of m s / ss pipe line above 12” dia from m.s. / ss plate 5 erection of c.i pipe line above 12” dia 6 fabrication & erection of nipple 1” to 12” 7 fabrication & erection of nipple above 12’’ dia 8 fabrication & erection of bend 1” to 12” 9 fabrication & erection of bend above 12’’ dia 10 dismantling of reducer/tee 1” to 12” dia 11 a) dis,fab & erection of blind 1” to 12” dia 12 a) dis,fab & erection of blind above 12” dia 13 a) dis,fab & erection of valve 14 cutting & washing of old flange 15 dismantling of structure/platform 16 fabrication & erection of structure/platforms 17 dis & erection of railing 18 dismantling of m.s. round/square/conical bottom tanks 19 fabrication& erection of m.s. round/ square /conical bottom tanks 20 dismantling, fabrication & erection of suction strainer of spray pump / injection pump 21 dismantling, fabrication & erection of manhole with neck flange cover 22 cutting & strengthening of old material 23 dismantling,fabri & erection of coils 24 dismantling, fabrication & erection of m.s. gutters. 25 fabrication of flange from m.s. plate with drill 26 dismantling & erection of angle valves size 450 mm & above 27 dismantling fabrication and erection of foundation bed of pumps/gear box with their drives 28 patch work at mill house ,boiling house and c/f house etc. 29 dismantling, fabrication & erection of grab of unloader complete. 30 fabrication & erection of grab arm 31 dismantling fabrication and erection of grab box of unloader 32 dismantling, fabrication & erection of unloader bridge rail 33 dismantling, fabrication & erection of sq. bar of cane unloader. 34 dismantling and erection of worn out runners of cane carrier, rbc, bagasse elevator and inter carrier 35 dismantling and erection of worn out angle and channels of runners of cane carrier, rbc, bagasse elevator and inter carrier 36 dismantling, fabrication and erection of worn out trough of rbc, bagasse elevator & rack carriers from a) m s plate 6/8 mm 37 b) s s plate 4/5 mm 38 dismantling, fabrication and erection of worn out side plate of cane carrier & rack carriers from a) m s plate 6/8 mm 39 b) s s plate 4/5 mm 40 fabrication of rake for rake carrier 41 dis. feb. & erection of rack carrier trough tail end side complete 42 dis. feb. & erection of rack carrier trough tail or rear end side complete 43 fabrication and erection of donnelly chute of rack carrier 44 dismantling fabrication and erection structure of cane carrier drive 45 dismantling, fabrication and erection of a) mincer hood 46 b) cutter hood 47 c) chopper hood 48 dismantling, fabrication and erection of worn out juice tray at mill house from 10/12 mm plate 49 dis. feb. & erection of mill house screw conveyor 50 dis. feb. & erection of mill house screw conveyor trough 51 dismantling, fabrication and erection of economiser side plates and top plates (from 6 mm plate) 52 dis,feb,& erection of boiler flue gas ducting between boiler & chimney (from 6mm/8mm plate.) 53 dismantling, fabrication & erection of bend of boiler flue gas ducting between boiler and chimney ( from 6/8mm thick plate.) 54 dismantling and erection of boiler bagasse feeding ci mouth piece. 55 dismantling ,fabrication and erection of new wet scrubber 56 dismantling & erection of wet scrubber of sieve plate 57 dismantling ,fabrication and erection of worn out plate of wet scrubber 58 dismantling ,fabrication and erection of worn out plate of feed tank(from 10 mm plate) 59 dismantling ,fabrication and erection of feed tank(from 10 mm plate) 60 dis. & erection of fd and id fan casing 61 fabrication of fd and id fan casing 62 dis. fabrication and erection of bagasse cillow blower 63 dismantling & erection of boilers furnace c.i door frame and door. 64 dismantling .feb & erection of dampers of boilers 65 dismantling .feb & erection of bagasse feeder dampers 66 patch work of worn our portion of pan / evaporator body shell 67 patch work of save all & umbrella of pan / evaporator bodies 68 dismantling, fabrication & erection of de super heater coils 69 dismantling fabrication and erection of inter connecting square box for juice heater double beat valve 70 dismantling, fabrication & erection of mud scroll / screw conveyor 71 dismantling, fabrication & erection of bagacillo cyclone 72 dismantling ,fabrication &erection of stone catcher strainer 73 dismantling, fabrication & erection of save all from 10 mm to 12mm ms plate a) pan 74 b) quad & vapour cell 75 dismantling, fabrication & erection of umbrella a) pan 76 b) quad & vapour cell 77 dismantling, fabrication & erection of bottom and top cone a) pan 78 b) quad & vapour cell 79 c) juice sulphiter / syrup sulphiter and cone of any other units above 12” dia 80 a) replacement of cooling jacket for the sulphur burning chamber 81 b) replacement of sulphur furnace cooling scrubber complete with internal 8” cooling jacket, 6” gas pipe and 4” cooling pipe 82 c) dismantling, fabrication & erection of cooler made from 8” dia pipe for sulphur furnace 83 dismantling, fabrication & erection of sulphur burning chamber of sulphur furnace(satwik type) 84 dismantling, fabrication & erection of sulphur melt tank 85 dismantling, fabrication & erection of coil for sulphur melter 86 dismantling, fabrication & erection of condenser of vacuum filter 87 dismantling, fabrication & erection of vacuum filter a) mud trough 88 b) agitator 89 fabrication & erection of mud boots for dorr 90 a. replacement of clarifier center tube 91 b. replacement of ms scrapper arms of clarifier center tubes. 92 c. replacement of clarifier juice distribution plates 93 replacement of clarifier bottom plate complete 94 replacement of clarifier bottom plate complete 95 vapour cell a) dismantling of vapour cell tube plate 96 b) erection of vapour cell tube plate 97 dismantling, fabrication & erection of calendria shell of vapour cell with 12 mm m.s. plates. 98 dismantling and erection of semi kestner top/ bottom saucer for its tube replacement 99 replacement of quad / vapour cell down take 100 strengthing of umbrella of pan / evaporator bodies 101 dismantling, fabrication & erection of body shell a) juice sulphitor 102 b) evaporator bodies 103 c) pan 104 dismantling of brass/ss tubes of a) pans 105 b) evaporator bodies 106 c) juice heater 107 d) semi kestner 108 fitting of brass/ss tubes and to be tested at 80 psi hyd. pressure a) pans 109 b) evaporator bodies 110 c) juice heater 111 d) semi kestner 112 dismantling, fabrication and erection of flash tank for juice clarifier. 113 replacement of worn out compartment plate& square grooves of juice heaters a) damaged top compartment plates 114 b) damaged bottom compartment plates 115 juice heater covers a) dismantling and erection of top cover of juice heater. 116 b) dismantling and erection of bottom covers of juice heater. 117 strengthening of pan /quad shell with ms angle an channel(circular type ms channel and cross by angle 118 replacement of j pipe in vapour cell/ quad body/ pan 119 dismantling, fabrication and erection of clear juice over flow box for juice clarifier including all accessories. 120 dismantling, fabrication & fitting of jet box in m.s. material 121 dismantling, fabrication, fitting of jet box in s s material 122 dismantling, fabrication & fitting of nipples 8” to 10” dia for jet box of condenser 123 dismantling, fabrication & erection of vapour pipe bend 36” to 40” dia from ms plate 124 pan a) dismantling & erection of pan tube plate 125 b) dismantling, fabrication & erection of calendria shell with 12 mm m.s. plates pan 126 dismantling, fabrication and erection of segment of pan shell 127 dismantling, fabrication and erection of complete pan shell including sight glass, man hole, provision of key sample, vacuum gauge, ammonia pipes ,glass washing pipe, cold water line connections and other accessories connected to body shell, umbrella including welding of m.s. angles for supports etc., top taper cone including connections of washing steam pipes etc., save all including j pipes etc, vapour pipe outlet nipple of save all, feed pipe connections etc. 128 dismantling, fabrication & erection of worn out feeding header of pans 129 replacement of c.i. cone (venture)of multijet condenser 130 dismantling’ fabrication & erection of molasses / m/c gutter 131 lifting of syrup sulphiter & connected pipe lines etc.to1.0mtr approx. height above the top level of syrup / molasses storage tanks at pan station. 132 dismantling, fabrication & erection of over head water tank, syrup/molasses tank complete in all respects i.e. welding of ms angles for strengthening of tanks, dismantling and erection of platform , ladders, railings. 133 replacement of pan down take 134 dismantling, fabrication & erection of rectangular coil of molasses tank 135 dismantling, fabrication & erection of save all from 8mm to 10mm 136 dismantling, fabrication & erection of save all from 8mm to 10mm ms plate excluding outer shell 137 dismantling ,fabrication & erection of vapour pipe 36’’ 40’’ dia 138 dismantling, fabrication & erection of molasses conditioner stirrer 139 a) dismantling . fabrication & erection of crystallizer cooling shaft 140 a) dismantling, fabrication & erection of cooling pipe coil in the crystallizer made from 4” dia pipe 141 b) patch work of crystallizer cooling shaft 142 vacuum crystallizer / dry seed crystallizer (i) dismantling, fabrication & erection of complete shell or its part along with dismantling, erection & alignment of complete drive system 143 installation, fabrication and erection jobs of plentary gear box: na)dismantling of existing gear box, motors, .worm and worm wheel &fabrication of foundation bed and erection of plentary gear box. n 144 worm and worm wheel, gland housing of crystallizers: a)dismantling and erection of existing worm and worm wheel, gear box, motor and alignment work of worm and worm wheel, gear box and motor for satisfactory trial. 145 b)dismantling and erection of gland housing of crystallizer shaft. 146 dismantling, fabrication and erection of shaft with arms of dry seed crystallizer / vacuum crystallizer. 147 dismantling, fabrication and erection of agitator arms of juice sulphitoror dry seed crystallizer or vacuum crystallizer. 148 replacement of all arms of air cooled crystallizer. 149 dismantling, fabrication and erection of circular bottom portion of magma mixer. 150 magma mixer ndismantling ,fabrication &erection of magma mixer including shaft / arms / drive etc. n 151 dismantling and erection of existing syrup/ molasses/ magma pipe lines for their internal/external cleaning 152 replacement of transient heater tubes with tube plates 153 dismantling of old transient heater and erection of new transent heater 154 hoppers a) dismantling, fabrication & erection of deck piece & alignments of hopper 155 b) dismantling, fabrication & erection of hopper piece 156 dismantling, fabrication & erection of hopper piece including multi trays. 157 d) dismantling, fabrication & erection of hopper complete. 158 fabrication of bucket for sugar elevator / dry seed elevator 159 for spray pond one side na) fabrication of ss pipe line up to 12” dia from 4 mm thick ss plate n 160 b) fabrication of ss cluster for fitting 2” size pipe with nozzles n ( as fitted in existing clusters) n 161 c) threading in 2” dia ss pipe line for fitting nozzles 162 fabrication of balanced single/double stage fan / impeller having outer dia up to 18” and width up to 5” for air blower of hopper as per existing. 163 fabrication of balanced fan/impeller for exhaust blower having od 23” & width 14” approx. as existing for batch type centrifugal machines. 164 fabrication and erection of complete casing having outer dia for circular portion from 20” to 22” approx. as existing for hot / cold air blower of hoppers. 165 fabrication and erection of complete casing having outer dia for circular portion 32” approx as existing exhaust blower of batch type centrifugal machines. 166 dismantling and erection of sugar grader of side plate including modification of structure. 167 dismantling, fabrication & erection of discharge chute of batch type c/f machine 168 replacement of transient heater tubes with tube plates 169 dismantling of old transient heater and erection of new transent heater 170 fabrication & erection of new heating unit of hot air blower including its shell and tube plate, fitted with new tubes for hopper no. 2 171 dismantling c/f machine including water, steam connection and discharge chute 172 erection c/f machine including water, steam connection and discharge chute including modification of staging / structure 173 dismantling of juice heater along with connected pipe line and valve up to 2 mtr. 174 dismantling, fabrication & erection of roof for final molasses tank 175 dismantling, fabrication & erection of shell for final molasses tank ...

Punjab State Power Corporation Limited - Punjab

24298975 design, engineering, manufacture, shop fabrication, preassembly, shop testing/type testing at manufacturer’s works, packing, transportation, unloading, handling and conservation of equipment at site, complete services of construction including erection, supervision, pre commissioning, commissioning and performance testing of equipments under bidder’s scope of work of dry sorbent injection (dsi) system using sodium bicarbonate as reagent and its associated auxiliaries including all associated electrical, control & instrumentation, civil, structural and architecture works as detailed in tender specifications for flue gas desulphurisation (fgd) system package at 4x 210 mw units(stage ii & iii) of ggsstp, roopnagar....

Punjab State Power Corporation Limited - Punjab

24163083 design, engineering, manufacture, shop fabrication, preassembly, shop testing/type testing at manufacturer’s works, packing, transportation, unloading, handling and conservation of equipment at site, complete services of construction including erection, supervision, pre commissioning, commissioning and performance testing of equipments under bidder’s scope of work of dry sorbent injection (dsi) system using sodium bicarbonate as reagent and its associated auxiliaries including all associated electrical, control & instrumentation, civil, structural and architecture works as detailed in tender specifications for flue gas desulphurisation (fgd) system package at 4x 210 mw units(stage ii & iii) of ggsstp, roopnagar....

Punjab State Power Corporation Limited - Punjab

23899768 design, engineering manufacture, shop fabrication, preassembly, shop testing/type testing at manufacturers works, packing. transportation, unloading, handling and conservation of equipment at site, complete services of construction including erection, supervision, pre commissioning, commissioning and performance testing of equipments under bidders scope of work of dry sorbent injection (dsi) system using sodium bicarbonate as reagent and its associated auxiliaries including all associated electrical, control & instrumentation, civil, structural and architecture works as detailed in tender specifications for flue gas desulphurisation (fgd) system package...

Punjab State Power Corporation Limited - Punjab

23440822 tender for routine preventive , breakdown and shutdown maintenance of ci equipments , instruments , measurement , interlocks system , annunciation system , flue gas analyzers , steam and water analysis system , etc . installed at ghtp on lump...

Nabha Power Limited - Punjab

23315438 tender for project management a engineering consultancy services for wet limestone based flue gas desulphurization system at 2 x 700 mw rajpura thermal power plant (a) project management & engineering consultancy services (b) site quality assurance & manufacturing inspection services....

Nabha Power Limited - Punjab

23315437 tender for project management a engineering consultancy services for wet limestone based flue gas desulphurization system at 2 x 700 mw rajpura thermal power plant (a) project management & engineering consultancy services (b) site quality assurance & manufacturing inspection services....

Punjab State Power Corporation Limited - Punjab

20907204 tender for design, engineering, manufacture, shop fabrication, preassembly, shop testing/type testing at manufacturer’s works, packing, transportation, unloading, handling and conservation of equipment at site, complete services of construction including erection, supervision, pre commissioning, commissioning and performance testing of equipments under bidder’s scope of work of dry sorbent injection (dsi) system using sodium bicarbonate as reagent and its associated auxiliaries including all associated electrical, control & instrumentation, civil, structural and architecture works as detailed in tender specifications for flue gas desulphurisation (fgd) system package at 4x 210 mw units(stage ii & iii) of ggsstp, roopnagar...

Institute of Nano Science and Technology - Punjab

20166227 annual rate contract for re filling of various analytical gas 1 argon 2 carbon dioxide per kg 3 nh3 (ammonia) 4 helium 5 hydrogen 6 nitrogen 7 oxygen 8. zero air 9. ch4 (methane) 99.999% 10. (argon 90% + hydrogen10 %) 11. (argon 95% + hydrogen 05 %) 12. (ammonia 10% + helium 90 %) 13. ethane 14. (argon 80% + hydrogen 20 %) 15. carbon monoxide 16. flue gas (12% co2 + 7% o2 + 1500ppm so2 + 470 ppm nox + balance n2)...

Punjab State Power Corporation Limited - Punjab

18947113 tender for preventive, breakdown & shutdown maintenance of c&i equipments/instruments, measurement & interlocks system, annunciation system, flue gas analyzers, steam & water analysis system, etc., installed at 2x210mw stage 1 and 2x250mw stage 2, guru hargobind thermal plant (ghtp), lehra mohabbat, distt.: bathinda, punjab as per details given in the tender specifications for a period of one year’...

Nabha Power Limited - Punjab

18389540 request for qualification (rfq) for installation of wet limestone based flue gas desulphurization system....

Nabha Power Limited - Punjab

18199271 request for qualification for installation of wet limestone based flue gas desulphurization system....

Nabha Power Limited - Punjab

17510297 request for qualification (rfq) for installation of wet limestone based flue gas desulphurization system....

Vedanta - Punjab

16462672 tender for implementing wet lime flue gas desulphurization system & selective non catalytic reduction system...

Nabha Power Limited - Punjab

16274123 tender for installation of wet limestone based flue gas desulphurization system with wet stacks. comprehensive o&m for 10 year including procurement of limestone and sale gypsum....

Nabha Power Limited - Punjab

16085144 request for qualification (rfq) installation of wet limestone based flue gas desulphurization (fgd) system with wet stacks; comprehensive o&m for 10 years including procurement of limestone and sale of gypsum for 2x700 coal based thermal power plant...

Punjab State Power Corporation Limited - Punjab

14844974 preventive, breakdown & shutdown maintenance of c&i equipments/instruments, measurement & interlocks system, annunciation system, flue gas analyzers, steam & water analysis system, etc. installed at 2x210mw stage 1 and 2x250mw stage 2 guru hargobind thermal plant (ghtp), lehra mohabbat....

Vedanta - Punjab

14749062 implementing wet lime flue gas desulphurization system & selective non catalytic reduction system...

Punjab State Power Corporation Limited - Punjab

11305721 routine maintenance, breakdown maintenance, periodical / preventive maintenance and shutdown overhauling of c and i equipment instruments, installed in interlocks and measurement system, annunciation system, flue gas analyzers, steam and water analysis system under additional superintending engineering...